Laserfiche WebLink
PAY ESTIMATE #3 <br />CITY OF ELK RIVER <br />NATURES EDGE BUSINESS CENTER THIRD ADDITION <br />Base Bid <br />ITEM <br />ESTIMATED <br />CONTRACT <br />TRACT <br />CONTRACT <br />USED TO <br />ITEM Dg§PRIPTION <br />QUANTITY <br />UNIT <br />PRICE <br />AMOUNT <br />DATE <br />EXTENSION <br />64 <br />3" POLYSTYRENE INSULATION <br />40 <br />SQ YD <br />$ <br />37.00 <br />$ <br />. ....... . ............ <br />1,480.00 <br />28.4 <br />$ <br />1,050.80 <br />65 <br />DUCTILE IRON FITTINGS <br />6,500 <br />POUND <br />$ <br />11.50 1$ <br />74,750.00 <br />2,330 <br />$ <br />26,795.001 <br />66 <br />CASTING ASSEMBLY <br />31 <br />EACH <br />$ <br />462.00 I $ <br />14,322.00 <br />31 <br />$ <br />14,322.00 <br />67 <br />CONSTRUCT SANITARY STRUCTURE DESIGN 4007 <br />216.2 <br />LIN FT <br />$ <br />287.00 I $ <br />62,049.40 <br />216.2 <br />$ <br />62,049.40 <br />68 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 24"X36" <br />13.6 <br />I LIN FT <br />$ <br />586.00 I $ <br />7,969.60 I <br />13.6 <br />$ <br />7,969.60 <br />69 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />33.1 <br />I LIN FT <br />$ <br />477.00 I $ <br />15,788.701 <br />33.1 <br />$ <br />15,788.70 <br />70 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 <br />32.5 <br />I LIN FT <br />I $ <br />731.00 I $ <br />23,757.50 1 <br />33 <br />$ <br />23,757.50 <br />71 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 72-4020 <br />27.6 <br />LIN FT <br />$ <br />762.00 1 $ <br />21,031.201 <br />27.6 <br />1 $ <br />21,031.20 <br />72 <br />ICONSTRUCT DRAINAGE STRUCTURE DESIGN 96-4020 <br />12.1 <br />LIN FT <br />I $ <br />1,268.00 1 $ <br />15,342.801 <br />12.1 <br />1 $ <br />15,342.80 <br />73 <br />IGEOTEXTILE FILTER TYPE 4 <br />202 <br />I SQ YD <br />I $ <br />4.00 I $ <br />808.00 I <br />118 <br />I $ <br />472.00 <br />74 <br />IRANDOM RIPRAP CLASS IV <br />35.9 <br />I CU YD <br />$ <br />166.00 I $ <br />5,959.40 I <br />35.9 <br />I $ <br />5,959.40 <br />75 <br />(ARTICULATED BLOCK MAT CLOSED CELL TYPE B <br />66 <br />I SQ YD <br />$ <br />218.00 <br />$ <br />14,388.00 I <br />$ <br />- <br />76 <br />16" CONCRETE WALK <br />128 <br />I SQ FT <br />I $ <br />11.30 <br />I $ <br />1,446.40 I <br />I $ <br />- <br />77 <br />ICONCRETE CURB AND GUTTER DESIGN B612 <br />101 <br />LIN FT <br />$ <br />25.65 I $ <br />2,590.65 I <br />63 <br />I $ <br />1,615.95 <br />78 <br />(CONCRETE CURB AND GUTTER DESIGN B618 <br />5,150 <br />I LIN FT <br />$ <br />12.65 I $ <br />65,147.50 I <br />5,152 <br />$ <br />65,172.80 <br />79 <br />17" CONCRETE DRIVEWAY PAVEMENT <br />28 <br />I SQ YD <br />$ <br />63.00 <br />$ <br />1,764.00 I <br />29 <br />$ <br />1,827.00 <br />80 <br />8" CONCRETE DRIVEWAY PAVEMENT <br />55 <br />SQ YD <br />$ <br />63.00 <br />$ <br />3,465.00 I <br />49 <br />I $ <br />3,087.00 <br />81 <br />TRUNCATED DOMES <br />20 <br />SQ FT <br />I $ <br />100-00 $ <br />2,000.00 I <br />$ <br />- <br />82 <br />PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 <br />725 <br />LIN FT <br />I $ <br />14.50 I $ <br />10,512.501 <br />723 <br />$ <br />10,483.50 <br />83 <br />ITRAFFIC CONTROL <br />i <br />I LUMP SUM <br />$ <br />2,250.00 $ <br />2,250.00 <br />1 <br />$ <br />2,250.00 <br />84 <br />ISIGN PANELS TYPE C <br />26.3 <br />I SQ FT <br />$ <br />55.00 I $ <br />1,446.50 <br />$ <br />- <br />85 <br />(INSTALL SIGN <br />2 <br />I EACH <br />$ <br />150.00 I $ <br />300.00 <br />$ <br />- <br />86 <br />ISTABILIZED CONSTRUCTION EXIT <br />1 <br />I LUMP SUM <br />I $ <br />1,500.00 $ <br />1,500.00 I <br />1 <br />$ <br />1,500.00 <br />87 <br />(EROSION CONTROL SUPERVISOR <br />i <br />I LUMP SUM <br />1$ <br />1,500.00 1 $ <br />1,500.00 1 <br />1 <br />$ <br />1,500.00 <br />88 <br />ISTORM DRAIN INLET PROTECTION <br />17 <br />I EACH <br />1$ <br />150.00 1 $ <br />2,550.00 I <br />2 <br />$ <br />300.00 <br />89 <br />ICULVERT END CONTROLS <br />4 I <br />EACH <br />$ <br />250.00 <br />$ <br />1,000-00 I <br />4 <br />$ <br />1,000.00 <br />90 <br />(SILT FENCE; TYPE MS <br />4,300 I <br />LIN FT <br />$ <br />2.62 <br />$ <br />11,266.00 I <br />8,073 <br />I $ <br />21,151.26 <br />91 <br />ISEDIMENT CONTROL LOG TYPE WOOD FIBER <br />9,200 <br />LIN FT <br />$ <br />2.77 I $ <br />25,484.00 <br />$ <br />- <br />92 <br />FERTILIZER TYPE 1 <br />7,560 <br />POUND <br />1$ <br />0.64 1$ <br />4,838.40 I <br />1,900 <br />I $ <br />1,216.00 <br />93 <br />SODDING TYPE LAWN <br />600 I <br />SQ YD <br />$ <br />9.15 $ <br />5,490.00 <br />$ <br />- <br />94 <br />TROLLED EROSION PREVENTION CATEGORY 15 <br />42,147 <br />SQ YD <br />1$ <br />1.59 $ <br />67,013.73 I <br />20,534 <br />$ <br />32,649.06 <br />95 <br />(SEED MIXTURE 25-131 <br />I 4,576 <br />POUND <br />1$ <br />4.93 $ <br />22,559.68 I <br />836 <br />$ <br />4,121.48 <br />Page 3 <br />ER308 - Pay Estimate <br />