„"",A1A Document G701- - 2017 <br />Change Order <br />PROJECT: (Name and address) <br />20-705 Elk River Fire Station #3 <br />OWNER: (Name and address) <br />City of Elk River <br />13065 Orono Parkway NW <br />Elk River, MN 55330 <br />CONTRACT INFORMATION: <br />Contract For: General Construction <br />Date: October 19, 2020 <br />ARCHITECT: (Name and address) <br />BKV Group <br />222 N 2nd St, #101 <br />MInneapolis, MN 55401 <br />CHANGE ORDER INFORMATION: <br />Change Order Number: 20-705-001 <br />Date: October 6, 2022 <br />CONTRACTOR: (Name and address) <br />Terra General Contractors <br />21025 Commerce Blvd Ste 1000 <br />Rogers MN 55374 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change anal if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives) <br />Change Order to reconcile the changes to the project per the attached change log dated 10/6/2022. Includes adding the balance <br />of the ERPS contingency to this project. Includes the following COR's to be added to the GMP: <br />COR #99 $814.68 <br />COR#104 $1,776.21 <br />COR #108 $3,663.00 <br />COR #117 $30,012.80 <br />Contingency revision balance = $1,284.38 remaining <br />The original Guaranteed Maximum Price was $ 6,898,246.00 <br />The net change by previously authorized Change Orders $ 0.00 <br />The Guaranteed Maximum Price prior to this Change Order was $ 6,898,246.00 <br />The Guaranteed Maximum Price will be increased by this Change Order in the amount of $ 36,266.70 <br />The new Guaranteed Maximum Price including this Change Order will be $ 6,934,512.70 <br />The Contract Time will be increased by Zero (0) days. <br />The new date of Substantial Completion will be <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />BKV Group <br />ARCHITECT (Firm name) <br />SIGNATURE <br />Michael Healy, Architect <br />PRINTED NAME AND TITLE <br />10/07/2022 <br />DATE <br />Terra General Contractors <br />C07Z;r <br />SIAIATURE <br />Jason Whitin , P <br />PRINTED NAME AND TITLE <br />10/6/2022 <br />DATE <br />City of Elk River <br />OW�NE_R^(Firme) <br />� vv� <br />SIGNATURE <br />Brandon Wisner, Engineering Project Manager <br />PRINTED NAME AND TITLE <br />10/12/2022 <br />DATE <br />AIA Document G701- - 2017 Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "American <br />Institute of Architects,” "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document <br />was produced by AIA software at 14:46:15 CT on 10/0612022 under Order No.2114310719 which expires on 0412412023, is not for resale, is licensed for one- <br />time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail <br />copyright@aia.org. <br />User Notes: (3B9ADA3E) <br />