Laserfiche WebLink
m TarERoiv NumberStatic 05 <br />Terra 0 k River on #3 <br />City f E, k <br />MI CONSTRUCTION Cit of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 23 <br />Contractor's signed certification is attached. APPLICATION DATE: 12/31/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 12/31/22 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Dryden Excavating <br />31-1000 <br />31A <br />Building Sand Cushion Material <br />$ 629.00 <br />$ - <br />$ - <br />$ 629.00 <br />$ 629.00 <br />$ 629.00 <br />100.00% <br />$ - <br />$ 31.45 <br />Dryden Excavating <br />31-1000 <br />31A <br />Class 5 Labor <br />$ 9,014.00 <br />$ - <br />$ - <br />$ 9,014.00 <br />$ 9,014.00 <br />$ 9,014.00 <br />100.00% <br />$ - <br />$ 450.70 <br />Dryden Excavating <br />31-1000 <br />31A <br />Class 5 Material <br />$ 7,854.00 <br />$ - <br />$ - <br />$ 7,854.00 <br />$ 7,854.00 <br />$ 7,854.00 <br />100.00% <br />$ - <br />$ 392.70 <br />Dryden Excavating <br />31-1000 <br />31A <br />Subgrade Prep Labor <br />$ 8,595.00 <br />$ - <br />$ - <br />$ 8,595.00 <br />$ 8,595.00 <br />$ 8,595.00 <br />100.00% <br />$ - <br />$ 429.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Dewatering Labor <br />$ 2,625.00 <br />$ - <br />$ - <br />$ 2,625.00 <br />$ 2,625.00 <br />$ 2,625.00 <br />100.00% <br />$ - <br />$ 131.25 <br />Dryden Excavating <br />31-1000 <br />31A <br />SWPP Permit <br />$ 525.00 <br />$ - <br />$ - <br />$ 525.00 <br />$ 525.00 <br />$ 525.00 <br />100.00% <br />$ - <br />$ 26.25 <br />Dryden Excavating <br />31-1000 <br />31A <br />Silt Fence Labor <br />$ 2,240.00 <br />$ - <br />$ - <br />$ 2,240.00 <br />$ 2,240.00 <br />$ 2,240.00 <br />100.00% <br />$ - <br />$ 112.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Silt Fence Material <br />$ 700.00 <br />$ - <br />$ - <br />$ 700.00 <br />$ 700.00 <br />$ 700.00 <br />100.00% <br />$ - <br />$ 35.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Inlet Protection Labor <br />$ 2,502.00 <br />$ - <br />$ - <br />$ 2,502.00 <br />$ 2,502.00 <br />$ 2,502.00 <br />100.00% <br />$ - <br />$ 125.10 <br />Dryden Excavating <br />31-1000 <br />31A <br />Construction Entrance Labor <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />100.00% <br />$ - <br />$ 100.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Construction Entrance Materials <br />$ 100.00 <br />$ - <br />$ - <br />$ 100.00 <br />$ 100.00 <br />$ 100.00 <br />100.00% <br />$ - <br />$ 5.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Hydro Seed <br />$ 1,166.00 <br />$ - <br />$ - <br />$ 1,166.00 <br />$ 1,166.00 <br />$ 1,166.00 <br />100.00% <br />$ - <br />$ 56.30 <br />Dryden Excavating <br />31-1000 <br />31A <br />Flex Mat Labor <br />$ 700.00 <br />$ - <br />$ - <br />$ 700.00 <br />$ 700.00 <br />$ 700.00 <br />100.00% <br />$ - <br />$ 35.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Flex Mat Material <br />$ 3,266.00 <br />$ - <br />$ - <br />$ 3,266.00 <br />$ 3,266.00 <br />$ 3,266.00 <br />100.00% <br />$ - <br />$ 163.30 <br />Dryden Excavating <br />31-1000 <br />33A <br />Mobilization, Bond, Permits <br />$ 20,504.16 <br />$ - <br />$ - <br />$ 20,504.16 <br />$ 20,504.16 <br />$ 20,504.16 <br />100.00% <br />$ - <br />$ 1,025.21 <br />Dryden Excavating <br />31-1000 <br />33A <br />Water Utilities Labor <br />$ 25,719.19 <br />$ - <br />$ - <br />$ 25,719.19 <br />$ 25,719.19 <br />$ 25,719.19 <br />100.00% <br />$ - <br />$ 1,285.96 <br />Dryden Excavating <br />31-1000 <br />33A <br />Water Utilities Material <br />$ 52,306.23 <br />$ - <br />$ - <br />$ 52,306.23 <br />$ 52,306.23 <br />$ 52,306.23 <br />100.00% <br />$ - <br />$ 2,615.31 <br />Dryden Excavating <br />31-1000 <br />33A <br />Wet Tap Labor <br />$ 239.22 <br />$ - <br />$ - <br />$ 239.22 <br />$ 239.22 <br />$ 239.22 <br />100.00% <br />$ - <br />$ 11.96 <br />Dryden Excavating <br />31-1000 <br />33A <br />Wet Tap Material <br />$ 2,500.00 <br />$ - <br />$ - <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />100.00% <br />$ - <br />$ 125.00 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Piping Labor <br />$ 9,667.77 <br />$ - <br />$ - <br />$ 9,667.77 <br />$ 9,667.77 <br />$ 9,667.77 <br />100.00% <br />$ - <br />$ 463.39 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Piping Material <br />$ 91622.35 <br />$ - <br />$ - <br />$ 9,622.35 <br />$ 9,622.35 <br />$ 9,622.35 <br />100.00% <br />$ - <br />$ 461.12 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Manholes Labor <br />$ 1,808.00 <br />$ - <br />$ - <br />$ 1,808.00 <br />$ 1,808.00 <br />$ 1,808.00 <br />100.00% <br />$ - <br />$ 90.40 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Manholes Material <br />$ 9,425.00 <br />$ - <br />$ - <br />$ 9,425.00 <br />$ 9,425.00 <br />$ 9,425.00 <br />100.00% <br />$ - <br />$ 471.25 <br />Dryden Excavating <br />31-1000 <br />33A <br />Manhole Castings Labor <br />$ 691.20 <br />$ - <br />$ - <br />$ 691.20 <br />$ 691.20 <br />$ 691.20 <br />100.00% <br />$ - <br />$ 34.56 <br />Dryden Excavating <br />31-1000 <br />33A <br />Manhole Castings Material <br />$ 1,140.00 <br />$ - <br />$ - <br />$ 1,140.00 <br />$ 1,140.00 <br />$ 1,140.00 <br />100.00% <br />$ - <br />$ 57.00 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm - PVC Piping Labor <br />$ 8,024.15 <br />$ - <br />$ - <br />$ 8,024.15 <br />$ 8,024.15 <br />$ 8,024.15 <br />100.00% <br />$ - <br />$ 401.21 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm - PVC Piping Material <br />$ 10,992.34 <br />$ - <br />$ - <br />$ 10,992.34 <br />$ 10,992.34 <br />$ 10,992.34 <br />100.00% <br />$ - <br />$ 549.62 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm -Concrete Piping/Manholes Labor <br />$ 10,155.38 <br />$ - <br />$ - <br />$ 10,155.38 <br />$ 10,155.38 <br />$ 10,155.38 <br />100.00% <br />$ - <br />$ 507.77 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm -Concrete Piping/Manholes Material <br />$ 27,063.60 <br />$ - <br />$ - <br />$ 27,063.60 <br />$ 27,063.60 <br />$ 27,063.60 <br />100.00% <br />$ - <br />$ 1,353.18 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm - Castings/Grates Labor <br />$ 3,152.40 <br />$ - <br />$ - <br />$ 3,152.40 <br />$ 3,152.40 <br />$ 3,152.40 <br />100.00% <br />$ - <br />$ 157.62 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm - Castings/Grates Material <br />$ 52,068.00 <br />$ - <br />$ - <br />$ 52,068.00 <br />$ 52,068.00 <br />$ 52,068.00 <br />100.00% <br />$ - <br />$ 2,603.40 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#1 Additional Construction Entrances <br />$ - <br />$ - <br />$ 4,246.61 <br />$ 4,246.61 <br />$ 4,246.61 <br />$ 4,246.61 <br />100.00% <br />$ - <br />$ 212.33 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#2 PR#7 Water Service <br />$ - <br />$ - <br />$ (1,517.19) <br />$ (1,517.19) <br />$ (1,517.19) <br />$ (1,517.19) <br />100.00% <br />$ - <br />$ (75.86) <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#3 PR#4 Stepped Footings <br />$ - <br />$ - <br />$ 1,584.00 <br />$ 1,584.00 <br />$ 1,584.00 <br />$ 1,584.00 <br />100.00% <br />$ - <br />$ 79.20 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#4 ASI#2 <br />$ - <br />$ - <br />$ 6,096.75 <br />$ 6,096.75 <br />$ 6,096.75 <br />$ 6,096.75 <br />100.00% <br />$ - <br />$ 304.64 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#5 B/C Thomsen <br />$ - <br />$ - <br />$ (500.00) <br />$ (500.00) <br />$ (500.00) <br />$ (500.00) <br />100.00% <br />$ - <br />$ (25.00) <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#6 Overexcavate Footing Trenches for Rock <br />$ - <br />$ - <br />$ 21373.26 <br />$ 2,373.26 <br />$ 2,373.26 <br />$ 2,373.26 <br />100.00% <br />$ - <br />$ 116.66 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#7 Furnish and Install 3'' Rock for Pump Truck <br />$ - <br />$ - <br />$ 5,409.16 <br />$ 5,409.16 <br />$ 5,409.16 <br />$ 5,409.16 <br />100.00% <br />$ - <br />$ 270.46 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#B Install Temp Drain Pipe <br />$ - <br />$ - <br />$ 5,894.96 <br />$ 5,894.96 <br />$ 5,894.96 <br />$ 5,894.96 <br />100.00% <br />$ - <br />$ 294.75 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#9 C-900 Municipal Water Piping <br />$ - <br />$ - <br />$ 276.65 <br />$ 276.65 <br />$ 276.65 <br />$ 276.65 <br />100.00% <br />$ - <br />$ 13.93 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#10 Damaged Transformer- repaired by ERMU <br />$ - <br />$ - <br />$ (3,273.92) <br />$ (3,273.92) <br />$ (3,273.92) <br />$ (3,273.92) <br />100.00% <br />$ - <br />$ (163.70) <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#11 Revised Finished Grade at Trash Enclosure <br />$ - <br />$ - <br />$ 962.50 <br />$ 962.50 <br />$ 962.50 <br />$ 962.50 <br />100.00% <br />$ - <br />$ 46.13 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#12 Crushed Concrete Entrance <br />$ - <br />$ - <br />$ 3,935.75 <br />$ 3,935.75 <br />$ 3,935.75 <br />$ 3,935.75 <br />100.00% <br />$ - <br />$ 196.79 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#13 Apparatus Bay Muck Out <br />$ - <br />$ - <br />$ 2,103.84 <br />$ 2,103.84 <br />$ 2,103.84 <br />$ 2,103.84 <br />100.00% <br />$ - <br />$ 105.19 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#14 Soil Correction South Parking Lot <br />$ - <br />$ - <br />$ 61917.00 <br />$ 6,917.00 <br />$ 6,917.00 <br />$ 6,917.00 <br />100.00% <br />$ - <br />$ 345.65 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#15 Training Tower Manhole <br />$ - <br />$ - <br />$ 3,878.25 <br />$ 3,678.25 <br />$ 3,678.25 <br />$ 3,878.25 <br />100.009 <br />$ - <br />$ 193.91 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO Aggregate at Concrete <br />$ - <br />$ - <br />$ 2,455.20 <br />$ 2,455.20 <br />$ 2,455.20 <br />$ 2,455.20 <br />100.00% <br />$ - <br />$ 122.76 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO Escalation <br />$ - <br />$ - <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />100.00% <br />$ - <br />$ 150.00 <br />Page 10 / 11 <br />