My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1 SR 08-01-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
08-01-2022
>
10.1 SR 08-01-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 9:07:12 AM
Creation date
7/28/2022 10:17:20 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/1/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT <br />Public Open House <br />The study's first public input opportunity was conducted in December 2020 through January 2021 <br />and included a narrated presentation, an interactive comment map, and community survey. A total <br />of 516 people responded to a community survey, which included a total of 230 open-ended <br />comment responses. Detailed feedback received is in AppendixA. <br />From the community survey, the study team learned that: <br />There was strong <br />Congestion was the A large majority support for innovative <br />highest existing issue (77%) of the access changes, <br />experienced along the respondents travel closing access or <br />corridor. the corridor 2+ times adding interchanges. <br />per week. <br />The intersections of 173rd <br />There was low support and 171st were the top two <br />for adding more traffic intersections where <br />There was congestion was noted as the <br />signals or leaving the strong support g <br />corridor as is. highest concern. <br />for a wider, <br />safer median. <br />
The URL can be used to link to this page
Your browser does not support the video tag.