Laserfiche WebLink
Opinion of Probable Cost $ 15,335,000 $ 13,143,000 Total Project Cost$ 2,555,800 $ 2,190,560 Indirect Costs (20%)$ 12,779,000 $ 10,952,800 Construction Total$ 1,161,730 <br /> $ 995,710 $ 11,617,300 $ 9,957,100 Total-Construction Sub$ 6,000 $ 6,000 Connecting to Existing System$ 6,557,000 $ 4,096,400 Pressurized Forcemain <br /> and Testing$ 25,000 $ 80,000 Air Release Manholes$ 2,840,000 $ 2,865,000 Lift Stations$ 674,000 $ 1,611,000 Trunk Gravity Sewer and Manholes$ 1,010,200 <br /> $ 865,800 Mobilization/Demobilization$ 505,100 $ 432,900 Bonds, Insurance, and General ConditionsNorthwest AreasNortheast AreasImprovement Section 5.1 and Appendix <br /> B of report Sewer Service– <br />