My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 SR 01-17-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
01-17-2023
>
4.4 SR 01-17-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 8:37:41 AM
Creation date
1/13/2023 9:50:28 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Hall Reroof <br />Ell< River, Minnesota <br />including the repairs, adjustments, or other work that may be necessary by such defects. In the event <br />that the Contractor should fail to make such repairs, adjustments, or other work that may be necessary <br />by such defects, the Owner may do so and charge the Contractor the cost thereby incurred. The <br />Performance Bond shall remain in fully force and effect through the guarantee period. <br />S-5 Scope of Work <br />The specifications of Division S, together with the plans, describe in detail the work <br />to be completed on the project. The Contractor shall be responsible for all work and its proper <br />completion except as explicitly noted. All work shall be completed in accordance with the pertinent <br />federal, state, and local codes and ordinances. In addition to the construction, the Contractor shall <br />protect, maintain, repair, and restore all subsurface and overhead structures directly or indirectly <br />disturbed, damaged, or affected by his operation. <br />S-6 Codes and Standards <br />Reference to codes and standards established by federal, state, and local agencies, or <br />the professional and trade societies and associations shall be to the latest edition at the time of contract <br />award. When conflicting information is given, the most restrictive shall apply. Any questions of intent <br />will be determined by the Engineer upon written request by the Contractor. <br />S-7 "Or Equal" Cause <br />Whenever a required material or article is shown on the Plans or in the Specifications <br />by using the name of a product or of a particular manufacturer, it is to be understood that other <br />products or materials which will adequately perform the required function may be considered equal <br />and satisfactory in the Engineer's opinion. A comparable product shall not be purchased or installed <br />without the Engineer's approval. A "Contract Change Order" shall be used if the Contract is to be <br />modified. <br />S-8 Additional Costs Incurred <br />If the Contractor feels that additional compensation should be paid due to an event <br />or condition that was unknown or unforeseen at the time the contract was awarded, the Contractor <br />shall notify the city representative in writing of the event or conditions prior to taking any action. Any <br />additional compensation must be agreed upon by all parties involved including, but not limited to, the <br />Contractor, City, and Engineer. Any additional compensation made shall be made through the use of <br />a change order. <br />S-9 Public Safety <br />The Contractor shall take the necessary precautions to protect the public and <br />employees from injury by hazardous circumstances by providing barricades, warning signs, flashers, <br />and other safety aids. The costs associated with all such items shall be considered incidental to the <br />project. <br />General Conditions 00800 - 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.