My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6c ERMUSR 08-09-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2022
>
08-09-20222
>
5.6c ERMUSR 08-09-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2022 11:47:03 AM
Creation date
8/6/2022 11:47:03 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/9/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CSAH 75 CSAH 13 SP 071-613-012 Weekly Meeting Minutes 09292021.docx <br /> 1 <br /> <br />Weekly Progress Meeting Agenda <br />SP#: SP 071-613-012 Date: 9/29/2021 <br />Highway Description: CSAH 13 <br />Project Description: CSAH 13 from Line Ave. to Tyler St. <br />Owner: Sherburne Co. (David Roedel) <br />Project Manager: Bob Meurer Lead Inspector: Jason Buboltz <br /> <br />Attendees: See attendance sheet <br /> <br />1. Review Previous Meeting Notes <br />a. Any edits, additions or corrections? <br />i. 3. a. iii. All but one lift of bituminous required by October 31 <br /> <br />2. Outstanding Issues <br />a. Reclaimed aggregate gradation concerns – passing tests received <br />b. Fix damaged area on Trott Brook boulevard <br />c. Existing light pole bases – one to pull near water treatment facility driveway – Jason (NL) to <br />check <br />d. New Look mentioned concern for DCP testing for granular – anticipate being too clean <br />i. Nukes needed for granular, not DCP; DCP only for Class 5 <br />e. Looking at modifying drainage near the water treatment facility – pending <br />f. 15 inch CMP for use at driveway at STA 126 – 62 LF Total <br />g. Plan to pave gravel driveways – details to come <br />h. Salvage structures at 185th damaged – New Look to repair – Done <br /> <br />3. Contractor’s Schedule <br />a. Two-Week Schedule – attached <br />b. Delays <br />i. Controlling item: Potential for material delays for 12” and 15” storm sewer pipe <br />ii. Non-controlling items: None <br />c. Contract time <br />d. New Look to provide long range schedule to interim completion date of October 31 to today <br /> <br />4. New Issues / Concerns; Other Items <br />a. Watermain conflict & relocation – work is completed; payment to be discussed at the agency <br />level <br />b. Updated surface sent <br />c. Schultz asked about using S524 curb head on the machine for outer ring of roundabout and <br />knocking head off to meet R424 profile – this is acceptable as long as curb head heights are <br />uniform <br /> <br />5. Utilities <br />a. ISD 728 – Arvig (Comm.): Trott Brook & 187th heading south ~500 LF <br />95
The URL can be used to link to this page
Your browser does not support the video tag.