My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2.b PCSR 05-23-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2023
>
05-23-2023
>
4.2.b PCSR 05-23-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 9:34:51 AM
Creation date
5/17/2023 9:28:55 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
5/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT APPLICATION TO THE CITY OF ELK RIVER <br />APRIL 2023 <br />Conditional Use Permit <br /> 3.1 <br /> <br />3.0 CONDITIONAL USE PERMIT <br />3.1 EXISTING CONDITIONS AND DEVELOPMENT PLAN <br />Per City Code, a site plan showing existing conditions is included in Attachment 3. The proposed <br />development plan for the subject property is included as Figure 3. Development of the stormwater <br />management pond within the subject property will take place as mining activities progress; the exact <br />schedule is dependent on mining operations and soils obtained for Landfill operations and construction. <br />3.2 LEGAL DESCRIPTION OF THE SUBJECT PROPERTY <br />See Attachment 1. <br />3.3 PROJECT NARRATIVE <br />A description of the project is provided in Section 1.1. The Conditional Use Permit application form <br />requests additional information for a project narrative. The descriptions are itemized in italics below, <br />followed by ERL’s responses. <br />Hours of operation <br />No change is proposed to the current hours of operation. <br />Number of employees <br />The proposed changes will not impact the number of employees required at the landfill. <br />Number of parking stalls (existing and additional) <br />The Landfill employees park their vehicles at the sites' office building located on the north <br />side of the existing Landfill. There are 20 parking stalls located at the office building site as <br />well as ample room for parking in the yard area to the north of the building. No additional <br />parking stalls are proposed as part of the stormwater management system improvements. <br />Is there proposed screening of the site? <br />The proposed Landscape/Screening plan is included in Attachment 2. The plan has been <br />revised from the previously approved screening plan to accommodate the additional land <br />area and grading modifications. <br />Note that trees shown in the Landscape/Screening plan would be installed after waste filling <br />activities in the adjacent landfill area have ceased and final cover construction is complete <br />on the south side of the landfill. <br />Proposed building materials
The URL can be used to link to this page
Your browser does not support the video tag.