Laserfiche WebLink
Northwest Area Sewer Service treatment plantNew receiving structure needed at the wastewater •wastewater treatment plant with dual forcemainRegional lift station to pump directly to <br /> the •Minimum of three lift stations needed•Extend trunk sewer ranging from 10 to 12 inches•Southeast corner can flow to existing system•Windsor lift station can serve western areas•Figure <br /> A21Sections 4.6 and 4.7 of report <br />