Laserfiche WebLink
m TarERoiv NumberStatic 05 <br />Terra 0 k River on #3 <br />City f E, k <br />MI CONSTRUCTION Cit of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 23 <br />Contractor's signed certification is attached. APPLICATION DATE: 12/31/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 12/31/22 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Horizon Roofing <br />07-7520 <br />7A& 7B <br />Roofing& Metal Wall Panels <br />$ 385,124.00 <br />$ - <br />$ - <br />$ 385,124.00 <br />$ 385,124.00 <br />$ 385,124.00 <br />100.00% <br />$ - <br />$ 19,256.20 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />CO#1 ASI#5 LT Angles <br />$ - <br />$ - <br />$ 5,750.00 <br />$ 5,750.00 <br />$ 5,750.00 <br />$ 5,750.00 <br />100.00% <br />$ - <br />$ 287.50 <br />Horizon Roofing <br />07-7520 <br />7A & 7B <br />CO#2 ASI#8R Reduction of Roof Membrane <br />$ - <br />$ - <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />100.00% <br />$ - <br />$ 130.00 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />CO#3 PR#14 Parapet Roofing Membrane <br />$ - <br />$ - <br />$ (1,650.00) <br />$ (1,650.00) <br />$ (1,650.00) <br />$ (1,650.00) <br />100.00% <br />$ - <br />$ (82.50) <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />CO#4 Overtime Work on 11/6 <br />$ - <br />$ - <br />$ 2,682.00 <br />$ 2,682.00 <br />$ 2,682.00 <br />$ 2,682.00 <br />100.00% <br />$ - <br />$ 134.10 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />CO#5 RFI#100 <br />$ - <br />$ - <br />$ 1,350.00 <br />$ 1,350.00 <br />$ 1,350.00 <br />$ 1,350.00 <br />100.00% <br />$ - <br />$ 67.50 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />CO#64th Floor Training Tower Roofing Membrane <br />$ - <br />$ - <br />$ (935.00) <br />$ (935.00) <br />$ (935.00) <br />$ (935.00) <br />100.00% <br />$ - <br />$ (46.75) <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />CO#7 Wall Reflashing at tops of Parapet Walls <br />$ - <br />$ - <br />$ 1,425.00 <br />$ 1,425.00 <br />$ 1,425.00 <br />$ 1,425.00 <br />100.00% <br />$ - <br />$ 71.25 <br />Horizon Roofing <br />07-7520 <br />7A & 7B <br />CO#8 Emergency Repairs on 12/17 <br />$ - <br />$ - <br />$ 1,325.00 <br />$ 1,325.00 <br />$ 1,325.00 <br />$ 1,325.00 <br />100.00% <br />$ - <br />$ 66.25 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />CO#9 Saddle Repair at existing saddle at North Training Tower <br />$ - <br />$ - <br />$ 2,980.00 <br />$ 2,980.00 <br />$ 2,980.00 <br />$ 2,980.00 <br />100.00% <br />$ - <br />$ 149.00 <br />Horizon Roofing <br />07-7520 <br />7A & 7B <br />CO Relocate Roof Vent <br />$ - <br />$ - <br />$ 750.00 <br />$ 750.00 <br />$ 750.00 <br />$ 750.00 <br />100.00% <br />$ - <br />$ 37.50 <br />Spec <br />07-7520 <br />RFI#163 Training Tower Roofing Membrane <br />$ - <br />$ 5,513.00 <br />$ 5,513.00 <br />$ 5,513.00 <br />$ 5,513.00 <br />100.00% <br />$ - <br />$ 275.65 <br />Sunrise Speciality <br />07-7900 <br />7D <br />Joint Sealants <br />$ 45,470.00 <br />$ - <br />$ - <br />$ 45,470.00 <br />$ 45,470.00 <br />$ 45,470.00 <br />100.00% <br />$ - <br />$ 2,273.50 <br />Sun rise Speciality <br />07-7900 <br />7D <br />CO#1 PR#2R Clerestory Head Detail <br />$ - <br />$ - <br />$ 35.00 <br />$ 35.00 <br />$ 35.00 <br />$ 35.00 <br />100.00% <br />$ - <br />$ 1.75 <br />Mid -Central Door <br />08-8200 <br />SA <br />Hardware <br />$ 41,653.67 <br />$ - <br />$ - <br />$ 41,653.67 <br />$ 41,653.67 <br />$ 41,653.67 <br />100.00% <br />$ - <br />$ 2,082.68 <br />Mid -Central Door <br />08-8200 <br />SA <br />HM Door <br />$ 22,208.67 <br />$ - <br />$ - <br />$ 22,208.67 <br />$ 22,208.67 <br />$ 22,208.67 <br />100.00% <br />$ - <br />$ 1,110.43 <br />Mid -Central Door <br />08-8200 <br />SA <br />HM Frame <br />$ 19,666.66 <br />$ - <br />$ - <br />$ 19,666.66 <br />$ 19,666.66 <br />$ 19,666.66 <br />100.00% <br />$ - <br />$ 983.33 <br />Mid -Central Door <br />08-8200 <br />SA <br />Specialty <br />$ 3,133.00 <br />$ - <br />$ - <br />$ 3,133.00 <br />$ 3,133.00 <br />$ 3,133.00 <br />100.00% <br />$ - <br />$ 156.65 <br />Mid -Central Door <br />08-8200 <br />SA <br />WD Door <br />$ 7,727.00 <br />$ - <br />$ - <br />$ 7,727.00 <br />$ 7,727.00 <br />$ 7,727.00 <br />100.00% <br />$ - <br />$ 386.35 <br />Mid -Central Door <br />08-8200 <br />SA <br />CO#1 Door Hardware Revisions (5/5/21) <br />$ - <br />$ - <br />$ 2,152.97 <br />$ 2,152.97 <br />$ 2,152.97 <br />$ 2,152.97 <br />100.00% <br />$ - <br />$ 107.65 <br />Mid -Central Door <br />08-8200 <br />SA <br />CO#2 Door Frame 108 Refab Door (From Camco) <br />$ - <br />$ - <br />$ 740.00 <br />$ 740.00 <br />$ 740.00 <br />$ 740.00 <br />100.00% <br />$ - <br />$ 37.00 <br />American Door Works <br />08-8361 <br />SB <br />Sectional Overhead Doors <br />$ 170,570.00 <br />$ - <br />$ - <br />$ 170,570.00 <br />$ 170,570.00 <br />$ 170,570.00 <br />100.00% <br />$ - <br />$ 8,528.50 <br />American Door Works <br />08-8361 <br />SB <br />CO#1 PR#2 Overhead Doors & Circuiting <br />$ - <br />$ - <br />$ (37,217.00) <br />$ (37,217.00) <br />$ (37,217.00) <br />$ (37,217.00) <br />100.00% <br />$ - <br />$ (1,860.85) <br />American Door Works <br />08-8361 <br />SB <br />CO#2 PR#12 Revised the 3 OH Doors <br />$ - <br />$ - <br />$ (36,410.00) <br />$ (36,410.00) <br />$ (36,410.00) <br />$ (36,410.00) <br />100.00% <br />$ - <br />$ (1,820.50) <br />Hallmark Glass <br />08-8800 <br />SC <br />Shop Drawings <br />$ 3,500.00 <br />$ - <br />$ - <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />100.00% <br />$ - <br />$ 175.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Bond <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />100.00% <br />$ - <br />$ 250.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Aluminum Labor <br />$ 32,630.00 <br />$ - <br />$ - <br />$ 32,630.00 <br />$ 32,630.00 <br />$ 32,630.00 <br />100.00% <br />$ - <br />$ 1,631.50 <br />Hallmark Glass <br />08-8800 <br />SC <br />Aluminum Material <br />$ 48,750.00 <br />$ - <br />$ - <br />$ 48,750.00 <br />$ 48,750.00 <br />$ 48,750.00 <br />100.00% <br />$ - <br />$ 2,437.50 <br />Hallmark Glass <br />08-8800 <br />SC <br />Door Hardware Labor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />100.00% <br />$ - <br />$ 150.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Door Hardware material <br />$ 26,000.00 <br />$ - <br />$ - <br />$ 26,000.00 <br />$ 26,000.00 <br />$ 26,000.00 <br />100.00% <br />$ - <br />$ 1,300.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Glass & Glazing Labor <br />$ 10,200.00 <br />$ - <br />$ - <br />$ 10,200.00 <br />$ 10,200.00 <br />$ 10,200.00 <br />100.00% <br />$ - <br />$ 510.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Glass& Glazing Material <br />$ 29,000.00 <br />$ - <br />$ - <br />$ 29,000.00 <br />$ 29,000.00 <br />$ 29,000.00 <br />100.00% <br />$ - <br />$ 1,450.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Arch Louvers Labor <br />$ 1,620.00 <br />$ - <br />$ - <br />$ 1,620.00 <br />$ 1,620.00 <br />$ 1,620.00 <br />100.00% <br />$ - <br />$ 81.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Arch Louvers Material <br />$ 3,800.00 <br />$ - <br />$ - <br />$ 3,800.00 <br />$ 3,800.00 <br />$ 3,800.00 <br />100.00% <br />$ <br />$ 190.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />CO#1 RFI#181 SF 140X SF Head Detail <br />$ - <br />$ - <br />$ 362.00 <br />$ 362.00 <br />$ 362.00 <br />$ 362.00 <br />100.00% <br />$ - <br />$ 18.10 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Framing- Material <br />$ 19,873.00 <br />$ - <br />$ - <br />$ 19,873.00 <br />$ 19,873.00 <br />$ 19,873.00 <br />100.00% <br />$ - <br />$ 993.65 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Insulation - Material <br />$ 5,063.00 <br />$ - <br />$ - <br />$ 5,063.00 <br />$ 5,063.00 <br />$ 5,063.00 <br />100.00% <br />$ - <br />$ 253.15 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Drywall- Material <br />$ 20,024.00 <br />$ - <br />$ - <br />$ 20,024.00 <br />$ 20,024.00 <br />$ 20,024.00 <br />100.00% <br />$ - <br />$ 1,001.20 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Taping/Finishing- Material <br />$ 2,930.00 <br />$ <br />$ - <br />$ 2,930.00 <br />$ 2,930.00 <br />$ 2,930.00 <br />100.00% <br />$ - <br />$ 146.50 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Sealants/Acoustical- Material <br />$ 2,500.00 <br />$ - <br />$ - <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />100.00% <br />$ - <br />$ 125.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />FRP - Material <br />$ 806.00 <br />$ - <br />$ - <br />$ 806.00 <br />$ 806.00 <br />$ 806.00 <br />100.00% <br />$ - <br />$ 40.30 <br />Page 4 / 11 <br />