Laserfiche WebLink
PR <br />PR NO. <br />N/A <br />RFI <br />RFI NO. <br />N/A <br />COR <br />DATE <br />9/28/2022 <br />CDR NO. <br />117 <br />DESCRIPTION OF CHANGE <br />Transfer ERPS Contingency Balance to ERFS#3 <br />CDR STATUS <br />Contingency <br />CHANGELOG <br />CCHARGE TO <br />($30,012.80) <br />CHANGE STATUS SUB STATUS <br />OPEN CDR APPROVED <br />AMOUNT <br />$30,012.80 N/A Transfer Cont. balance from ERPS <br />N/A <br />N/A <br />9/28/2022 <br />118 <br />Exterior C-Top <br />Contingency <br />$2,858.69 <br />N/A <br />N/A <br />N/A <br />9/28/2022 <br />119 <br />Exterior G-Grill <br />Contingency <br />$2,100.00 <br />N/A <br />N/A <br />N/A <br />9/28/2022 <br />120 <br />Additional Costs for Exterior Pressure Washing/Cleanup <br />Contingency <br />$3,924.98 <br />N/A <br />N/A <br />N/A <br />9/28/2022 <br />121 <br />Paint Interior Trench Drain Grates <br />Contingency <br />$2,722.16 <br />N/A <br />N/A <br />N/A <br />9/28/2022 <br />122 <br />Asphalt patch at trail <br />Contingency <br />$5,000.00 <br />N/A <br />N/A <br />N/A <br />9/28/2022 <br />123 <br />New Horn Strobe - relocate away from steam room <br />Contingency <br />$509.25 <br />N/A <br />N/A <br />N/A <br />10/6/2022 <br />124 <br />Patch Stone Veneer to match <br />Contingency <br />$1,968.00 <br />N/A <br />SUBTOTAL: <br />$144,519.37 <br />$0.00 <br />$36,266.70 <br />GUARANTEED MAXIMUM PRICE (GMP) <br />CONTRACT: <br />CURRENT CONTRACT VALUE: <br />(Original Contract + Change Orders) <br />PROJECTED CONTRACT VALUE: (Current <br />Contract + Pending COR's) <br />CONTINGENCY REMAINING: ($145,803.75 - <br />Pending COR's) <br />,284.38 <br />Construction Change Order Log 10232018 Page 4 of 4 <br />