My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 10-17-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-17-2022
>
4.3 SR 10-17-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 8:12:24 AM
Creation date
10/13/2022 2:49:25 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
„"",A1A Document G701- - 2017 <br />Change Order <br />PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: <br />20-700 Elk River Public Safety Building Contract For: General Construction Change Order Number: 20-700-002 <br />Expansion <br />Date: October 19, 2020 Date: October 6, 2022 <br />OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) <br />City of Elk River BKV Group Terra General Contractors <br />13065 Orono Parkway NW 222 N 2nd St, 9101 21025 Commerce Blvd Ste 1000 <br />Elk River, MN 55330 MInneapolis, MN 55401 Rogers MN 55374 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change anc� if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives) <br />Final change order to reconcile the changes to the project per the attached change log dated 10/6/2022. <br />Credit the balance of the remaining contingency $30,012.80, to be transferred to ERFS #3. <br />The original Guaranteed Maximum Price was $ 6,290,219.00 <br />The net change by previously authorized Change Orders $ 78,765.42 <br />The Guaranteed Maximum Price prior to this Change Order was $ 6,368,984.42 <br />The Guaranteed Maximum Price will be decreased by this Change Order in the amount of $ 30,012.80 <br />The new Guaranteed Maximum Price including this Change Order will be $ 6,338,971.62 <br />The Contract Time will be increased by Zero (0) days. <br />The new date of Substantial Completion will be <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />BKV Group <br />ARCHITECT (Fi inname) <br />l� <br />SIGNATURE <br />Michael Healy, Architect <br />PRINTED NAME AND TITLE <br />10/07/2022 <br />DATE <br />Terra General Contractors <br />CONTRACT (irm a <br />SIGN RE <br />Jason Whiting, VP <br />PRINTED NAME AND TITLE <br />10/6/2022 <br />DATE <br />City of Elk River <br />OWNER (Firm n�nae) <br />SIGNATURE <br />Brandon Wisner, Engineering Project Manager <br />PRINTED NAME AND TITLE <br />10/12/2022 <br />DATE <br />AIA Document G701- - 2017 Copyright© 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "American <br />Institute of Architects,” "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document <br />was produced by AIA software at 14:43:34 CT on 10/0612022 under Order No.2114310719 which expires on 0412412023, is not for resale, is licensed for one- <br />time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail <br />copyright@aia.org. <br />User Notes: (3139ADA3C) <br />
The URL can be used to link to this page
Your browser does not support the video tag.