Laserfiche WebLink
Crews lowered approximately 400 feet of 500 MCM underground feeder wire along <br />th <br />Dodge Avenue north of 5 Streetrelated to the Highway 169 Redefine project. <br /> <br /> Crews are currently working on installing transformers and pedestals for six new <br />services to feed lights, signals, and traffic management equipment at Highway 101and <br />th <br /> Avenue related to the Highway 169 <br />Highway 10 as well as at Highway 169 and 197 <br />Redefine project. <br /> <br /> The operations director and I met with a representative from AltecIncto spec the <br />digger truck we are ordering in 2023. <br /> <br /> Crews continue to change out poles which failed inspection and compromised <br />underground infrastructure when they get the chance. <br /> Data collection on system infrastructure continues in order to work towards our goal of <br />converting our mapping system from CAD to GIS. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />______________________________________________________________________________ <br />Page 2 of 2 <br />104 <br /> <br />