My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 03-20-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
03-20-2023
>
4.3 SR 03-20-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2023 11:35:51 AM
Creation date
3/17/2023 10:32:51 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/20/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
At a minimum attach each of the following to the EAW: <br />• County map showing the general location of the project; (See Appendix A— Figure 1) <br />• U.S. Geological Survey 7.5 minute, 124,000 scale map indicating projectboundaries (photocopy <br />acceptable); (See Appendi� A— Figure 2) <br />• Site plans showing all significant project and natural features. Pre-construction site plan and post- <br />construction site plan. (See ExhibitA) <br />6. Project Description: <br />a. Provide the briefproject summary to be published in the EQB Monitor, (approximately 50 <br />words). <br />Lennar Corporation is proposing construction of a residential development located at in the City <br />ofElkRiver, Sherburne County, Minnesota. The project will include the construction of <br />approximately 433 single family homes and 180 multi family housing units as well as <br />infi^astructure such as roads, utilities, walks/ti^ails, and stormwater ponds. <br />b. Give a complete description of the proposed project and related new construction, including <br />infrastructure needs. If the project is an expansion include a description of the existing facility. <br />Emphasize: 1) construction, operation methods and features that will cause physical <br />manipulation of the environment or will produce wastes, 2) modifications to existing equipment <br />or industrial processes, 3) significant demolition, removal or remodeling of existing structures, <br />and 4) timing and duration of construction activities. <br />1) Construction activities that will manipulate the environment will include tree removals, <br />site earthwork, utility installation, and the construction of housing units, roads, <br />walks/trails, and stormwater ponds. <br />2) N/A <br />3) Removal of existing structures will consist of the demolition of an existing pole barn <br />shed. <br />4) Site preparation work is anticipated to begin as soon as the Fall of 2022. Site <br />construction is anticipated to take place over the course offour phases which will occur <br />over the course of multiple years dependent upon market conditions. <br />c. Project magnitude: <br />Total Project Acreage 252.47 (Main Project) <br />15.25 (Ghost Plats) <br />267.72 (Total) <br />Linear roject len th N/A <br />Number and type of residential units 41 S Single Family Homes (Main Project) <br />120 Multi-Family Homes (Main Project) <br />14 Single Family Homes (Ghost Plats) <br />60 Multi-Family Homes (Ghost Plats) <br />429 Single Family Homes (Total) <br />180 Multi-Famil Homes (Total) <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.