My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1h EMRUSR 10-11-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2022
>
10-11-2022
>
6.1h EMRUSR 10-11-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2022 1:17:29 PM
Creation date
10/12/2022 1:17:29 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Crews lowered approximately 400 feet of 500 MCM underground feeder wire along <br />th <br />Dodge Avenue north of 5 Streetrelated to the Highway 169 Redefine project. <br /> <br /> Crews are currently working on installing transformers and pedestals for six new <br />services to feed lights, signals, and traffic management equipment at Highway 101and <br />th <br /> Avenue related to the Highway 169 <br />Highway 10 as well as at Highway 169 and 197 <br />Redefine project. <br /> <br /> The operations director and I met with a representative from AltecIncto spec the <br />digger truck we are ordering in 2023. <br /> <br /> Crews continue to change out poles which failed inspection and compromised <br />underground infrastructure when they get the chance. <br /> Data collection on system infrastructure continues in order to work towards our goal of <br />converting our mapping system from CAD to GIS. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />______________________________________________________________________________ <br />Page 2 of 2 <br />104 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.