Laserfiche WebLink
OPINION ON PROBABLE COST <br />MORTON AVENUE DRAINAGE IMPROVEMENTS - OPTION 2 <br />CITY OF ELK RIVER, MN <br />(BOLTON <br />D&MENK <br />Real People. Real Solutions. <br />Date:10/06/2022 <br />OPTION 2 - NON -ASSESSABLE: STORM SEWER IMPROVEMENTS (MORTON AVE AND MAIN ST SYSTEM REPLACEMENTS) <br />1 <br />MOBILIZATION <br />1 <br />LUMP SUM <br />$11,500.00 <br />$11,500.00 <br />2 <br />TRAFFIC CONTROL <br />1 <br />LUMP SUM <br />$8,000.00 <br />$8,000.00 <br />3 <br />TREE CLEARING AND GRUBBING <br />4 <br />EACH <br />$1,000.00 <br />$4,000.00 <br />4 <br />REMOVE PIPE SEWER <br />415 <br />LIN FT <br />$8.00 <br />$3,320.00 <br />5 <br />REMOVE DRAINAGE STRUCTURE & CASTING <br />3 <br />EACH <br />$500.00 <br />$1,500.00 <br />6 <br />REMOVE CURB AND GUTTER <br />385 <br />LIN FT <br />$8.00 <br />$3,080.00 <br />7 <br />REMOVE BITUMINOUS PAVEMENT <br />770 <br />SQYD <br />$5.00 <br />$3,850.00 <br />8 <br />REMOVE CONCRETE PAVEMENT <br />105 <br />SQYD <br />$8.00 <br />$840.00 <br />9 <br />BITUMINOUS STREET PATCH <br />770 <br />SQYD <br />$50.00 <br />$38,500.00 <br />10 <br />6" CONCRETE WALK <br />65 <br />SQ FT <br />$12.00 <br />$780.00 <br />11 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />40 <br />SQYD <br />$12.00 <br />$480.00 <br />12 <br />CONCRETE CURB AND GUTTER <br />385 <br />LIN FT <br />$20.00 <br />$7,700.00 <br />13 <br />TRUNCATED DOMES <br />24 <br />SQ FT <br />$60.00 <br />$1,440.00 <br />14 <br />CONNECT TO EXISTING STORM SEWER <br />4 <br />EACH <br />$1,000.00 <br />$4,000.00 <br />15 <br />12" RC PIPE SEWER <br />15 <br />LIN FT <br />$45.00 <br />$675.00 <br />16 <br />21" RC PIPE SEWER <br />395 <br />LIN FT <br />$68.00 <br />$26,860.00 <br />17 <br />MANHOLE <br />16 <br />LIN FT <br />$550.00 <br />$8,800.00 <br />18 <br />2'X3' CATCH BASIN <br />4 <br />LIN FT <br />$500.00 <br />$2,000.00 <br />19 <br />48" CATCH BASIN <br />12 <br />LIN FT <br />$600.00 <br />$7,200.00 <br />20 <br />SAFL BAFFLE <br />1 <br />EACH <br />$5,000.00 <br />$5,000.00 <br />21 <br />CASTING ASSEMBLY <br />6 <br />EACH <br />$700.00 <br />$4,200.00 <br />22 <br />TURF RESTORATION <br />0.1 <br />ACRE <br />$10,000.00 <br />$1,000.00 <br />CONSTRUCTION COST: <br />$144,700.00 <br />10% CONTINGENCY: <br />$14,500.00 <br />ENGINEERING & ADMINISTRATION: <br />$28,700.00 <br />OPTION 2 NON -ASSESSABLE PROJECT COST: <br />$187,900.00 <br />MORTON AVE DRAINAGE <br />10/7/2022, 10:48 AM Bolton & Menk, Inc. Page 1 of 2 <br />