GENERAL UTILITY NOTES <br />1. <br />Specifications applicable for this project: Current standard specifications for the City of Elk River, MN <br />11. <br />The Contractor shall keep access roads clear of soil or other debris, and perform daily street <br />18. <br />Castings shall be Neenah or equivalent. Storm structures shall be precast concrete. <br />and all Minnesota Department of Health and MPCA requirements except where modified by these <br />cleaning as required by the NPDES permit. Positive drainage, controlled with erosion control and <br />19. <br />RCP (Reinforced Concrete Pipe) shall be Class 5 unless noted otherwise. <br />contract documents. <br />erosion prevention measures as required by the NPDES permit shall be performed. Inlet protection <br />19. <br />The contractor shall be responsible for coordinating with utility companies for power pole and/or line <br />2. <br />OSHA requirements shall be followed for all work on this project. <br />shall be installed within 48 hours after inlet construction. Unless specified on the plans or as a bid <br />relocation required. <br />3. <br />The Contractor shall notify "Gopher State One Call" prior to any excavation (651-454-0002 or <br />item on the Bid Form, any temporary culverts, ditches, filter fabric, etc. necessary to accomplish this <br />20. <br />The contractor shall provide all necessary traffic control. <br />1-800-252-1 1 66 out state.) <br />shall be performed as incidental to the Contract. <br />21. <br />The contractor shall be responsible for all grading and restoration required to restore surfaces to like <br />4. <br />The Contractor shall verify all locations and elevations of underground utilities with utility companies <br />12. <br />The Contractor shall preserve and protect the markers and monuments set for the subdivision of the <br />kind existing condition. <br />prior to any construction (storm sewer, sanitary sewer, water, natural gas, telephone, electric, etc.), <br />land. <br />22. <br />Existing curb and pavement damaged or impacted on adjacent property shall be restored with in -kind <br />and immediately notify the Engineer of any conflicts. <br />13. <br />The Contractor shall schedule the soils engineer to facilitate <br />materials and section. All match lines are to be saw cut. <br />5. <br />The Contractor shall protect all existing utilities and facilities to allow proper functioning during and <br />certification of all controlled fills in a timely fashion. Density tests shall meet the following: <br />23. <br />Pipe lengths shown are measured center of structure to center of structure or to end of apron. <br />after construction. Any required supporting structures shall be supplied by the Contractor as work <br />A. Density tests shall be taken on all trenches at locations as determined by the Engineer or his <br />24. <br />The contractor shall obtain a Utility Excavation Permit from the City Public Works Department prior to <br />incidental to the contract. <br />representi tave. <br />commencement of utility connections. <br />6. <br />The contractor shall immediately notify the Engineer of any conflicts between existing utilities, and the <br />B. Within the upper 3' of streets, private drives and parking lots, Contractor shall utilize approved soils <br />25. <br />PVC pipe crossing over watermain pipe shall be ASTM D 1785, ASTM D 2241, or AWWA C900. <br />proposed construction. The Engineer will coordinate with the Utility Company in question to determine <br />that are within 1 % optimum moisture content as defined by the Standard Proctor Test-ASTM: D-698 <br />26. <br />Contractor or owner to provide an as -built utility plan once construction is complete. <br />the need for relocation of the existing utility. <br />with 100% Standard Proctor Density and not exceeding compaction by more than 1 %. Below the <br />7. <br />Existing conditions such as sand in manholes or valve boxes shall be identified by the Contractor and <br />upper 3', compaction shall meet 95%. Grading tolerances shall be 0.1'. <br />these shall be reported to the Engineer prior to excavation by the Contractor. Once construction has <br />14. <br />The Owner shall pay for all testing of soils compaction. Any areas which fail to meet the above <br />begun, all damage to underground utilities will be assumed to have been caused by the Contractor, <br />standards shall be corrected and re -tested by the Owner's testing agent at the Contractor's expense. <br />any repairs necessary shall be performed by the Contractor at the Contractor's expense. <br />15. <br />Contractor shall provide temporary traffic control in compliance with MN/DOT "Temporary Traffic Control <br />8. <br />Final Plat shall govern for easements. <br />Zone Layouts Field Manual" most recent version for construction adjacent to travel ways. <br />9. <br />The Contractor shall coordinate with the local jurisdiction to obtain permits and meter for water <br />16. <br />Contractor shall be responsible for verification of the depth of existing stubs listed on this plan prior <br />source. All associated costs shall be incidental to the Contract, including disposal of test water <br />to the ordering of any fittings, structures, castings, etc. Engineer, Owner or City shall not be <br />into City's sanitary sewer system. The Contractor shall not operate gate valves or hydrants on the <br />responsible for any discrepancies found as depths are estimated. <br />City's water supply system. <br />17. <br />All manhole castings in pavement shall be sumped 0.05'. All catch basin castings in curb shall be <br />10. <br />The Contractor shall notify the City Engineer and the Project Engineer 48 hours prior to starting work <br />sumped 0.10'. Rim elevations on plan reflect sumped elevations. <br />or as required by the local jurisdiction or be subject to being shut down. <br />/ VE�EV;8gpS <br />i 0 O <br />/ �°j°\ °0°000 <br />0 <br />o <br />\ J <br />o o ° ° 49 LF 12" RCP <br />a 5 , / �OQ <br />00 <br />\ RIM ELEV. �/ Q�' °o o ° 1 <br />\ =893.4 / ,�/ � s 6g°lo mil <br />\ CBMH-23 <br />\ TOP NUT OF > g0�° o° <br />\ HYDRANT / / \ 48 DIA. PRECAST 09 0/' oo <br />\ ELEV.=895.66 RE=891.80 (R-3360-A) ' <br />\\ 892. j2+ IE(NE)=887.70 (1�2" IN) ° 0 ° �� � 00 <br />IE(SW)=887 70 (12 OUT) <br />IM ELEV.=889.6 <br />°' j <br />/ '889 <br />-7 <br />P <br />/ \ 0N 890 <br />/ J 1 <br />P \ -7891 <br />�90 <br />1 <br />TOP / 2 <br />EV�E'I%'�,g <br />0 <br />UT <br />00 000 <br />? tit' <br />0 890.06 , -1k7 �Rq/VT �eE_N I <br />Ra GUI eU/� T D I' 89 gK l l <br />Rq w/V�S) <br />0 <br />CB-24 <br />2'x3' PRECAST d / <br />RE=890.85 (R-3508-A2) \ <br />IE(SW)=887.90 (12" OUT) ,8g2 �a9� <br />890 �� S <br />° <br />892 5o <br />40 SUI L DlNO <br />11 <br />° ppO o <br />40' S, 600C <br />/ ° o°o SF <br />0 <br />° CBMH-31 15" RCP RCP <br />E 0y ° o ; ��o / 48 DIA. PRECAST INV=887.50 <br />o� ° on <br />RE=891.40 (R-3508-A2) <br />» °° 9 �r3 IE(SE)=887.10 (12 IN) ° o°° �' <br />\ °o 155 LF 12 RCP \ s °° °° <br />00o W / <br />O IE(SW)=886.70 (12 OUT) <br />\ \ ®0.39% o �� 0. <br />Ssz2 \� 2 O0 ° Q�� `Q -gig IE(SUMP)=883.70 (3' DEPTH) <br />0 0 9 00co 5 / <br />\ °° Q , °° / <br />° \\� i °o <br />o° <br />� 00 <br />\� CBMH-22 \ 00 0 +�p� / 0O ° °co p00- N ° 0" <br />48" DIA. PRECAST ° oa,� \ b <br />a RE=891.50 (R-3508-A2) _ / \ 71 LF 12" RCP <br />°o ° <br />IE(NE)=887.10 (12" IN) \ 12""FRCP 91 ® 0.56% E� 892 �O °°°°° °o°° °° ° o / <br />IE(SE)=887.10 (12" OUT) ° °° <br />�0 SUMP=884.10 (3' DEPTH) ,oF�, �'� INV=886.25 / /g0 \ 4eUl� DlN ° J I <br />\ �o,o WITH 5.5 CY CL IV / a 0 x140, �' D /\ <br />CB'-32 <br />0GRANITE RIP -RAP S; 600 <br />� WITH FABRIC AND, 2x3' PRECAST <br />o FILTER BLANKET as / 5 as RE=891.25 (R-3360-A) <br />so o /a a �6 as ' - 6. <br />66 LF 12" RCP 25 IE(NW)=887.50 (12" OUT) <br />64 LF 12 RCP s� �� o \\� / 2 $$ - Sa <br />\ 'A �� \ 9 887 <br />CBMH-21 ;:. --\ 888 �8 <br />48" DIA. PRECAST\/ .�- 9 \ 889 8sz <br />\ RE=890.90 (R-1733 \ <br />889 ° <br />WITH GRATE C) \ <br />IE(NW)=886.70 (12" IN) \\ :.t>_:M1 \ y FES-B INFILTRATION BASIN <br />IE(E)=886.70 (12"OUT) \ \ , / \ 12" RCP BOTTOM=886.25 <br />\ \ -887 "3 ,5 \ INV=886.25 100-YR HWL=888.4 <br />/ 63 LF 12" RCP / WITH 5.5 CY CL IV GRANITE RIP -RAP EOF=888.5 <br />\ / ®0 71 % WITH FABRIC AND FILTER BLANKET <br />\� \ \ \ <br />//VVE��'890 S <br />INSTALL MANHOLE OVER <br />CU EXISTING 15" RCP <br />MH-1 1 <br />48" DIA. PRECAST <br />RE=891.30 (R-1733) <br />IE(S)=887.30 (15" IN) <br />IE(N)=887.30f (EX. 15" OUT) <br />FIELD VERIFY <br />37 LF 15" RCP <br />® 0.54% <br />I " 1'S•T <br />NW <br />0 30 60 90 <br />GRAPHIC SCALE IN FEET <br />LEGEND: <br />-908- <br />Existing <br />Contours <br />>>- <br />Existing Storm Sewer <br />Existing <br />Water Main <br />> <br />Existing <br />Sanitary Sewer <br />Existing <br />Trees <br />Existing <br />Bndy Line <br />® <br />Proposed <br />Sanitary Sewer <br />I <br />Proposed <br />Water Main <br />►� <br />Proposed <br />Gate Valve <br />►► <br />Proposed <br />Storm Sewer <br />Proposed <br />Fire Hydrant <br />S U RVEY DATA <br />SURVEY INFORMATION PROVIDED BY: <br />MEYER ROHLIN LAND SERVICES <br />708 1st AVENUE NE <br />BUFFALO, MN 55313 <br />DATED: AUGUST 12, 2021 <br />BENCHMARK: <br />TOP NUT OF HYDRANT ® SOUTHWEST CORNER OF <br />OUTLOT F. <br />ELEV.=895.66. <br />INDEX OF CIVIL SITE DRAWINGS: <br />CO PROJECT LOCATION PLAN <br />C1 SITE PLAN, PUD DEVELOPMENT PLAN <br />C2 GRADING AND DRAINAGE PLAN <br />C3 STORM SEWER PLAN <br />C4 SWPPP <br />C5 EXISTING CONDITIONS & REMOVAL PLAN <br />C6-C7 DETAILS <br />C8 LANDSCAPE PLAN <br />CLIENT: <br />SDK ARCHITECTS <br />5075 Holly Lane N., Unit 7 <br />Minneapolis, MN 55446 <br />Steve Krause <br />stevek@sdk-architects.com <br />763-331-5178 <br />�WR <br />V <br />Q <br />cc <br />O <br />~ <br />LU <br />r <br />cc <br />z <br />JCL <br />Q� <br />co <br />a <br />z <br />LU <br />J c <br />W <br />LU <br />Q <br />LU <br />Cr <br />m <br />m cc <br />cc <br />VW <br />LLI <br />rY <br />LU <br />� <br />Q <br />z <br />J <br />C o <br />co <br />y <br />Z aqi <br />0 h C <br />644 <br />i pCULo I O <br />i o <br />2 <br />V <br />W � <br />(0 d U <br />u L0 -6 <br />mm <br />Q. y -6 <br />to yu) <br />I ��_0 <br />U <br />W <br />C:N3 <br />003 <br />�Z_ <br />O zi <br />V) <br />O <br />a`4i 3 <br />Q <br />N <br />C) <br />C) <br />C) <br />LO <br />CN <br />QO <br />m <br />o <br />m <br />W <br />o <br />W <br />ti <br />Q <br />W <br />0 <br />0 <br />o <br />v <br />FILE NO. 00865 <br />C3 <br />Storm Sewer Plan <br />