Laserfiche WebLink
Project Manual Houlton Conservation Area Bank Stabilization — Dam Site <br />7.10 Shop Drawings, Samples, and OtherSubmittals <br />A. Contractor shall review and coordinate the shop drawing and samples with the requirements <br />of the Work and the Contract Documents and shall verify all related field measurements, <br />quantities, dimensions, specified performance and design criteria, installation requirements, <br />materials, catalog numbers, and similar information. <br />B. Each submittal shall bear a stamp or specific written certification that Contractor has satisfied <br />Contractor's obligations under the Contract Documents with respect to Contractor's review <br />of that submittal, and that Contractor approves the submittal. <br />C. With each submittal, Contractor shall give Engineer specific written notice, in a <br />communication separate from the submittal, of any variations that the shop drawing or <br />sample may have from the requirements of the Contract Documents. <br />D. Engineer will provide timely review of shop drawings and samples. <br />E. Engineer's review and approval will not extend to means, methods, techniques, sequences, <br />or procedures of construction or to safety precautions or programs. <br />F. Engineer's review and approval of a separate item does not indicate approval of the assembly <br />in which the item functions. <br />G. Contractor shall make corrections required by Engineer and shall return the required number <br />of corrected copies of shop drawings and submit, as required, new samples for review and <br />approval. Contractor shall direct specific attention in writing to revisions other than the <br />corrections called for by Engineer on previous submittals. <br />H. Shop drawings are not Contract Documents. <br />7.11 Warranties and Guarantees <br />A. Contractor warrants and guarantees to Owner that all Work will be in accordance with the <br />Contract Documents and will not be defective. Engineer and its officers, directors, members, <br />partners, employees, agents, consultants, and subcontractors shall be entitled to rely on <br />Contractor's warranty and guarantee. <br />7.12 Correction Period <br />A. If within one year after the date of substantial completion, any Work is found to be defective, <br />or if the repair of any damages to the Site, adjacent areas that Contractor has arranged to <br />use through construction easements or otherwise, and other adjacent areas used by <br />Contractor as permitted by Laws and Regulations, is found to be defective, then Contractor <br />shall promptly and without cost to Owner, correct such defective Work. <br />7.13 Indemnification <br />A. To the fullest extent permitted by Laws and Regulations, and in addition to any other <br />obligations of Contractor under the Contract or otherwise, Contractor shall indemnify and <br />hold harmless Owner and Engineer, and the officers, directors, members, partners, <br />employees, agents, consultants and subcontractors of each and any of them from and against <br />all claims, costs, losses, and damages (including but not limited to all fees and charges of <br />engineers, architects, attorneys, and other professionals and all court or arbitration or other <br />dispute resolution costs) arising out of or relating to the performance of the Work, provided <br />Division 00 Section 00 52 00-8 <br />Contracting Requirements Contract for Construction <br />EJCDC� G522, Copyright O 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society <br />of Civil Engineers. All rights reserved. <br />