8.3 SR 02-06-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
02-06-2023
>
8.3 SR 02-06-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:09:32 PM
Creation date
2/3/2023 9:58:45 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Prioritize gravity flow over pressurized flow; <br />2. Maintain a minimum cover depth of 7.5-feet; <br />3. Minimize gravity sewer depth installation deeper than 30-feet; <br />4. Design gravity trunk sewermains to flow 85-percent full under peak hourly flow conditions; <br />5. Install gravity sewer pipe per the minimum Ten-States Standards' recommended slopes; <br />6. Design forcemains to maintain flow velocities between 2.0 and 5.0 fps; <br />7. Design forcemains to maintain headloss gradients below 10 ft per 1,000 ft; <br />8. Recommend lift stations firm capacities that exceed by 25-percent the projected peak hourly flows; <br />9. Lift station design shall be submersible type with a wet well and a valve vault; and <br />10. Limit wet well depths to 35-feet when possible. <br />A summary of the recommended sanitary sewer infrastructure for the northeast study areas is listed below: <br />Trunk Sewermain (gravity flow): It is recommended to install trunk sewermains ranging from 10- <br />inch to 18-inch diameter along Cleveland Street NW and Twin Lakes Road NW to minimize the <br />need for lift stations. Eight-inch sewermains can be extended beyond the trunk mains to serve the <br />remaining portions of the study area. <br />Lift Stations (pressurized flow): Although the ground elevations throughout the study area are <br />conducive to maximizing gravity flow, trunk lift stations are still required to pump wastewater. At <br />least three trunk lift stations will be needed to serve the study area. Additional smaller lift stations <br />orsmall low pressure systems may be needed to serve minor portions ofthe study area as indicated <br />in Figure A20. The need for these lift stations will depend on the final grading within particular <br />developments near the wetland areas. A summary of the recommended trunk lift stations is shown <br />in Table 4.9. Each lift station's wet well depth is the minimum recommended depth to serve the <br />sewersheds identified in Figure A20. Deeper wet wells can be installed if a more conservative <br />design is desired. <br />Table 4.9 — Preliminary Northeast Lift Station Design�'� <br />Ultimate Initial Firm Ultimate Firm No. Min. Wet Forcemain <br />Peak Pumping Pumping Pumps Forcemain <br />Name Well Diameter <br />Hourly Flow Capacity Capac(ty (Initial/ Depth (ft) Quantity (inch) <br />(gpm) (gpm) (gpm) Ultimate) <br />Regional 1,100 500 — 750 1,500 2/3 41 Dual 8& 12 <br />West 140 185 185 2 35 Single 6 <br />North 170 225 225 2 20 Single 6 <br />(1) Ultfmate firm pumpfng desfgn capacftfes and forcemafn dfameters shall be revfsed durfng each Ifft statfon's desfgn phase based <br />on final development densities. <br />(2) Initially, two (2) 750 gpm pumps can be installed at the Regional Lift Station. As development increases, a third 750-gpm pump <br />can be added to increase the lift station's firm pumping capacity to 1,500 gpm. <br />Wastewater pumped by the northeast Regional Lift Station will be conveyed via dual forcemain directly into <br />the City's VWVfP. Because of this, it is likely that a new receiving structure will be needed at the facility. <br />Initially, the 8-inch forcemain alone can be used when the lift station's pumping capacity is lower and both <br />forcemains can be used as the lift station's pumping capacity increases over time. It is recommended to <br />install both forcemains at the same time to reduce installation costs. Air release valve manholes should be <br />installed at the high points of the forcemains as shown in Figure A20. <br />4.6 System Evaluation and Capacity Analysis for Northwest Areas <br />A portion of the wastewater generated in the northwest areas will be pumped by the existing Windsor Lift <br />Station. As shown in Table 4.2, the Windsor Lift Station has an existing residual capacity of 196 gpm (or <br />82-percent). Peak hourly flow in this lift station's sewershed is projected to increase to approximately 300 <br />gpm for ultimate development conditions. Given that the existing lift station capacity is only 240 gpm, the <br />pumping capacity of this lift station may require upsizing in the future. Ultimate peak hourly flows for this <br />sewershed may never reach 300 gpm. Since the Windsor Lift Station has sufficient residual capacity for the <br />Feasibility Report <br />Northeast & Northwest Urban Service Area Expansion Study <br />City of Elk River, MN <br />WSB Project No. 020010-000 <br />Page 19 <br />