My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. BASR 08-23-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2020-2029
>
2022
>
08-23-2022
>
5.3. BASR 08-23-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 8:51:04 AM
Creation date
8/18/2022 8:48:05 AM
Metadata
Fields
Template:
City Government
type
BASR
date
8/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to continue keeping Elk River looking prestine. <br />Z. We kept it within set backs on the East, West, and South Side of the garage to keep the design of the <br />existing structure. We would like a garage unique to the property and other surrounding properties <br />have garages outside of city ordinance. We are not requesting max set backs on the East, West and <br />South side as we would like the garage to match the existing structure and those around it. <br />I The attached garage will change the appearance but conforming with the neighborhood, increasing <br />property value, and will only make the neighborhood more appealing as we strive to continue keeping <br />Elk River a beautiful place to live. <br />
The URL can be used to link to this page
Your browser does not support the video tag.