Laserfiche WebLink
�� Terra <br />CONTINUATION SHEET <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing <br />Contractor's signed certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A A.1 B <br />SUBCONTRACTOR ITEM BID DESCRIPTION OF WORK <br />VENDOR NO. PACK <br />EMPLOYEE NO. <br />COST <br />CODE <br />Preconstruction <br />01-0002 <br />Preconstruction <br />Bonds & Insurance <br />01-0100 <br />Bonds & Insurance <br />Permit <br />01-0110 <br />Permit <br />CM General Requirements <br />01-0120 <br />CM General Requirements <br />CM Contingency <br />01-0130 <br />CM Contingency <br />CM Fee <br />01-0150 <br />CM Fee <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />Footings/Pads <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />Footings Labor <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />Walls Material <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />Walls Labor <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />Slab on Grade Material <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />Slab on Grade Labor <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />Reinforcing Material <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />CO#1 PR#4 Stepped Footings <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />CO#2 B/C to Dryden <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />CO#3 RFI#33 Stepped footings for B" Storm <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />CO#4 RFI#37 Extended Foundation @ 166 <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />CO#5 Footings along GL-B <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />CO#6 PR#19 Wellness Room <br />Thomsen Construction <br />Services <br />03-3300 <br />3A <br />CO#7 Concrete in Trash Enclosure (From Klein) <br />Concrete Treatments <br />03-3350 <br />3B & 9E <br />Polished Concrete and Resinous Flooring <br />Concrete Treatments <br />03-3350 <br />3B & 9E <br />CO#1 ASI#BR Changed Polished Flooring <br />Concrete Treatments <br />03-3350 <br />3B & 9E <br />CO#2 ASI#10 Stained Floor Logo in Lobby 116 <br />Concrete Treatments <br />03-3350 <br />3B & 9E <br />CO#3 Moisture Mitigation at App Bay Floor <br />Ultra Concrete <br />03-3390 <br />32D <br />Bond <br />Ultra Concrete <br />03-3390 <br />32D <br />Curb <br />Ultra Concrete <br />03-3390 <br />32D <br />Bollards/Flag Pole Footings <br />Ultra Concrete <br />03-3390 <br />32D <br />Sidewalks/Paving <br />Ultra Concrete <br />03-3390 <br />32D <br />CO#1 PR#7 Water Service <br />Ultra Concrete <br />03-3390 <br />32D <br />CO#2 Replacing Asphalt w/ Concrete at N side of App Bay <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Bond <br />Camco Construction <br />04-4200 <br />4A <br />Masonry-Rebar <br />Camco Construction <br />04-4200 <br />4A <br />Masonry-Misc Masonry Materials <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Insulation <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Grout Material <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Grout Labor <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Stone Material <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Stone Labor <br />Camco Construction <br />04-4200 <br />4A <br />Masonry-Facebr¢k Material <br />Camco Construction <br />04-4200 <br />4A <br />Masonry-Facebr¢k Labor <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Precast Material <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Precast Labor <br />Camco Construction <br />04-4200 <br />4A <br />Masonry-CMU Material <br />AIA DOCUMENT G703 <br />C CA <br />C.2 <br />C.3 <br />D E <br />F <br />SCHEDULED CHANGE <br />BUDGET <br />REVISED <br />WORK CO APLETED <br />MATERIALS <br />VALUE ORDERS <br />REVISION/ <br />SCHEDULED <br />FROM PREVIOUS THIS PERIOD <br />PRESENTLY <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />TRANSFER <br />(D+ E) <br />(NOT IN <br />D OR E) <br />$ 10,000.00 <br />$ 76,368.00 <br />$ 400.00 <br />$ 724,061.00 $ <br />$ 233,000.00 <br />$ 101,734.00 <br />$ 22,000.00 $ <br />$ 32,000.00 $ <br />$ 14,000.00 $ <br />$ 60,000.00 $ <br />$ 73,000.00 $ <br />$ 112,900.00 $ <br />$ 35,000.00 $ <br />$ 73,189.00 $ <br />$ 2,400.00 $ <br />$ 37,000.00 $ <br />$ 9,800.00 $ <br />$ 170,800.00 $ <br />S - S <br />15,000.00 <br />40,000.00 <br />115,000.00 <br />20,000.00 <br />42,000.00 <br />50,000.00 <br />60,000.00 <br />42,000.00 <br />75,000.00 <br />230,000.00 <br />35,000.00 <br />40,000.00 <br />100,000.00 <br />Page l/10 <br />$ 10,000.00 $ 10,000.00 $ - <br />$ 76,368.00 $ 76,368.00 <br />$ 1,033.46 $ 1,433.46 $ 1,433.46 <br />$ (23,154.35) $ 700,906.65 $ 687,015.70 $ 12,714.55 <br />$ (224,466.82) $ 8,533.18 $ - <br />$ 101,734.00 $ 90,812.61 <br />$ - $ 22,000.00 $ 22,000.00 <br />$ - $ 32,000.00 $ 32,000.00 <br />$ - $ 14,000.00 $ 14,000.00 <br />$ - $ 60,000.00 $ 60,000.00 <br />$ - $ 73,000.00 $ 70,750.00 $ 2,250.00 <br />$ - $ 112,900.00 $ 105,500.00 $ 7,400.00 <br />$ - $ 35,000.00 $ 35,000.00 <br />$ 2,500.00 $ 2,500.00 $ 2,500.00 <br />$ 500.00 $ 500.00 $ 500.00 <br />$ 600.00 $ 600.00 $ 600.00 <br />$ 550.00 $ 550.00 $ 550.00 <br />$ 2,480.00 $ 2,480.00 $ 2,480.00 <br />$ 5,150.00 $ 5,150.00 $ 5,150.00 <br />$ 650.00 $ 650.00 $ - $ 650.00 <br />$ - $ 73,189.00 $ 73,189.00 <br />$ (3,639.00) $ (3,839.00) $ (3,839.00) <br />$ (1,000.00) $ (1,000.00) $ (1,000.00) <br />$ 6,565.00 $ 6,565.00 $ 6,565.00 <br />$ - $ 2,400.00 $ 2,400.00 <br />$ - $ 37,000.00 $ 21,000.00 $ 16,000.00 <br />$ - $ 9,800.00 $ - $ 5,660.00 <br />$ - $ 170,800.00 $ - $ 145,180.00 <br />$ (994.93) $ (994.93) $ - <br />$ 11,593.62 $ 11,593.62 $ - <br />$ - $ 15,000.00 $ 15,000.00 <br />$ - $ 40,000.00 $ 40,000.00 <br />$ - $ 115,000.00 $ 115,000.00 <br />$ - $ 20,000.00 $ 20,000.00 <br />$ - $ 42,000.00 $ 42,000.00 <br />$ - $ 50,000.00 $ 50,000.00 <br />$ - $ 60,000.00 $ 60,000.00 <br />$ - $ 42,000.00 $ 42,000.00 <br />$ - $ 75,000.00 $ 75,000.00 <br />$ - $ 230,000.00 $ 230,000.00 <br />$ - $ 35,000.00 $ 35,000.00 <br />$ - $ 40,000.00 $ 40,000.00 <br />$ - $ 100,000.00 $ 100,000.00 <br />Tara Prolewt Number 20 705 <br />0 k River F reStati on #3 <br />City of El k River <br />APPLICATION NO: 16 <br />APPLICATION DATE: 5/31/22 <br />PERIOD TO: 5/31/22 <br />G H I <br />TOTAL % BALANCE RETAINAGE <br />COMPLETED (G+C) TO FINISH (IF VARIABLE <br />AND STORED (C -G) RATE) <br />TO DATE <br />(D+E+F) <br />$ 10,000.00 100.00% $ - $ 500.00 <br />$ 76,368.00 100.00% $ - $ 3,818.40 <br />$ 1,433.46 100.00% $ - $ 71.67 <br />$ 699,730.25 99.63% $ 1,176.40 $ 34,986.51 <br />$ - 0.00% $ 8,533.18 $ - <br />$ 90,812.61 69.26% $ 10,921.39 $ 4,540.63 <br />$ 22,000.00 100.00% $ - $ 1,100.00 <br />$ 32,000.00 100.00% $ - $ 1,600.00 <br />$ 14,000.00 100.00% $ - $ 700.00 <br />$ 60,000.00 100.00% $ - $ 3,000.00 <br />$ 73,000.00 100.00% $ - $ 3,650.00 <br />$ 112,900.00 100.00% $ - $ 5,645.00 <br />$ 35,000.00 100.00% $ - $ 1,750.00 <br />$ 2,500.00 100.00% $ - $ 125.00 <br />$ 500.00 100.00% $ - $ 25.00 <br />$ 600.00 100.00% $ - $ 30.00 <br />$ 550.00 100.00% $ - $ 27.50 <br />$ 2,480.00 100.00% $ - $ 124.00 <br />$ 5,150.00 100.00% $ - $ 257.50 <br />$ 650.00 100.00% $ - $ 42.50 <br />$ 73,189.00 100.00% $ - $ 3,659.45 <br />$ (3,839.00) 100.00% $ - $ (191.95) <br />$ (1,000.00) 100.00% $ $ (50.00) <br />$ 6,565.00 100.00% $ - $ 326.25 <br />$ 2,400.00 100.00% $ - $ 120.00 <br />$ 37,000.00 100.00% $ - $ 1,850.00 <br />$ 5,660.00 60.00% $ 3,920.00 $ 294.00 <br />$ 145,180.00 65.00% $ 25,620.00 $ 7,259.00 <br />$ - 0.00% $ (994.93) $ - <br />$ - 0.00% $ 11,593.62 $ - <br />$ 15,000.00 100.00% $ - $ 750.00 <br />$ 40,000.00 100.00% $ - $ 2,000.00 <br />$ 115,000.00 100.00% $ - $ 5,750.00 <br />$ 20,000.00 100.00% $ - $ 1,000.00 <br />$ 42,000.00 100.00% $ - $ 2,100.00 <br />$ 50,000.00 100.00% $ - $ 2,500.00 <br />$ 60,000.00 100.00% $ - $ 3,000.00 <br />$ 42,000.00 100.00% $ - $ 2,100.00 <br />$ 75,000.00 100.00% $ - $ 3,750.00 <br />$ 230,000.00 100.00% $ - $ 11,500.00 <br />$ 35,000.00 100.00% $ - $ 1,750.00 <br />$ 40,000.00 100.00% $ - $ 2,000.00 <br />$ 100,000.00 100.00% $ - $ 5,000.00 <br />