Northwest Area Water Service 1.0 MG water tower needed within 5 year timeframe•Treatment likely needed at both wells•timeframeMinimum 850 gpm well needed in 5 to 10 year •Minimum 850 <br /> gpm well needed immediately•Two booster stations needed immediately •inch trunk watermains-Extend 12 and 16•Area needs separate pressure zones•Figure A10Sections 3.6 and 3.7 of report <br /> <br />