Laserfiche WebLink
CHANGELOG <br />PR <br />PR NO. <br />N/A <br />RFI <br />RFI NO. <br />140/2 <br />CDR <br />DATE CDR NO. <br />2/7/2022 74 <br />DESCRIPTION OF CHANGE <br />Weldable Raqppelling Anchors <br />CHANGE STATUS <br />CDR STATUS CCHARGE TO OPEN CDR APPROVED <br />AMOUNT <br />Contingency $2,355.82 N/A <br />SUB STATUS <br />yes <br />21 <br />171 <br />2/7/2022 <br />75 <br />PR#21- RFI#171 <br />Contingency <br />$1,120.00 <br />N/A <br />yes <br />N/A <br />163 <br />2/9/2022 <br />76R <br />RFI#163- Stair Tower 4th Floor Roofing Membrane <br />Contingency <br />$4,578.00 <br />N/A <br />yes <br />N/A <br />173 <br />2/9/2022 <br />77 <br />Chain Mounting Light Fixtures In Physical Training Room and Mech <br />Contingency <br />$395.00 <br />N/A <br />yes <br />20 <br />N/A <br />2/10/2022 <br />78 <br />Architectual, Interior, and Technology Revisions per PR#20 <br />Contingency <br />($1,679.00) <br />N/A <br />yes <br />22 <br />N/A <br />2/11/2022 <br />79 <br />PR#22- Added 3 way control valve for In -floor heat <br />Contingency <br />$709.00 <br />N/A <br />yes <br />N/A <br />183 <br />2/22/2022 <br />80 <br />Revised Surface Mounted Exhaust Air Registers <br />Contingency <br />$2,503.00 <br />N/A <br />yes <br />N/A <br />N/A <br />2/25/2022 <br />81 <br />Revised Interior Signage List <br />Contingency <br />($572.82) <br />N/A <br />yes <br />N/A <br />181 <br />2/28/2022 <br />82 <br />RFI#181- SF 140X Head Detail <br />Contingency <br />$312.00 <br />N/A <br />yes <br />N/A <br />139 <br />2/28/2022 <br />83 <br />Duct Protection Cages <br />Contingency <br />($470.00) <br />N/A <br />yes <br />N/A <br />187 <br />3/1/2022 <br />84 <br />Added GFCI recptacles within Laundry Areas <br />Contingency <br />$1,503.00 <br />N/A <br />yes <br />N/A <br />N/A <br />3/4/2022 <br />85 <br />Apparatus Bay Moisture Mitigation <br />Contingency <br />$6,565.00 <br />N/A <br />yes <br />N/A <br />N/A <br />3/11/2022 <br />86 <br />Wellness Room 135Bench <br />N/A <br />N/A <br />Email sent to Century on3122 <br />N/A <br />N/A <br />203 <br />4/6/2022 <br />87 <br />RFI#203 G1 Training Tower Light Fixture <br />Contingency <br />$1,427.00 <br />N/A <br />yes <br />N/A <br />N/A <br />4/8/2022 <br />88 <br />Irrigation Controller <br />Contingency <br />$1,132.00 <br />N/A <br />yes <br />N/A <br />194 <br />4/12/2022 <br />89 <br />2/1 Granular Fill at App Bay Aprons <br />N/A <br />N/A <br />N/A <br />N/A <br />210 <br />4/12/2022 <br />90 <br />App Bat Sectional Door Control Station <br />Contingency <br />$2,790.00 <br />N/A <br />yes <br />N/A <br />N/A <br />5/6/2022 <br />91 R <br />Flammable Wsate Vent Piping Relocation <br />Contingency <br />$3,169.00 <br />N/A <br />yes <br />23 <br />N/A <br />4/25/2022 <br />92R <br />Trash Enclosure Gate <br />Contingency <br />$3,754.55 <br />N/A <br />yes <br />N/A <br />212 <br />4/25/2022 <br />93 <br />Electronically Operated Valve for Natural Gas Piping <br />N/A <br />N/A <br />yes <br />25 <br />N/A <br />4/26/2022 <br />94 <br />Decontamination Vestibule Flooring <br />Contingency <br />$2,851.00 <br />N/A <br />Epoxy <br />yes <br />24 <br />N/A <br />4/26/2022 <br />95 <br />Training Tower Lintel <br />Contingency <br />$833.64 <br />N/A <br />yes <br />N/A <br />N/A <br />4/28/2022 <br />96 <br />Aggregate Base for Concrete Along North App Bay <br />Contingency <br />$2,455.20 <br />N/A <br />yes <br />N/A <br />N/A <br />5/4/2022 <br />97 <br />Dryden Excavating Escalation <br />Contingency <br />$3,000.00 <br />N/A <br />yes <br />N/A <br />N/A <br />5/4/2022 <br />98 <br />Asphalt Paving Escalation <br />Contingency <br />$3,588.30 <br />N/A <br />yes <br />N/A <br />218 <br />5/11/2022 <br />99 <br />Cleveland Ave Existing CB Grate <br />$814.69 <br />N/A <br />yes <br />N/A <br />N/A <br />5/12/2022 <br />100 <br />In -Wall Backing for range Hood Vent <br />Contingency <br />$1,066.25 <br />N/A <br />yes <br />N/A <br />199 <br />5/23/2022 <br />101 <br />Additional Wind Bracing at App Bay Joist <br />Contingency <br />$424.00 <br />N/A <br />Approved in OAC Meeting on 7127 <br />yes <br />N/A <br />N/A <br />5/27/2022 <br />102 <br />CMU for Grill Station <br />Contingency <br />$0.00 <br />N/A <br />yes <br />N/A <br />N/A <br />5/27/2022 <br />103 <br />Credit for Colored Concrete <br />Contingency <br />($541.20) <br />N/A <br />yes <br />N/A <br />221 <br />5/31/2022 <br />104 <br />Exterior Trench Drain Concrete Pour <br />$1,776.21 <br />N/A <br />yes <br />N/A <br />225 <br />6/1/2022 <br />105 <br />RPZ for Irrigation Feed <br />Contingency <br />$947.00 <br />N/A <br />Approved in OAC Meeting on 7127 <br />yes <br />N/A <br />N/A <br />6/2/2022 <br />106 <br />IP Dialer for FA Monitoring <br />Contingency <br />$578.00 <br />N/A <br />yes <br />N/A <br />224 <br />6/7/2022 <br />107 <br />Concrete Paving to Trench Drain Tie -In <br />Contingency <br />$1,779.23 <br />N/A <br />27 <br />226 <br />6/20/2022 <br />108 <br />PR#27- Training Tower Lighting <br />$3,663.00 <br />N/A <br />Approved in OAC meeting on 7113122 <br />yes <br />N/A <br />229 <br />6/23/2022 <br />109 <br />Swing Gate for Decorative Metal Fencing <br />Contingency <br />$1,113.00 <br />N/A <br />Approved in OAC Meeting on 7127 <br />yes <br />26 <br />N/A <br />9/21/2022 <br />11OR <br />PR#26- Exterior Signage Elevation <br />Contingency <br />$11,190.85 <br />N/A <br />Revised to include lift for mason <br />N/A <br />N/A <br />7/18/2022 <br />111 <br />Pergola Substituition <br />Contingency <br />($11,023.27) <br />N/A <br />Approved in OAC meeting on 7120122 <br />yes <br />N/A <br />N/A <br />8/3/2022 <br />112 <br />Alternative Operable Partition <br />Contingency <br />$9,544.91 <br />N/A <br />28 <br />N/A <br />8/3/2022 <br />113 <br />PR#28 Epoxy Guidelines <br />N/A <br />6330 <br />yes <br />N/A <br />233 <br />8/8/2022 <br />114 <br />Lights at Pergola <br />Contingency <br />($402.00) <br />N/A <br />Approved in OAC meeting on 8117122 <br />N/A <br />N/A <br />8/19/2022 <br />115 <br />Omitting WC-1 in Dayroom <br />Contingency <br />($1,475.00) <br />N/A <br />PTL-2 approved per email on 8125 <br />N/A <br />N/A <br />9/2/2022 <br />116 <br />Polished Concrete Covering/Protection <br />Contingency <br />$3,192.00 <br />N/A <br />Dollar amount indicates most expensive option <br />Construction Change Order Log 10232018 Page 3 of 4 <br />