My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 10-17-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-17-2022
>
4.3 SR 10-17-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 8:12:24 AM
Creation date
10/13/2022 2:49:25 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nTerra <br />UCTION <br />21025 Commerce Blvd, Suite 1000 <br />Rogers, MN 55374 <br />763.463.0220 <br />Date: 10/6/2022 <br />Project: Elk River Fire Station #3 <br />Change Order Log <br />PR RFI <br />FIR NO. RFI NO. <br />N/A 1 <br />CDR <br />DATE CDR NO. <br />TBD 1 <br />DESCRIPTION OF CHANGE <br />RFI#1 <br />CHANGE LOG �� <br />CHANGE STATUS <br />CDR STATUS CCHARGE TO OPEN CDR APPROVED <br />ONTINGENCY AMOUNT COR'S: CO AIA CO NO. BIC COMMENTS ON STATUS <br />AMOUNT <br />SUB STATUS <br />COSENTTOSUB <br />1 <br />N/A <br />4/6/2021 <br />2R <br />PR#01 Clerestory Head Detail <br />Contingency <br />$11,782.35 <br />N/A <br />COR#2 sent on 3125 for $12,412.00 <br />yes <br />4 <br />N/A <br />3/29/2021 <br />3 <br />PR#04 Stepped Footings <br />Contingency <br />$4,084.00 <br />N/A <br />yes <br />7 <br />N/A <br />4/5/2021 <br />4 <br />PR#07 Water service <br />Contingency <br />($3,362.12) <br />N/A <br />yes <br />6 <br />N/A <br />4/6/2021 <br />5 <br />PR#06 Generator and Transformer <br />Contingency <br />($19,350.00) <br />N/A <br />yes <br />5 <br />N/A <br />4/7/2021 <br />6 <br />PR#05 Salvaged Steel Bollards <br />Contingency <br />($1,232.00) <br />N/A <br />yes <br />N/A <br />N/A <br />4/8/2021 <br />7 <br />Additional Construction Entrances <br />N/A <br />N/A <br />2 <br />N/A <br />4/9/2021 <br />8 <br />PR#2 Overhead Doors and Circuiting <br />Contingency <br />($36,149.00) <br />N/A <br />yes <br />3R <br />N/A <br />4/23/2021 <br />9 <br />PR#03R Duct and Ceiling Revisions <br />Contingency <br />$3,862.00 <br />N/A <br />yes <br />N/A <br />N/A <br />4/28/2021 <br />10 <br />Increased joist loads for RTIJ <br />Contingency <br />$1,305.28 <br />N/A <br />yes <br />N/A <br />N/A <br />5/6/2021 <br />N/A <br />ERMIJ Permits <br />Contingency <br />$1,033.46 <br />N/A <br />N/A <br />N/A <br />N/A <br />5/10/2021 <br />11 <br />ASI-2 Civil Structure Elevation <br />Contingency <br />$6,096.75 <br />N/A <br />yes <br />10 <br />N/A <br />5/24/2021 <br />12 <br />PR#10- Condensate <br />N/A <br />N/A <br />Replaced by COR#21-PR10R <br />NO <br />N/A <br />19 <br />5/24/2021 <br />13 <br />ASI-1 and RFI-19 <br />Contingency <br />($2,625.00) <br />N/A <br />yes <br />N/A <br />N/A <br />5/24/2021 <br />14 <br />Door Hardware Revisions <br />Contingency <br />$2,152.97 <br />N/A <br />yes <br />9 <br />N/A <br />6/1/2021 <br />15 <br />PR#9 Owner Review Items <br />N/A <br />N/A <br />Replaced by COR#25-PR#9R <br />8 <br />N/A <br />6/2/2021 <br />16 <br />PR#8 Expansion Tank <br />Contingency <br />$2,504.00 <br />N/A <br />yes <br />N/A <br />21 <br />6/3/2021 <br />17 <br />RFI#21 Galvanized Angle at Brick Veneer <br />N/A <br />N/A <br />Revised in ASI-5, Replaced by COR#24 <br />N/A <br />33 <br />6/11/2021 <br />18 <br />RFI#33 Added Footings Steps for Storm Sewer Piping <br />Contingency <br />$600.00 <br />N/A <br />yes <br />N/A <br />37 <br />6/11/2021 <br />19 <br />RFI#37 Extended Foundation Wall at Masonry Pilasters <br />Contingency <br />$550.00 <br />N/A <br />yes <br />N/A <br />N/A <br />6/22/2021 <br />20 <br />Footing steps for domestic water and stoop along GL-8 <br />Contingency <br />$2,480.00 <br />N/A <br />yes <br />10R <br />N/A <br />6/25/2021 <br />21 <br />PR#1OR-Storm Shelter Door Hardware <br />Contingency <br />$1,875.00 <br />N/A <br />yes <br />N/A <br />N/A <br />6/28/2021 <br />22R <br />ASI-4R Training Tower Lighting Controls <br />Contingency <br />$8,136.00 <br />N/A <br />Replaced ASI-4 <br />yes <br />12 <br />N/A <br />6/30/2021 <br />23 <br />PR#12- Overhead Sectional Dors <br />Contingency <br />($36,410.00) <br />N/A <br />yes <br />N/A <br />21 <br />8/5/2021 <br />24R <br />ASI-5 <br />Contingency <br />$13,411.00 <br />N/A <br />Replaces COR#17-RFI#21 <br />yes <br />9R <br />N/A <br />7/15/2021 <br />25 <br />PR#9R- Overhead Truck Fill <br />Contingency <br />$32,991.00 <br />N/A <br />yes <br />N/A <br />54 <br />7/27/2021 <br />26 <br />RFI#54- Head Detail at 202CX and 302CX <br />Contingency <br />$1,406.22 <br />N/A <br />yes <br />N/A <br />46 <br />7/27/2021 <br />27 <br />RFI#46- Training Tower Trench Drain Architectual Detail <br />Contingency <br />$415.34 <br />N/A <br />yes <br />N/A <br />N/A <br />7/30/2021 <br />28R <br />C-900 Municipal Water Piping <br />Contingency <br />$278.65 <br />N/A <br />yes <br />N/A <br />N/A <br />8/3/2021 <br />29 <br />Eye Wash Station <br />Contingency <br />($949.00) <br />N/A <br />yes <br />N/A <br />69 <br />8/27/2021 <br />30 <br />1 RFI#69 Apparatus Bay OH Door Jamb Angle <br />Contingency <br />1 ($3,098.93) <br />N/A <br />yes <br />Construction Change Order Log 10232018 Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.