Laserfiche WebLink
PAY ESTIMATE #3 <br />CITY OF ELK RIVER <br />NATURES EDGE BUSINESS CENTER THIRD ADDITION <br />Base Bid <br />ITEM <br />ESTIMATED <br />NO. ITEM DESCRIPTIQN <br />QUANTITY <br />_ <br />r 1 MOBILIZATION <br />�- 1 <br />2 CLEARING <br />( 10 <br />{ 3 GRUBBING <br />{ 10 <br />4 CLEARING <br />{ 2.15 <br />{ 5 GRUBBING <br />6 REMOVE CONCRETE APRON <br />7 REMOVE GATE VALVE AND BOX <br />8 REMOVE HYDRANT <br />9 REMOVE SIGN <br />10 SALVAGE SIGN <br />11 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />12 REMOVE WATERMAIN <br />13 REMOVE CONCRETE CURB <br />{ 14 REMOVE BITUMINOUS PAVEMENT <br />15 EXCAVATION - COMMON <br />16 DEWATERING <br />17 SUBGRADE SOIL MODIFICATION <br />18 SUBGRADE PREPARATION <br />19 AGGREGATE BASE CLASS 5 - TRAIL (CV) (P) <br />20 AGGREGATE BASE CLASS 5 - STREET (CV) (P) <br />21 MILL BITUMINOUS SURFACE (2.0") <br />22 BITUMINOUS MATERIAL FOR TACK COAT <br />23 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) 2.5" THICK <br />24 TYPE SP 12.5 WEARING COURSE MIXTURE (3,B) 2.0" THICK <br />25 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) 2.5" THICK <br />26 15" RC PIPE APRON <br />27 18" RC PIPE APRON <br />{ 28 21" RC PIPE APRON <br />29 42" RC PIPE APRON <br />30 TRASH GUARD FOR 15 PIPE APRON <br />31 TRASH GUARD FOR 18" PIPE APRON <br />2.15 <br />1 <br />1 <br />1 <br />1 <br />2 <br />590 <br />10 <br />797 <br />1,374 <br />95,211 <br />1 <br />10,471 <br />28.9 <br />495 <br />3,088 <br />124 <br />705 <br />2,686 <br />10,072 <br />9,948 <br />3 <br />2 <br />1 <br />1 <br />3 <br />2 <br />Page 1 <br />CONTRACT CONTRACT USED TO <br />UNIT UNIT PRICE AMOUNT DATE EXTENSION <br />LUMP SUM $ 70,400.00 $ 70,400.00 0.75 $ 52,800.00 <br />EACH $ 112.80 $ 1,128.00 10 $ 1,128.00 <br />EACH $ 75.20 $ 752.00 10 $ 752.00 <br />ACRE $ 7,200.00 $ 15,480.00 2.15 $ 15,480.00 <br />ACRE $ 4,800.00 $ 10,320.00 2.15 $ 10,320.00 <br />EACH $ 300.00 $ 300.00 1 $ 300.00 <br />EACH $ 400.00 $ 400.00 1 $ 400.00 <br />EACH $ 400.00 $ 400.00 1 $ 400.00 <br />EACH $ 50.00 $ 50.00 1 $ 50.00 <br />EACH $ 50.00 $ 100.00 1 $ 50.00 <br />LIN FT $ 3.50 $ 2,065.00 545 $ 1,907.50 <br />LIN FT $ 90.00 $ 900.00 10 $ 900.00 <br />LIN FT $ 3.50 $ 2,789.50 798 $ 2,793.00 <br />SQ YD $ 5.00 $ 6,870.00 1,374 $ 6,870.00 <br />CU YD $ 1.96 $ 186,613.56 90,211 $ 176,813.56 <br />LUMP SUM $ 44,000.00 $ 44,000.00 1 $ 44,000.00 <br />SQ YD $ 0.75 $ 7,853.25 II $ - { <br />ROAD STA $ 600.00 $ 17,340.00 14.45 4 $ 8,670,001 <br />CU YD $ 35.60 $ 17,622.00 $ - <br />CU YD $ 27.00 $ 83,376.00 1,544 $ 41,688.00 1 <br />SQ YD $ 20.00 $ 2,480.00 $ - <br />GALLONS $ 3.00 $ 2,115.00 $ - <br />SQ YD $ 13.70 $ 36,798.20 $ - <br />SQ YD $ 8.65 $ 87,122.80 $ - <br />SQ YD $ 10.30 $ 102,464.40 $ <br />EACH $ 1,040.00 $ 3,120.00 3 $ 3,120.00 <br />EACH $ 1,102.00 $ 2,204.00 2 $ 2,204.00 <br />EACH $ 1,257.00 $ 1,257.00 1 ( $ 1,257.00 <br />EACH $ 2,682.00 $ 2,682.00 1 $ 2,682.00 <br />EACH $ 556.00 $ 1,668.00 3 $ 1,668.00 <br />EACH $ 610.00 $ 1,220.00 2 $ 1,220.00 <br />ER308 - Pay Estimate <br />