SWPP NARRATIVE VEGETATION GROUND COVER SCHEDULE <br />This commercial project construction will consist of site clearing, grading, utilities, and parking 1. Stabilization of all exposed soil areas must be initiated immediately but in no <br />construction. Construction is planned for 2022. case completed later than seven (7) days after the construction activity in that <br />portion of the site has temporarily or permanently ceased. Seeding and <br />The permanent stormwater treatment for this project is an infiltration basin on -site and is mulching shall conform to the latest NPDES requirements for installation <br />also part of an off -site regional pond located east of this project. schedule with regards to grading. <br />2. Permanent turf ground cover shall include all disturbed areas be covered with a <br />First, perimeter silt fence and rock construction entrance shall be installed. Then site work minimum 6" topsoil and sodded or seeded as allowed by City, or as proposed on <br />shall commence. The contractor shall dispose all debris off -site within 24 hours. Then the City approved landscape plan for the project. If not otherwise specified, turf <br />site can be graded, utilities installed, building constructed, curbing and pavements installed, seed to be MnDOT mix 25-131 applied at 220 Ibs/ac. Infiltration basin <br />final grade tolerance, and landscape final stabilization. Once final grade is established and <br />certified, the site shall be stabilized with seed and mulch or sod. Once vegetation is seed to be 33-261 applied at 35 Ibs/ac in bottom of basin and up 3 <br />established, temporary erosion control measures shall be removed. feet from bottom, with bottom of basin mulched with clean grain straw <br />(Mn/DOT Type 3) applied at 2 tons/cc. MnDOT Type 1 mulch shall be <br />applied at 2 tons/ac and disc anchored in areas not covered by sod or <br />POLLUTION PREVENTION NOTES erosion blanket. Seeding and mulching shall conform to the latest NPDES <br />requirements for installation schedule with regards to grading. <br />Solid waste: collected sediment, asphalt and concrete millings, floating debris, paper, plastic, 3. Temporary ground cover to be MnDOT seed mix 22-111 shall be applied at 31 <br />fabric, construction debris and other wastes must be disposed of properly off -site and must Ibs/ac, or equivalent as approved by City. MnDOT Type 1 mulch shall be applied <br />comply with MPCA requirements. at 2 tons/ac and disc anchored in areas not covered by sod or erosion blanket. <br />4. Fertilizer for turf shall be MnDOT Type 3 22-5-10 and applied at 350 Ib/ac. <br />Hazardous materials: oils, gasoline, paint, and any hazardous substance must be properly Disc fertilizer into top 3" of soil. Fertilizer for stormwater basin shall be Type 4, <br />stored, including secondary containment, to prevent spills, leaks or other discharge. Restricted 17-10-7 at 120 Ib/ac. Specification reference is MnDOT 2574. <br />access to storage areas must be provided to prevent vandalism. Storage and disposal must 5. Dormant seed mix shall be used after November 1 or when temperatures do not <br />be in compliance with MPCA regulations. exceed 40° F, using same rates specified above. No seed shall be placed on <br />External washing of trucks or other construction vehicles is not allowed on site. No engine snow or ice greater than 2" in depth. <br />degreasing is allowed on site. No concrete washouts are allowed on site. 6. Any seeded areas that do not become established with vegetation shall be <br />re -seeded at Contractor's expense. <br />Concrete truck washout is not to be allowed on site unless washout waste is contained with 7• Erosion blanket shall be installed in seed areas with ground surface slopes of <br />no discharge to ground surface or site drainage facilities. Containment systems are to be 4H:1V or steeper. <br />located a minimum 50 feet away from drainage facilities and watercourses. Containment <br />systems shall have on impermeable liner. Containment system shall be clearly marked with EROSION CONTROL NOTES <br />signage. <br />All sanitary waste must be collected from portable toilet units on site by a licensed waste 1. All devices necessary to control erosion and sediment (I.E. perimeter silt fence, rock <br />management contractor. The units must be secured and shall be maintained on a regular construction entrances, swales, ponds, berms, ETC.) shall be installed prior to any other <br />basis as needed to prevent overfilling. construction operations. <br />2. After completion of final grading, exposed soils must be permanently stabilized within 7 <br />days. Stabilization shall consist of disc -anchored seed & mulch, HECP with fiber <br />EROSION CONTROL MAINTENANCE SCHEDULE reinforced matrix, erosion blanket with seed, or sod. <br />3. The site must be kept in a well drained condition at all times. The contractor shall be <br />1. Erosion control measures shall be inspected by the contractor's representative and responsible for temporary ditches, or other means necessary to ensure proper drainage. <br />maintained by the contractor every Friday and within 24 hours after any rainfall event The building pad must be provided with a positive outflow. This work shall be incidental <br />larger than 1/2" until the project is completed. Maintenance requirements are as follows: to the grading contract. <br />4. Entering/exitingof the site shall occur only at rock construction entrance to reduce <br />silt fence - 1 /3 height of fence or damaged, remove sediment and/or repair fence within y <br />24 hours; rock entrance - refresh as necessary to conform to detail; inlet protection tracking of dirt onto paved streets. Sediment tracked onto streets during working hours <br />must be reclaimed via street scraping and sweeping <br />inserts - remove sediment after each rain event, clean or replace filter when clogged; the end of each working day. <br />surface water - drain and stabilize, within 7 days of discovery; and street sweeping - 5. Storm water discharge pipe outlet energy dissipation shall <br />ll be provided by ripwith <br />remove all sediment tracked onto paved surfaces within 24 hours or as directed by City size, quantity, and placement in accordance with City standards. Rip -rap installation <br />rap tallation <br />Engineer. shall be within 24 hours of pipe installation. <br />2. Replacement - Fabric shall bee replaced promptly when it decomposes or becomes 6. Install silt fence around all temporary inactive stockpiles which are not place within <br />ineffective before the barrier longer necessary. existing silt fence area or other perimeter erosion controls. <br />7. Stabilization of temporaryor permanent drainage ditches that drain water from the <br />3. Any sediment remaining in place after silt fence is no longer required shall be dressed to P g <br />construction site must be initiated within 24 hours of connectingthe drainage ditch to <br />conform with the existing grade, prepared, and seeded with appropriate seed mix, as g <br />any storm water conveyance system and must be completed using erosion blanket. <br />directed by the engineer. <br />4. Removal of the silt fence- Silt fences shall be removed when they have served their useful 8. Sufficient personel, equipment, and materials shall be mobilized within 24 hours of <br />purposebut not before the upward sloping area has been permanently stabilized. written order (ie. email) by the owner or owners representative to conduct corrective <br />work and install temporary erosion control work in the case of an emergency. <br />/ '889 J <br />�4 890 TC 889 0 9 <br />-7 K / <br />\� P <br />X 890.7 , <br />\ / 891 \ TC 890. / 2 <br />X 891.4 / <br />\ TC 891. <br />SILT FENCE <br />cb / / 892.0 X <br />X87./2 <br />0 <br />\ / A <br />oo ° <br />\ \ 891.9 <br />89/ �03� �. O �`C 00 <br />\ 93� f 3.0 o0 <br />0 ° <br />o \ �$ e�� O\� ° o ° \jog <br />C���' , / / / C 892.1 X 892.2 <br />\ \ 11 92 i �� A <br />\ RIM ELEV. /C/ Q+ 892. o <br />\ =893.4 80 <br />9214� ° <br />/ <br />\ p0 <br />o0 <br />\ 00 <br />TOP NUT OF / 00 O god` <br />X�3 Q <br />\ HYDRANT <br />\ ELEV.=895.66 00° <br />�� 0 0 <br />\\ 892. 72 + X 892.4 L r 0 0 <br />20� <br />09 <br />TC 3.6 <br />\ o o° ° ° X 892.0 <br />00 00 <br />PGj 893. i .:::'..T o 0 <br />\\\ <br />o 00 <br />0 0 <br />893.2 O ° X ��s o <br />E o �ya� o ° <br />\ �� 0 0 00 <br />X <br />EROSION CONTROL INSTALLATION SCHEDULE <br />1. Silt fence shall be installed or restored prior to any construction. Silt fence <br />shall be located as shown to intercept runoff. The area located beyond the <br />perimeter silt fence shall not be disturbed during construction. <br />2. Rock Construction Entrance shall be installed prior to grading operations. <br />3. All storm sewer inlets shall have inlet protection inserts installed. Inserts shall <br />be "Road rain -Top Slab" or "Road Drain -Curb & Gutter" inlet protection devices <br />as manufactured by WIMCO (or approved equal) and installed per manufacture's <br />recommendations. <br />4. All erosion control installations shall remain in place and be maintained in good <br />condition by the contractor until the site has been re -vegetated, at which time <br />it shall be removed by the contractor. For proposed paved surface areas, the <br />contractor may remove necessary silt fencing to construct roadway, while <br />maintaining adequate erosion control in adjacent areas. <br />5. Sufficient topsoil shall be stockpiled to allow for the replacement of 6" topsoil <br />for disturbed areas to be re -vegetated. <br />6. The contractor shall schedule site grading, utility installation and roadway <br />construction so that the general site can be mulched and re -seeded soon after <br />disturbance. Areas that will not be subject to construction traffic for 7 days <br />shall be seeded and mulched or sodded within 7 days of final grading. <br />SWPPP AMENDMENTS <br />1. One of the individuals described in Responsible Party information must complete <br />all SWPPP changes. Changes involving the use of a less stringent BMP must <br />include a justification describing how the replacement BMP is effective for the <br />site characteristics. <br />2. NPDES permittees must amend the SWPPP to include additional or modified <br />BMP's as necessary to correct problems identified or address situations <br />whenever there is a change in design, construction, operation, maintenance, <br />weather or seasonal conditions having a significant effect on the discharge of <br />pollutants to surface waters or groundwater. <br />3. NPDES permittees must amend the SWPPP to include additional or modified <br />BMP's as necessary to correct problems identified or address situations <br />whenever inspections or investigations by the site owner or operator, USEPA or <br />MPCA officials indicate the SWPPP is not effective in eliminating or significantly <br />minimizing the discharge of pollutants to surface waters or groundwater or the <br />discharges are causing water quality exceedances or the SWPPP is not <br />consistent with the objectives of a USEPA approved TMDL. <br />INFILTRATION BASIN NOTES <br />1. Iniltration area shall be staked off during construction to restrict heavy equipment <br />traffic from compacting native soils. <br />2. Install appropriate temporary erosion control devices to prevent sediment from <br />enteringthe practice during construction. <br />P 9 <br />3. Grading of the infiltration basin shall be accomplished using low impact <br />earth-movingequipment to prevent compaction of the underlying soils. Small <br />P P Y 9 <br />tracked dozers and skid -steers with runner tracks are recommended. <br />4. In the event that sediment is introduced into the BMP during or immediately <br />following excavation, this material will need to be removed from the basin prior <br />to initiating the next step in the construction process. <br />5. Install sediment control around basin after completion of basin grading. <br />6. Seeding and installation of erosion control shall be completed within 48 hours of <br />final grading of basin. <br />SILT FENCE <br />889• , \ <br />11 <br />/ "��s <br />�\ Ran <br />�� <br />TC 890.1 <br />\ 889.50 <br />RESPONSIBLE PARTY <br />Contact information for the responsible <br />party for erosion control is: <br />Owner: LUND STORAGE <br />Contractor: Not Known Yet <br />Manager: Steve Krause <br />763-331-5178 <br />steve@sdkorchitects.com <br />DESIGN CALCULATIONS <br />Design calculations, including soil types are <br />on file with: Civil Engineering Site Design <br />SWPPP Designer: Scott Dahlke (Expires 2025) <br />l I I I h A A N I <br />U L_L_IVI <br />f EZEV. <br />/NV E1EV. 890 5 <br />, i, I - 86 5 <br />X / E�EV.�E)�8862 °° TOp�UTO <br />'• ` F A/ <br />C 89� 90.06 C BOM RANT E eV /y q / <br />o 9s' S U & GU7jER(//� / �R 8 3 9S O.B <br />w <br />892.5 <br />- 641. Ln <br />X \\� X 89J <br />0C <br />v I X 891.1 <br />\ / oo O ��o <br />C o 0 <br />892.7 0 GJ 0. SO o <br />\ \ 2. \� X891.9 ° o Q��� ��Q! �� X 892.1 �g <br />SILT FENCE \893.1 �y� 89 j o \ dos a92 0 0 ° <br />\/W \ �/ ` 000 '( <br />0 ��� p�' ® ° ° ` <br />\ y y o0 <br />X 891.9 00 <br />Y A p0 <br />IVA <br />ROCK CONSTRUCTION <br />ENTRANCE <br />- A <br />MISSISSIPPI RIVER <br />IMPARED WATER WITHIN <br />1 MILE RADIUS OF <br />PROJECT SITE <br />9 � A w/NcS) <br />0 �p <br />890.9 <br />E/8D05 890.7 \ <br />892 �8g0�\• . <br />FFE, X� <br />eU� 892 50 --7 <br />40,�(I 40 \ 5 C 1$ 887.8 X <br />00 ° <br />\ � 600 SF <br />00 <br />oo°o <br />-____, SOIL ^BORING J3 \ N <br />�C 892.0 <br />0.509• \ I <br />I <br />00 0 00 00 887.9 X <br />00 00,00000 <br />00 0000 <br />88.3 � l <br />r <br />I <br />d <br />C 891.0 <br />- SURMOUNTABLE <br />�( CURB & GUTTER <br />890.7 � 111 <br />SILT FENCE <br />C <br />�906 <br />I <br />J � g90 3 l 7jS'T <br />890.4 <br />�T <br />V <br />X 889.7 <br />1:5�90\_ �90 <br />•s <br />/ <br />888. NOTE: <br />AFTER COMPLETION OF INFILTRATION BASIN GRADING, X888.4 <br />8871 \ SILT FENCE <br />/ \ \ CONTRACTOR SHALL REMOVE ANY SEDIMENT <br />DEPOSITED IN BASIN, RE -STABILIZE SLOPES, AND <br />INSTALL FIBER LOG AROUND BASIN. REMOVAL OF <br />ANY SEDIMENT NECESSARY SHALL BE CONSIDERED <br />INCIDENTAL TO THE GRADING CONTRACT. <br />0 30 60 90 <br />GRAPHIC SCALE IN FEET <br />LEGEND: <br />908 <br />Existing Contours <br />>> <br />Existing Storm Sewer <br />908 <br />Proposed Contours <br />►► <br />Proposed Storm Sewer <br />= = = = = <br />Proposed Silt Fence <br />0 <br />Proposed Fiber Logs <br />p g s <br />Proposed Storm Sewer Inlet Protection <br />Flow Direction <br />19% <br />Proposed Erosion Blanket <br />SURVEY DATA <br />SURVEY INFORMATION PROVIDED BY: <br />MEYER ROHLIN LAND SERVICES <br />708 1st AVENUE NE <br />BUFFALO, MN 55313 <br />DATED: AUGUST 12, 2021 <br />BENCHMARK: <br />TOP NUT OF HYDRANT @ SOUTHWEST CORNER OF <br />OUTLOT F. <br />ELEV.=895.66. <br />PROJECT LOCATION <br />NW 1/4 of the NE 1/4 <br />SECTION 11 TOWNSHIP 32, RANGE 26, <br />SHERBURNE COUNTY, MINNESOTA. <br />EXISTING PROPERTY DESCRIPTION <br />OUTLOT F, ELK RIVER STATION, SHERBURNE COUNTY, MINNESOTA. <br />PROPOSED LEGAL DESCRIPTION <br />LOT 1, BLOCK 1, LUND RECREATIONAL STORAGE, <br />SHERBURNE COUNTY, MINNESOTA. <br />SITE DATA: <br />EXISTING ZONING: PUD PLANNED UNIT DEVELOPMENT <br />TOTAL LOT AREA: 96,544 SF = 2.21 AC. <br />BUILDING COVERAGE AREA: 33,100 S.F. (28.3%) <br />EXISTING IMPERVIOUS AREA: 2,606 S.F. (2.7%) <br />PROPOSED IMPERVIOUS AREA: 58,035 S.F. (64.0%) <br />(INCLUDES EXISTING IMPERVIOUS REMAINING) <br />PROPOSED DISTURBANCE AREA: 86,205 S.F. (1.97 AC.) <br />EROSION CONTROL QUANTITIES: <br />ITEM: <br />QUANTITY <br />UNIT <br />ROCK ENTRANCE <br />1 <br />EA <br />SILT FENCE <br />1,205 <br />LF <br />WOOD FIBER LOG <br />262 <br />LF <br />MULCH TYPE 1 & <br />DISC ANCHOR 0.31 <br />AC <br />EROSION BLANKET <br />CAT. 3 NT 1,649 <br />SY <br />INLET PROTECTION <br />9 <br />EA <br />LOCATION OF SWPPP REQUIREMENTS IN PLANS <br />DESCRIPTION <br />LOCATION <br />STANDARD BMP DETAILS <br />DETAILS ON SHEET C8 <br />STORMWATER CALCULATIONS <br />STORM SEWER REPORT <br />SITE MAP <br />STORM SEWER REPORT <br />GRADING PLAN SHEET C2 <br />TEMPORARY SEDIMENT BASIN <br />DETAIL ON SHEET C8 <br />SUMP MANHOLE <br />STORM SEWER SHEET C4 <br />SOILS DATA <br />GEOTECHNICAL REPORT <br />INDEX OF CIVIL SITE DRAWINGS: <br />CO PROJECT LOCATION PLAN <br />C1 SITE PLAN, PUD DEVELOPMENT PLAN <br />C2 GRADING AND DRAINAGE PLAN <br />C3 STORM SEWER PLAN <br />C4 SWPPP <br />C5 EXISTING CONDITIONS & REMOVAL PLAN <br />C6-C7 DETAILS <br />C8 LANDSCAPE PLAN <br />CLIENT: <br />SDK ARCHITECTS <br />5075 Holly Lane N., Unit 7 <br />Minneapolis, MN 55446 <br />Steve Krause <br />stevek@sdk-architects.com <br />763-331-5178 <br />rWJ <br />V <br />Q <br />rr <br />O <br />~ <br />I• <br />co <br />W <br />r <br />M <br />O <br />JCL <br />Z <br />2:zui <br />J m <br />O <br />it C <br />Aa <br />A <br />Q <br />O <br />1� w <br />L <br />m <br />vi <br />WCL <br />U <br />Wes_ <br />W <br />'� Y <br />W <br />cc <br />CO) <br />J <br />o q) <br />Q.o00 <br />L.. � � <br />N <br />I (n QN <br />° �.c <br />l a Lo E <br />�Ial <br />W <br />�� c <br />° " W <br />° <br />WI <br />I -aa LO <br />V ° <br />Z <br />r� <br />D U <br />N <br />ram_ <br />mm O� <br />W W <br />I OU"U <br />� � <br />IW�0c3 <br />4�_40 <br />y <br />10 o <br />O <br />LO <br />51 <br />° 4 <br />° <br />m <br />0 0 o <br />O <br />W <br />3 <br />1b Q. r3 <br />Q <br />c o o Iv <br />3 <br />° <br />� <br />� A <br />D_ <br />N <br />C) <br />� <br />� <br />N <br />m <br />m <br />O <br />m <br />W <br />O <br />LQ <br />� <br />U <br />LQ <br />O <br />O <br />O <br />U <br />FILE NO. 00865 <br />% M-d <br />SWPPP <br />