Laserfiche WebLink
m TarERoiv NumberStatic 05 <br />Terra 0 k River on #3 <br />City f E, k <br />MI CONSTRUCTION Cit of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 23 <br />Contractor's signed certification is attached. APPLICATION DATE: 12/31/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 12/31/22 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Patriot Erectors <br />05-5121 <br />5B <br />C044 ASI#BR Roof Transition <br />$ - <br />$ - <br />$ 530.00 <br />$ 530.00 <br />$ 530.00 <br />$ 530.00 <br />100.00% <br />$ - <br />$ 26.50 <br />Patriot Erectors <br />05-5121 <br />5B <br />C045 RFI#92 Slab Edge Detail at Mezzanine Opening <br />$ - <br />$ - <br />$ 230.00 <br />$ 230.00 <br />$ 230.00 <br />$ 230.00 <br />100.00% <br />$ - <br />$ 11.50 <br />Patriot Erectors <br />05-5121 <br />5B <br />C046 PR#16 <br />$ - <br />$ - <br />$ 477.00 <br />$ 477.00 <br />$ 477.00 <br />$ 477.00 <br />100.00% <br />$ - <br />$ 23.65 <br />Patriot Erectors <br />05-5121 <br />5B <br />C047 RFI#103 Angles Above W1 Windows <br />$ - <br />$ - <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />100.00% <br />$ - <br />$ 21.20 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#B RFI#109 <br />$ - <br />$ - <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />100.00% <br />$ - <br />$ 10.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />C049 RFI#100 <br />$ - <br />$ - <br />$ 742.00 <br />$ 742.00 <br />$ 742.00 <br />$ 742.00 <br />100.00% <br />$ - <br />$ 37.10 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#10 RFI #101 <br />$ - <br />$ - <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />100.00% <br />$ - <br />$ 10.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#11 RFI#156 Additional Angle Iron for Fan <br />$ - <br />$ - <br />$ 1,612.00 <br />$ 1,612.00 <br />$ 1,612.00 <br />$ 1,612.00 <br />100.00% <br />$ - <br />$ 60.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#12 RFI#159 Training Tower Welding <br />$ - <br />$ - <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />100.00% <br />$ - <br />$ 21.20 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#13 RFI#140 Rapelling Anchors <br />$ - <br />$ - <br />$ 1,219.00 <br />$ 1,219.00 <br />$ 1,219.00 <br />$ 1,219.00 <br />100.00% <br />$ - <br />$ 60.95 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO Trash Gate <br />$ - <br />$ - <br />$ 1,027.00 <br />$ 1,027.00 <br />$ 1,027.00 <br />$ 1,027.00 <br />100.00% <br />$ - <br />$ 51.35 <br />Century Construction <br />06-6100 <br />6A <br />Performance & Payment Bond <br />$ 6,400.00 <br />$ - <br />$ - <br />$ 6,400.00 <br />$ 6,400.00 <br />$ 6,400.00 <br />100.00% <br />$ - <br />$ 320.00 <br />Ce ntury Construction <br />06-6100 <br />6A <br />Allowance <br />$ 10,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />100.00% <br />$ - <br />$ 500.00 <br />Century Construction <br />06-6100 <br />6A <br />Mobilization <br />$ 3,100.00 <br />$ - <br />$ - <br />$ 3,100.00 <br />$ 3,100.00 <br />$ 3,100.00 <br />100.00% <br />$ - <br />$ 155.00 <br />Century Construction <br />06-6100 <br />6A <br />Materials <br />$ 97,000.00 <br />$ - <br />$ - <br />$ 97,000.00 <br />$ 74,998.00 <br />$ 22,002.00 <br />$ 97,000.00 <br />100.00% <br />$ - <br />$ 4,850.00 <br />Century Construction <br />06-6100 <br />6A <br />Material Blocking <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,000.00 <br />$ 12,000.00 <br />$ 12,000.00 <br />100.00% <br />$ - <br />$ 600.00 <br />Century Construction <br />06-6100 <br />6A <br />Install Roof Blocking <br />$ 43,000.00 <br />$ - <br />$ - <br />$ 43,000.00 <br />$ 43,000.00 <br />$ 43,000.00 <br />100.00% <br />$ - <br />$ 2,150.00 <br />Century Construction <br />06-6100 <br />6A <br />Install In Wall Blocking <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />100.00% <br />$ - <br />$ 400.00 <br />Century Construction <br />06-6100 <br />6A <br />Cabinets and Millwork <br />$ 8,500.00 <br />$ <br />$ - <br />$ 8,500.00 <br />$ 8,500.00 <br />$ 8,500.00 <br />100.00% <br />$ - <br />$ 425.00 <br />Century Construction <br />06-6100 <br />6A <br />Specialties <br />$ 32,000.00 <br />$ - <br />$ - <br />$ 32,000.00 <br />$ 24,000.00 <br />$ 8,000.00 <br />$ 32,000.00 <br />100.00% <br />$ - <br />$ 1,600.00 <br />Century Construction <br />06-6100 <br />6A <br />Temp Enclosures <br />$ 6,000.00 <br />$ - <br />$ - <br />$ 6,000.00 <br />$ 6,000.00 <br />$ 6,000.00 <br />100.00% <br />$ - <br />$ 300.00 <br />Century Construction <br />06-6100 <br />6A <br />Doors & Hardware <br />$ 17,000.00 <br />$ - <br />$ - <br />$ 17,000.00 <br />$ 17,000.00 <br />$ 17,000.00 <br />100.00% <br />$ - <br />$ 650.00 <br />Century Construction <br />06-6100 <br />6A <br />C041 For Distinctive to Predrill Sill Angles <br />$ - <br />$ - <br />$ (676.41) <br />$ (676.41) <br />$ (676.41) <br />$ (676.41) <br />100.00% <br />$ - <br />$ (33.82) <br />Century Construction <br />06-6100 <br />6A <br />C042 PR#15 Flagpoles <br />$ - <br />$ - <br />$ (277.00) <br />$ (277.00) <br />$ (277.00) <br />$ (277.00) <br />100.00% <br />$ - <br />$ (13.85) <br />Century Construction <br />06-6100 <br />6A <br />C043 Disctinctive Predrill Holes for Operable Partition <br />$ - <br />$ - <br />$ (468.54) <br />$ (468.54) <br />$ (468.54) <br />$ (468.54) <br />100.00% <br />$ - <br />$ (23.43) <br />Century Construction <br />06-6100 <br />6A <br />C044 Wood Blockingat Heads of W1 (Used $655 of Allowance) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />C045 RFI#110 Wood Blocking <br />$ - <br />$ - <br />$ 534.35 <br />$ 534.35 <br />$ 534.35 <br />$ 534.35 <br />100.00% <br />$ - <br />$ 26.72 <br />Century Construction <br />06-6100 <br />6A <br />C046 Allowance Usage (Remaining $8,290) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />C047 Allowance Usage (Remaining $7,018) <br />$ - <br />$ - <br />$ (1,272.00) <br />$ (1,272.00) <br />$ (1,272.00) <br />$ (1,272.00) <br />100.00% <br />$ - <br />$ (63.60) <br />Century Construction <br />06-6100 <br />6A <br />CO#B PR#16Added Paper Towel/Trash Units <br />$ - <br />$ - <br />$ 2,248.00 <br />$ 2,248.00 <br />$ 2,248.00 <br />$ 2,248.00 <br />100.00% <br />$ - <br />$ 112.40 <br />Century Construction <br />06-6100 <br />6A <br />C049 CSI Div-10 Additional Charges <br />$ - <br />$ - <br />$ 2,335.50 <br />$ 2,335.50 <br />$ 67.50 <br />$ 2,248.00 <br />$ 2,335.50 <br />100.00% <br />$ - <br />$ 116.76 <br />Ce ntury Construction <br />06-6100 <br />6A <br />CO#10 Interior Signage <br />$ - <br />$ - <br />$ (572.82) <br />$ (572.82) <br />$ (572.82) <br />$ (572.82) <br />100.00% <br />$ - <br />$ (28.64) <br />Century Construction <br />06-6100 <br />6A <br />CO#11 Allowance Usage (Remaining $3930.50) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />CO#12 RFI#201 Bondo and Reinstall Door 106 <br />$ - <br />$ - <br />$ 479.27 <br />$ 479.27 <br />$ 479.27 <br />$ 479.27 <br />100.00% <br />$ - <br />$ 23.96 <br />Century Construction <br />06-6100 <br />6A <br />CO Pergola <br />$ - <br />$ - <br />$ (11,023.27) <br />$ (11,023.27) <br />$ - <br />$ (11,023.27) <br />$ (11,023.27) <br />100.00% <br />$ - <br />$ (551.16) <br />Century Construction <br />06-6100 <br />6A <br />CO Alternate Operable Partition <br />$ - <br />$ - <br />$ 9,544.91 <br />$ 9,544.91 <br />$ - <br />$ 9,544.91 <br />$ 9,544.91 <br />100.00% <br />$ - <br />$ 477.25 <br />Niche Visual <br />06-6100 <br />Raise Exterior Sign <br />$ - <br />$ - <br />$ 1,900.00 <br />$ 1,900.00 <br />$ - <br />$ 1,900.00 <br />$ 1,900.00 <br />100.00% <br />$ - <br />$ 95.00 <br />Northern Woodwork <br />06-6400 <br />6B <br />Architectural Millwork <br />$ 45,900.00 <br />$ - <br />$ - <br />$ 45,900.00 <br />$ 45,900.00 <br />$ 45,900.00 <br />100.00% <br />$ - <br />$ 2,295.00 <br />Northern Woodwork <br />06-6400 <br />6B <br />C041 PR#16 <br />$ - <br />$ - <br />$ 165.00 <br />$ 165.00 <br />$ 165.00 <br />$ 165.00 <br />100.00% <br />$ - <br />$ 6.25 <br />Quality Coatings <br />07-7210 <br />7C <br />Fluid Applied Air Barrier <br />$ 38,600.00 <br />$ - <br />$ - <br />$ 38,600.00 <br />$ 38,600.00 <br />$ 38,600.00 <br />100.00% <br />$ - <br />$ 1,930.00 <br />Quality Coatings <br />07-7210 <br />7C <br />C041 ASI#BR Removal of Tranisition Membrane <br />$ - <br />$ - <br />$ (800.00) <br />$ (800.00) <br />$ (800.00) <br />$ (800.00) <br />100.00% <br />$ - <br />$ (40.00) <br />Quality Coatings <br />07-7210 <br />7C <br />C042 Remove and Reinstall AS at W1 <br />$ - <br />$ - <br />$ 1,590.00 <br />$ 1,590.00 <br />$ 1,590.00 <br />$ 1,590.00 <br />100.009 <br />$ - <br />$ 79.50 <br />Quality Coatings <br />07-7210 <br />7C <br />C043 PR#20 <br />$ - <br />$ - <br />$ (200.00) <br />$ (200.00) <br />$ (200.00) <br />$ (200.00) <br />100.00% <br />$ - <br />$ (10.00) <br />Qua Iity Coatings <br />07-7210 <br />7C <br />Raise Exterior Sign <br />$ - <br />$ - <br />$ 925.00 <br />$ 925.00 <br />$ 925.00 <br />$ 925.00 <br />100.00% <br />$ - <br />$ 46.25 <br />Page 3 / 11 <br />