Laserfiche WebLink
Northeast Area Water Service 1.0 MG water tower needed in 10 to 15 year timeframe•Treatment may be needed at new well•Minimum 850 gpm well needed in 5 to 10 year timeframe•inch trunk <br /> watermain with looping-Extend 12•Area can be annexed to the system’s high pressure zone•Figure A9Sections 3.4 and 3.5 of report <br />