My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 12-05-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
12-05-2022
>
4.3 SR 12-05-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2022 10:35:37 AM
Creation date
12/2/2022 9:57:51 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29245+6 <br />6-) Additional Conditi <br />(01) Future Phase - This Agreement authorizes development <br />of and construction only on Lot 1, Block i, of the <br />Subdivision. Development of or construction on Outlot A <br />shall not be allowed until Outlot A is replatted and <br />Developer or its successor in interest has entered into a <br />Developer's Agreement providing for development of <br />Outlot A. Final approval of the replat of Outlot A will be <br />subject to such conditions as shall be imposed by the City <br />Council at the time of final plat approval. <br />(02) Development Plan - A development plan shall be <br />submitted by Developer and approved by staff prior to <br />commencement of construction within the Subdivision. The <br />development plan will identify the general grading, <br />storm/sedimentation ponding needs, finished floor <br />elevations of buildings, and other such items as staff <br />shall direct. Approval of the development plan may be <br />contingent upon soil borings verifying elevations for <br />proposed building pads_ <br />(03) Additional R Qulato A r 1 - All additional <br />regulatory approvals required for construction of the <br />Improvements or development of the Subdivision shall be <br />obtained before commencement of construction on the <br />Improvements. <br />(04) Street Lights - Developer shall install a street <br />light at the southwest corner of 193rd Avenue and the <br />easterly entrance drive, as directed by the Elk River <br />Public Utilities- <br />(05) Easements needed to accomplish storm drainage outside <br />of the boundaries of the Subdivision must be provided by <br />Developer prior to commencement of construction on the <br />Subdivision. Developer shall also provide a drainage and <br />utility easement along the southeast property line <br />protecting the ridge and existing trees. This easement <br />shall be a minimum of 30 feet in width and follow the <br />southeast property line. The terms of this easement shall <br />be reviewed and approved by the City. If this easement is <br />vacated in connection with the development of Outlot A, the <br />City shall waive the application fee for vacation of the <br />easement. <br />(06) The final plat shall dedicate a 50 foot drainage and <br />utility easement through the Subdivision for the extension <br />of trunk sanitary sewer and water main. This easement <br />shall be located as directed by the City engineer. <br />Developer shall also provide a temporary easement as <br />required by the City engineer for construction of trunk <br />sanitary sewer and water facilities. <br />3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.