Laserfiche WebLink
I Terra <br />SUBCONTRACTOR <br />VENDOR <br />EMPLOYEE <br />Camco Construction <br />Camco Construction <br />Camco Construction <br />Camco Construction <br />Camco Construction <br />Camco Construction <br />Camco Construction <br />Camco Construction <br />Camco Construction <br />CONTINUATION SHEET <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing <br />Contractor's signed certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A A.1 B <br />ITEM BID DESCRIPTION OF WORK <br />NO. PACK <br />NO. <br />COST <br />CODE <br />04-4200 <br />04-4200 <br />04-4200 <br />04-4200 <br />04-4200 <br />04-4200 <br />04-4200 <br />04-4200 <br />04-4200 <br />C CA C.2 C.3 <br />SCHEDULED CHANGE BUDGET REVISED <br />VALUE ORDERS REVISION/ SCHEDULED <br />CONTINGENCY VALUE <br />TRANSFER <br />4A Masonry-CMU Labor <br />$ <br />251,000.00 $ - $ <br />4A CO#1 ASI#5 Added 4'' Block <br />$ <br />- $ - $ <br />4A CO#2 Century Fence- Temp Fence Replacement from Delivery <br />$ <br />- $ - $ <br />4A CO#3 Added CMU at Sill of S3 per RFI#96 <br />$ <br />- $ - $ <br />4A CO#4 RFI#150 <br />$ <br />- $ - $ <br />4A CO#5 Physical Training Duct Work Patch (From PSM) <br />$ <br />- $ - $ <br />4A CO#6 RFI#201 Door Frame 108 Reinstall (To MCD) <br />$ <br />- $ - $ <br />4A CO#7 RFI#201 Bondo and Re -Install Door 108 (To Century) <br />$ <br />- $ - $ <br />4A CO#8 RFI#201 Repaainting Door Frame 108 (To Stembrecher) <br />$ <br />- $ - $ <br />Distinctive Iron <br />05-5120 <br />5A <br />Structural Steel Material-Startup/Shop Drawings <br />$ <br />38,200.00 <br />Distinctive Iron <br />05-5120 <br />5A <br />Structural Steel -Material <br />$ <br />75,000.00 <br />Distinctive Iron <br />05-5120 <br />5A <br />Steel Material-Joist/Deck <br />$ <br />115,553.75 <br />Distinctive Iron <br />05-5120 <br />5A <br />Steel Material-Misc <br />$ <br />67,006.25 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#1 Salvaged Steel Bollards <br />$ <br />- <br />Distinctrve Iron <br />05-5120 <br />5A <br />CO#2 Increased RTU Loads <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#3 RFI#54 W8 Beam Connections <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#4 RFI#46 Trench Drain Grates <br />$ <br />- <br />Distinctrvelron <br />05-5120 <br />5A <br />CO#5 Predrilling Sill Angles for Centuryto Install <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#6 RFI#69 Removal of 6x4x1/4'' Angle At OH App Doors <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#7 ASI#8R Roof Transitions <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#8 DI Pre Drilling <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#9 COR#37 Added 2 Loose Lintels <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#10 COR#38R Added Steel <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#11 RFI#103 Angles Above W1 Windows <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#12 RFI#109 <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#13 RFI#100 <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#14 Replacement MC6x12 <br />$ <br />- <br />Distinctrvelron <br />05-5120 <br />5A <br />CO#15 Support for P3 At App Bay <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO#16 RFI#156 Angle Iron Material <br />$ <br />- <br />Distinctrvelron <br />05-5120 <br />5A <br />CO#17 Added Steel Plate at Training Tower <br />$ <br />Distinctive Iron Iron <br />05-5120 <br />5A <br />CO Trash Gate <br />$ <br />- <br />Patriot Erectors <br />05-5121 <br />5B <br />Structural Steel Erection <br />$ <br />58,000.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />Joists & Decking <br />$ <br />29,575.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />Metal Fabrications <br />$ <br />26,175.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />Bond <br />$ <br />4,000.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#1 PR#2R Clerestory Head Detail <br />$ <br />- <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#2 LT GA 3x3 Cavity Closure Angle Install <br />$ <br />- <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#3 RFI#69 Removal of angle at App Doors <br />$ <br />- <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#4 ASI#8R Roof Transition <br />$ <br />- <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#5 RFI#92 Slab Edge Detail at Mezzanine Opening <br />$ <br />- <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#6 PR#16 <br />$ <br />- <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#7 RFI#103 Angles Above W1 Windows <br />$ <br />- <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#8 RFI#109 <br />$ <br />- <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#9 RFI#100 <br />$ <br />- <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#10 RFI #101 <br />$ <br />- <br />PatriotErectors <br />05-5121 <br />5B <br />CO#11 RFI#156 Additional Angle Iron for Fan <br />$ <br />- <br />Page 2 / 10 <br />7,661.00 <br />(1,977.19) <br />1,655.00 <br />(678.00) <br />744.50 <br />(740.00) <br />(479.27) <br />(717.00) <br />87,196.25 <br />(1,232.00) <br />1,305.28 <br />1,406.22 <br />415.34 <br />676.41 <br />(2,038.93) <br />6,193.52 <br />468.54 <br />512.65 <br />3,702.44 <br />1,062.67 <br />(212.00) <br />2,775.64 <br />2,135.02 <br />(212.00) <br />1,203.29 <br />833.64 <br />2,730.55 <br />6,784.00 <br />1,272.00 <br />(1,060.00) <br />530.00 <br />230.00 <br />477.00 <br />424.00 <br />212.00 <br />742.00 <br />212.00 <br />1,612.00 <br />AIA DOCUMENT G703 <br />D E <br />F <br />WORK CO APLETED <br />MATERIALS <br />FROM PREVIOUS THIS PERIOD <br />PRESENTLY <br />APPLICATION <br />STORED <br />(D+ E) <br />(NOT IN <br />D OR E) <br />251,000.00 $ <br />7,661.00 $ <br />(1,977.19) $ <br />1,655.00 $ <br />(678.00) $ <br />744.50 $ <br />(740.00) $ <br />(479.27) $ <br />(717.00) $ <br />38,200.00 $ <br />75,000.00 $ <br />202,750.00 $ <br />67,006.25 $ <br />(1,232.00) $ <br />1,305.28 $ <br />1,406.22 $ <br />415.34 $ <br />676.41 $ <br />(2,038.93) $ <br />6,193.52 $ <br />468.54 $ <br />512.65 $ <br />3,702.44 $ <br />1,062.67 $ <br />(212.00) $ <br />2,775.64 $ <br />2,135.02 $ <br />(212.00) $ <br />1,203.29 $ <br />833.64 $ <br />2,730.55 $ <br />58,000.00 $ <br />29,575.00 $ <br />26,175.00 $ <br />4,000.00 $ <br />6,784.00 $ <br />1,272.00 $ <br />(1,060.00) $ <br />530.00 $ <br />230.00 $ <br />477.00 $ <br />424.00 $ <br />212.00 $ <br />742.00 $ <br />212.00 $ <br />1,612.00 $ <br />251,000.00 <br />7,661.00 <br />(1,977.19) <br />1,655.00 <br />(678.00) <br />744.50 <br />(740.00) <br />(479.27) <br />(717.00) <br />38,200.00 <br />75,000.00 <br />202,750.00 <br />67,006.25 <br />(1,232.00) <br />1,305.28 <br />1,406.22 <br />415.34 <br />676.41 <br />(2,038.93) <br />6,193.52 <br />468.54 <br />512.65 <br />3,702.44 <br />1,062.67 <br />(212.00) <br />2,135.02 <br />58,000.00 <br />29,575.00 <br />26,175.00 <br />4,000.00 <br />6,784.00 <br />1,272.00 <br />(1,060.00) <br />530.00 <br />230.00 <br />477.00 <br />424.00 <br />212.00 <br />742.00 <br />212.00 <br />1,612.00 <br />2,775.64 <br />(212.00) <br />1,203.29 <br />833.64 <br />2,730.55 <br />Tara Proj8wt Number 20 705 <br />0 k River F reStati on #3 <br />City of El k River <br />APPLICATION NO: 16 <br />APPLICATION DATE: 5/31/22 <br />PERIOD TO: 5/31/22 <br />G <br />TOTAL % <br />COMPLETED (G+C) <br />AND STORED <br />TO DATE <br />(D+E+F) <br />$ 251,000.00 100.00% $ <br />$ 7,661.00 100.00% $ <br />$ (1,977.19) 100.00% $ <br />$ 1,655.00 100.00% $ <br />$ (678.00) 100.00% $ <br />$ 744.50 100.00% $ <br />$ (740.00) 100.00% $ <br />$ (479.27) 100.00% $ <br />$ (717.00) 100.00% $ <br />$ 38,200.00 100.00% $ <br />$ 75,000.00 100.00% $ <br />$ 202,750.00 100.00% $ <br />$ 67,006.25 100.00% $ <br />$ (1,232.00) 100.00% $ <br />$ 1,305.28 100.00% $ <br />$ 1,406.22 100.00% $ <br />$ 415.34 100.00% $ <br />$ 676.41 100.00% $ <br />$ (2,038.93) 100.00% $ <br />$ 6,193.52 100.00% $ <br />$ 468.54 100.00% $ <br />$ 512.65 100.00% $ <br />$ 3,702.44 100.00% $ <br />$ 1,062.67 100.00% $ <br />$ (212.00) 100.00% $ <br />$ 2,775.64 100.00% $ <br />$ 2,135.02 100.00% $ <br />$ (212.00) 100.00% $ <br />$ 1,203.29 100.00% $ <br />$ 833.64 100.00% $ <br />$ 2,730.55 100.00% $ <br />58,000.00 100.00% $ <br />29,575.00 100.00% $ <br />26,175.00 100.00% $ <br />4,000.00 100.00% $ <br />6,784.00 100.00% $ <br />1,272.00 100.00% $ <br />(1,060.00) 100.00% $ <br />530.00 100.00% $ <br />230.00 100.00% $ <br />477.00 100.00% $ <br />424.00 100.00% $ <br />212.00 100.00% $ <br />742.00 100.00% $ <br />212.00 100.00% $ <br />1,612.00 100.00% $ <br />H I <br />BALANCE RETAINAGE <br />TO FINISH (IF VARIABLE <br />(C -G) RATE) <br />12,550.00 <br />383.05 <br />(98.86) <br />82.75 <br />(33.90) <br />37.23 <br />(37.00) <br />(23.96) <br />(35.85) <br />1,910.00 <br />3,750.00 <br />10,137.50 <br />3,350.31 <br />(61.60) <br />65.26 <br />70.31 <br />20.77 <br />33.82 <br />(101.95) <br />309.68 <br />23.43 <br />25.63 <br />185.12 <br />53.13 <br />(10.60) <br />138.78 <br />106.75 <br />(10.60) <br />60.16 <br />41.68 <br />136.53 <br />2,900.00 <br />1,478.75 <br />1,308.75 <br />200.00 <br />339.20 <br />63.60 <br />(53.00) <br />26.50 <br />11.50 <br />23.85 <br />21.20 <br />10.60 <br />37.10 <br />10.60 <br />80.60 <br />