Project Manual
<br />Houlton Conservation Area Bank Stabilization — Dam Site
<br />B. Contractor shall bear all resulting costs and losses, and shall indemnify and hold harmless
<br />Owner and Engineer, and the officers, directors, members, partners, employees, agents,
<br />consultants, and subcontractors of each and any of them from and against all claims, costs,
<br />losses, and damages if Contractor performs any Work or takes any other action knowing or
<br />having reason to know that it is contrary to Laws or Regulations.
<br />C. Contractor shall pay all applicable sales, consumer, use, and other similar taxes Contractor is
<br />required to pay in accordance with Laws and Regulations.
<br />7.08 Record Documents
<br />A. Contractor shall maintain one printed record copy of all Drawings, Specifications, Addenda,
<br />Change Orders, Work Change Directives, Field Orders, written interpretations and
<br />clarifications, and approved shop drawings in a safe place at the Site. Contractor shall
<br />annotate them to show changes made during construction. Contractor shall deliver these
<br />record documents to Engineer upon completion of the Work.
<br />7.09 Safety and Protection
<br />A. Contractor shall be solely responsible for initiating, maintaining, and supervising all safety
<br />precautions and programs in connection with the Work.
<br />B. Contractor shall take all necessary precautions for the safety of, and shall provide the
<br />necessary protection to prevent damage, injury, or loss to:
<br />1. All persons on the Site or who may be affected by the Work;
<br />2. All the Work and materials and equipment to be incorporated therein, whether in
<br />storage on or off the Site; and
<br />3. Other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
<br />pavements, roadways, structures, other work in progress, utilities, and underground
<br />facilities not designated for removal, relocation, or replacement in the course of
<br />construction.
<br />C. All damage, injury, or loss to any property caused, directly or indirectly, in whole or in part,
<br />by Contractor, or anyone for whose acts the Contractor may be liable, shall be remedied by
<br />Contractor at its expense (except damage or loss attributable to the fault of Contract
<br />Documents or to the acts or omissions of Owner or Engineer and not attributable, directly or
<br />indirectly, in whole or in part, to the fault or negligence of Contractor).
<br />D. Contractor shall be responsible for coordinating any exchange of material safety data sheets
<br />or other hazard communication information required to be made available to or exchanged
<br />between or among employers at the Site in accordance with Laws or Regulations.
<br />E. In emergencies affecting the safety or protection of persons or the Work or property at the
<br />Site or adjacent thereto, Contractor shall act to prevent threatened damage, injury, or loss.
<br />Contractor shall give Engineer prompt written notice if Contractor believes that any
<br />significant changes in the Work or variations from the Contract Documents have been caused
<br />thereby or are required as a result thereof. If Engineer determines that a change in the
<br />Contract Documents is required because of the action taken by Contractor in response to
<br />such an emergency, a Work Change Directive or Change Order will be issued.
<br />Division 00 Section 00 52 00-7
<br />Contracting Requirements Contract for Construction
<br />EJCDC� G522, Copyright O 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society
<br />of Civil Engineers. All rights reserved.