My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 SR 10-17-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-17-2022
>
4.4 SR 10-17-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 8:12:52 AM
Creation date
10/13/2022 2:51:46 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPINION ON PROBABLE COST <br />MORTON AVENUE DRAINAGE IMPROVEMENTS - OPTION 2 <br />CITY OF ELK RIVER, MN <br />OPTION 2 -ASSESSABLE: DOUBLE CATCH BASINS & SURGE POND <br />Al MOBILIZATION <br />A2 TRAFFIC CONTROL <br />A3 REMOVE CURB AND GUTTER <br />A4 REMOVE BITUMINOUS PAVEMENT <br />AS REMOVE CONCRETE PAVEMENT <br />A6 BITUMINOUS STREET PATCH <br />A7 6" CONCRETE DRIVEWAY PAVEMENT <br />A8 CONCRETE CURB AND GUTTER <br />A9 CONNECT TO EXISTING STORM SEWER <br />A10 12" RC PIPE SEWER <br />All STORM SEWER STRUCTURE <br />Al2 CASTING ASSEMBLY <br />A13 TURF RESTORATION <br />1 <br />1 <br />40 <br />20 <br />10 <br />20 <br />10 <br />40 <br />2 <br />10 <br />8 <br />2 <br />0.1 <br />BO LTC] N <br />& M ENK <br />Real People. Real Solutions. <br />Date:10/06/2022 <br />LUMP SUM <br />$1,000.00 <br />$1,000.00 <br />LUMP SUM <br />$1,000.00 <br />$1,000.00 <br />LIN FT <br />$8.00 <br />$320.00 <br />SQYD <br />$5.00 <br />$100.00 <br />SQYD <br />$12.00 <br />$120.00 <br />SQYD <br />$50.00 <br />$1,000.00 <br />SQYD <br />$12.00 <br />$120.00 <br />LIN FT <br />$20.00 <br />$800.00 <br />EACH <br />$1,000.00 <br />$2,000.00 <br />LIN FT <br />$50.00 <br />$500.00 <br />LIN FT <br />$500.00 <br />$4,000.00 <br />EACH <br />$700.00 <br />$1,400.00 <br />ACRE <br />$15,000.00 <br />$1,500.00 <br />SUBTOTOAL CONSTRUCTION COST: <br />$13,900.00 <br />10% CONTINGENCY: 51.400.00 <br />ENGINEERING & ADMINISTRATION: $2,800.00 <br />SUBCATCHMENT TO LOW AREA ASSESSABLE PROJECT COST: $18,100.00 <br />A14 BAILEY POINT SURGE POND & PIPE BYPASS <br />1 LUMP SUM $30,000.00 $30,000.00 <br />10% CONTINGENCY: $3,000.00 <br />ENGINEERING & ADMINISTRATION: 56,000.00 <br />BAILY SURGE POND & PIPE BYPASS ASSESSABLE PROJECT COST: $39,000.00 <br />TOTAL CONSTRUCTION COST: $188,600.00 <br />10% CONTINGENCY: $18,900.00 <br />ENGINEERING & ADMINISTRATION : 537,500.00 <br />OPTION 2 ESTIMATED TOTAL PROJECT COST: $245,000.00 <br />MORTON AVE DRAINAGE <br />10/7/2022, 10:48 AM Bolton & Menk, Inc. Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.