Laserfiche WebLink
m TarERoiv NumberStatic 05 <br />Terra 0 k River on #3 <br />City f E, k <br />MI CONSTRUCTION Cit of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 23 <br />Contractor's signed certification is attached. APPLICATION DATE: 12/31/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 12/31/22 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Klein Electric <br />16-1600 <br />26A <br />DIV26 Fire Alarm/Twenty4Seven <br />$ 7,044.00 <br />$ - <br />$ - <br />$ 7,044.00 <br />$ 7,044.00 <br />$ 7,044.00 <br />100.00% <br />$ - <br />$ 352.20 <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Fire Alarm Rough -In Material <br />$ 226.00 <br />$ - <br />$ - <br />$ 226.00 <br />$ 226.00 <br />$ 226.00 <br />100.00% <br />$ - <br />$ 11.40 <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Fire Alarm Rough -In Labor <br />$ 1,082.00 <br />$ - <br />$ - <br />$ 1,082.00 <br />$ 1,082.00 <br />$ 1,082.00 <br />100.00% <br />$ - <br />$ 54.10 <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Security Rough -In Material <br />$ 592.00 <br />$ - <br />$ - <br />$ 592.00 <br />$ 592.00 <br />$ 592.00 <br />100.00% <br />$ - <br />$ 29.60 <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Security Rough -In Labor <br />$ 2,765.00 <br />$ - <br />$ - <br />$ 2,765.00 <br />$ 2,765.00 <br />$ 2,765.00 <br />100.00% <br />$ - <br />$ 136.25 <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Site Future Cameras Material <br />$ 4,147.00 <br />$ - <br />$ - <br />$ 4,147.00 <br />$ 4,147.00 <br />$ 4,147.00 <br />100.00% <br />$ - <br />$ 207.35 <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Site Future Cameras Labor <br />$ 1,856.00 <br />$ - <br />$ - <br />$ 1,856.00 <br />$ 1,856.00 <br />$ 1,856.00 <br />100.00% <br />$ - <br />$ 92.60 <br />Klein Electric <br />16-1600 <br />26A <br />CO#1 PR#6 Generator and Transformer <br />$ - <br />$ - <br />$ (19,350.00) <br />$ (19,350.00) <br />$ (19,350.00) <br />$ (19,350.00) <br />100.00% <br />$ - <br />$ (967.50) <br />Klein Electric <br />16-1600 <br />26A <br />CO#2 PR#2 Overhead Doors & Circuiting <br />$ - <br />$ - <br />$ 1,068.00 <br />$ 1,068.00 <br />$ 1,068.00 <br />$ 1,068.00 <br />100.00% <br />$ - <br />$ 53.40 <br />Klein Electric <br />16-1600 <br />26A <br />CO#3 PR#3R <br />$ - <br />$ - <br />$ (443.00) <br />$ (443.00) <br />$ (443.00) <br />$ (443.00) <br />100.00% <br />$ - <br />$ (22.15) <br />Klein Electric <br />16-1600 <br />26A <br />CO#4 ASI#1/RFI#19 <br />$ - <br />$ - <br />$ (2,625.00) <br />$ (2,625.00) <br />$ (2,625.00) <br />$ (2,625.00) <br />100.00% <br />$ - <br />$ (131.25) <br />Klein Electric <br />16-1600 <br />26A <br />CO#5 PR#10R <br />$ - <br />$ - <br />$ 1,875.00 <br />$ 1,875.00 <br />$ 1,875.00 <br />$ 1,875.00 <br />100.00% <br />$ - <br />$ 93.75 <br />Klein Electric <br />16-1600 <br />26A <br />CO#6 PR#9R Elecrical Revisions <br />$ - <br />$ - <br />$ 2,370.00 <br />$ 2,370.00 <br />$ 2,370.00 <br />$ 2,370.00 <br />100.00% <br />$ - <br />$ 116.50 <br />Klein Electric <br />16-1600 <br />26A <br />CO#7 ASI#4R Tower Lights <br />$ - <br />$ - <br />$ 8,136.00 <br />$ 8,136.00 <br />$ 8,136.00 <br />$ 8,136.00 <br />100.00% <br />$ - <br />$ 406.60 <br />Klein Electric <br />16-1600 <br />26A <br />CO#B PR#17 SCBA Compressor <br />$ - <br />$ - <br />$ 1,354.00 <br />$ 1,354.00 <br />$ 1,354.00 <br />$ 1,354.00 <br />100.00% <br />$ - <br />$ 67.70 <br />Klein Electric <br />16-1600 <br />26A <br />CO#9 RFI#117 <br />$ - <br />$ - <br />$ 963.00 <br />$ 963.00 <br />$ 963.00 <br />$ 963.00 <br />100.00% <br />$ - <br />$ 49.15 <br />Klein Electric <br />16-1600 <br />26A <br />CO#10 RFI#116 Automatic Push Pad <br />$ - <br />$ - <br />$ 437.00 <br />$ 437.00 <br />$ 437.00 <br />$ 437.00 <br />100.00% <br />$ - <br />$ 21.65 <br />Klein Electric <br />16-1600 <br />26A <br />CO#11 RFI#156 <br />$ - <br />$ - <br />$ 696.00 <br />$ 696.00 <br />$ 696.00 <br />$ 696.00 <br />100.00% <br />$ - <br />$ 34.90 <br />Klein Electric <br />16-1600 <br />26A <br />CO#12 ASI#11 Wellness Room Light Fixture <br />$ - <br />$ - <br />$ 1,319.00 <br />$ 1,319.00 <br />$ 1,319.00 <br />$ 1,319.00 <br />100.00% <br />$ - <br />$ 65.95 <br />Klein Electric <br />16-1600 <br />26A <br />CO#13 RFI#160 <br />$ - <br />$ <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />100.00% <br />$ - <br />$ 175.00 <br />Klein Electric <br />16-1600 <br />26A <br />CO#14 RFI#21 Added Circuits & Unit Heaters <br />$ - <br />$ - <br />$ 1,120.00 <br />$ 1,120.00 <br />$ 1,120.00 <br />$ 1,120.00 <br />100.00% <br />$ - <br />$ 56.00 <br />Klein Electric <br />16-1600 <br />26A <br />CO#15 G9 Light Fixture <br />$ - <br />$ - <br />$ 395.00 <br />$ 395.00 <br />$ 395.00 <br />$ 395.00 <br />100.00% <br />$ - <br />$ 19.75 <br />Klein Electric <br />16-1600 <br />26A <br />CO#16 Omitting Tech Conduit Runs From App Bay <br />$ - <br />$ - <br />$ (1,439.00) <br />$ (1,439.00) <br />$ (1,439.00) <br />$ (1,439.00) <br />100.00% <br />$ - <br />$ (71.95) <br />Klein Electric <br />16-1600 <br />26A <br />CO#17 Training Tower G1 Light Fixtures <br />$ - <br />$ - <br />$ 1,427.00 <br />$ 1,427.00 <br />$ 1,427.00 <br />$ 1,427.00 <br />100.00% <br />$ - <br />$ 71.35 <br />Klein Electric <br />16-1600 <br />26A <br />CO#16 App Bay Sectional Door Control Station <br />$ - <br />$ - <br />$ 2,790.00 <br />$ 2,790.00 <br />$ 2,790.00 <br />$ 2,790.00 <br />100.00% <br />$ - <br />$ 139.50 <br />Klein Electric <br />16-1600 <br />26A <br />CO#19 Thomsen Poured Concrete in Trash Enclosure <br />$ - <br />$ - <br />$ (850.00) <br />$ (850.00) <br />$ (850.00) <br />$ (850.00) <br />100.00% <br />$ - <br />$ (42.50) <br />Klein Electric <br />16-1600 <br />26A <br />CO GFCI Receptacles Laundry <br />$ - <br />$ - <br />$ 1,503.00 <br />$ 1,503.00 <br />$ 1,503.00 <br />$ 1,503.00 <br />100.00% <br />$ - <br />$ 75.15 <br />Klein Electric <br />16-1600 <br />26A <br />CO IP Dialer <br />$ - <br />$ - <br />$ 576.00 <br />$ 576.00 <br />$ 576.00 <br />$ 576.00 <br />100.00% <br />$ - <br />$ 26.90 <br />Klein Electric <br />16-1600 <br />26A <br />CO Training Tower Lighting PR#27 <br />$ - <br />$ 3,663.00 <br />$ 3,663.00 <br />$ 3,663.00 <br />$ 3,663.00 <br />100.00% <br />$ - <br />$ 163.15 <br />Klein Electric <br />16-1600 <br />26A <br />Raise Exterior Sign <br />$ - <br />$ - <br />$ 445.00 <br />$ 445.00 <br />$ 445.00 <br />$ 445.00 <br />100.00% <br />$ - <br />$ 22.25 <br />Klein Electric <br />16-1600 <br />26A <br />CO Lights at Pergola Credit <br />$ - <br />$ - <br />$ (402.00) <br />$ (402.00) <br />$ (402.00) <br />$ (402.00) <br />100.00% <br />$ - <br />$ (20.10) <br />Klein Electric <br />16-1600 <br />26A <br />Decon Epoxy Flooring <br />$ - <br />$ - <br />$ 201.00 <br />$ 201.00 <br />$ 201.00 <br />$ 201.00 <br />100.00% <br />$ - <br />$ 10.05 <br />Twenty4Seven <br />16-1600 <br />Horn Strobe Relocate and Replace <br />$ - <br />$ - <br />$ 509.25 <br />$ 509.25 <br />$ 509.25 <br />$ 509.25 <br />100.00% <br />$ - <br />$ 25.46 <br />Dryden Excavating <br />31-1000 <br />31A <br />Mobilization, Bond, SWPP Permit <br />$ 7,000.00 <br />$ - <br />$ - <br />$ 7,000.00 <br />$ 7,000.00 <br />$ 7,000.00 <br />100.00% <br />$ - <br />$ 350.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Bituminous Saw -Cutting Labor <br />$ 2,105.00 <br />$ - <br />$ - <br />$ 2,105.00 <br />$ 2,105.00 <br />$ 2,105.00 <br />100.00% <br />$ - <br />$ 105.25 <br />Dryden Excavating <br />31-1000 <br />31A <br />Bituminous Removal Labor <br />$ 3,640.00 <br />$ - <br />$ - <br />$ 3,640.00 <br />$ 3,640.00 <br />$ 3,640.00 <br />100.00% <br />$ - <br />$ 162.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Concrete Saw -Cutting Labor <br />$ 160.00 <br />$ - <br />$ - <br />$ 160.00 <br />$ 160.00 <br />$ 160.00 <br />100.00% <br />$ - <br />$ 8.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Concrete Removal Labor <br />$ 3,236.00 <br />$ - <br />$ - <br />$ 3,236.00 <br />$ 3,236.00 <br />$ 3,236.00 <br />100.00% <br />$ - <br />$ 161.60 <br />Dryden Excavating <br />31-1000 <br />31A <br />Tree Protection Labor <br />$ 75.00 <br />$ - <br />$ - <br />$ 75.00 <br />$ 75.00 <br />$ 75.00 <br />100.00% <br />$ - <br />$ 3.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Clearing & Grubbing Labor <br />$ 2,100.00 <br />$ - <br />$ - <br />$ 2,100.00 <br />$ 2,100.00 <br />$ 2,100.00 <br />100.00% <br />$ - <br />$ 105.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Topsoil Stripping & Emb. Labor <br />$ 1,386.00 <br />$ - <br />$ - <br />$ 1,386.00 <br />$ 1,386.00 <br />$ 1,386.00 <br />100.00% <br />$ - <br />$ 69.30 <br />Dryden Excavating <br />31-1000 <br />31A <br />Export Excess Topsoil Labor <br />$ 14,055.00 <br />$ - <br />$ - <br />$ 14,055.00 <br />$ 14,055.00 <br />$ 14,055.00 <br />100.00% <br />$ - <br />$ 702.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Site Grading Labor <br />$ 56,076.01 <br />$ - <br />$ - <br />$ 56,076.01 <br />$ 56,076.01 <br />$ 56,076.01 <br />100.00% <br />$ - <br />$ 2,803.80 <br />Dryden Excavating <br />31-1000 <br />31A <br />Site Grading Material <br />$ 14,040.00 <br />$ - <br />$ - <br />$ 14,040.00 <br />$ 14,040.00 <br />$ 14,040.00 <br />100.00% <br />$ - <br />$ 702.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Exc. & Backfill Foundations <br />$ 25,378.00 <br />$ <br />$ - <br />$ 25,378.00 <br />$ 25,378.00 <br />$ 25,378.00 <br />100.00% <br />$ - <br />$ 1,268.90 <br />Dryden Excavating <br />31-1000 <br />31A <br />Building Sand Cushion Labor <br />$ 3,298.00 <br />$ - <br />$ - <br />$ 3,298.00 <br />$ 3,298.00 <br />$ 3,298.00 <br />100.00% <br />$ - <br />$ 164.90 <br />Page 9 / 11 <br />