My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 04-03-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
04-03-2023
>
4.3 SR 04-03-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 2:24:31 PM
Creation date
3/30/2023 2:22:06 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/3/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
����� <br />•_ ����� <br />Hydro-Klean, LLC <br />333 NW 49th Place <br />Des Moines, IA, 50313 <br />Phone: 515-283-0500 <br />City of Elk River, MN <br />248 Railroad Drive <br />Elk River MN 55330 <br />United States of America <br />Quote Nbr.: <br />Order Date: <br />Valid Until: <br />Sales Person: <br />Customer ID: <br />Payment Terms: <br />City of Elk River, MN <br />248 Railroad Drive <br />Elk River MN 55330 <br />United States of America <br />Q007201 <br />03/21 /2023 <br />06/19/2023 <br />Michele McGreal <br />100363 <br />Net 30 Days <br />.- <br />Projected probable project cost to perform the following tasks on a unit cost basis: Variations in the work scope will require <br />execution of a change order. <br />Location of Work: Elk River, MN. <br />Project Name: Elk River CIPP 2023. <br />Job Description: Install CIPP as identified on provided map. Footages are estimated, actual lengths will be invoiced. Owner to <br />provide clear access to exposed manholes, water, dumpsite, major traffic control, any permits and equipment retrieval if <br />necessary. Obstruction removal and infiltration grouting or preliner, if required, will be considered extra. Pipe conditions are <br />constantly changing and may need additional attention prior to lining. Prices do not include Prevailing Wage. <br />'� � • <br />1 Mobilization 1.0000 EACH 5,940.0000 5,940.00 <br />2 8" Prep 1,323.0000 FOOT 10.9000 14,420.70 <br />3 Protruding Taps or Mineral Deposits, If Any 1.0000 EACH 250.0000 250.00 <br />4 8" CIPP Lining 1,323.0000 FOOT 31.2000 41,277.60 <br />5 Reinstates 1.0000 EACH 75.0000 75.00 <br />*NOTE: Quote does not include any applicable taxes <br />Prepared By: Michele McGreal Accepted By: <br />Approved By: Wade Anderson Date: <br />PO#: <br />*Quote Total: 61,963.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.