My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4. EDSR 05-16-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2021-2029
>
2022
>
05-16-2022
>
7.4. EDSR 05-16-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 10:21:35 AM
Creation date
5/13/2022 10:21:03 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
5/16/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 10 of 22 EDA & City Council Approved August 21, 2017 <br /> <br /> <br /> <br />a. Energy efficiency measures installed in or on a building include: <br />b. Facility systems optimization (commissioning/re-commissioning) <br />c. Facility systems control improvements <br />d. Process efficiency improvements (CenterPoint Energy) <br />e. Lighting efficiency improvements <br />f. Heating, ventilation and air conditioning system modifications <br />g. Exterior envelope improvements <br />h. Motor and pump efficiency improvements <br />i. Ground-source heat pump systems used to heat or cool a facility <br />j. Installation of equipment or devices that use renewable energy sources to <br />generate electricity or heat or cool a building including solar electricity <br />(photovoltaic), wind turbine or solar thermal. <br />Ineligible Fund Uses: <br />a. Inventory <br />b. Refinancing of existing debt <br />c. Working capital <br />d. Expenditures for the construction and/or renovation of residential units <br /> <br />Micro-Brewery Loan <br />Purpose: The Micro-Brewery microloan is available to business and property <br />owners located within the city of Elk River. <br /> Amount: Up to $74,999 of secondary financing not to exceed 20% of the <br />Total project cost. <br /> <br />Equity: Must have private-sector commitments for 50% of the project cost. <br />Borrower must provide 10% or more of project financing. <br /> <br />Rate: Fixed at 3%. <br /> <br />Term: Financing with a balloon payment in up to 5-years. Loans may be <br />amortized up to the following limits: <br />10 years on equipment uses <br /> <br />Extension: In the event that the Borrower is unable to obtain conventional <br />financing to replace the Microloan at the end of five years, the loan <br />may be extended up to two additional years at a market rate of <br />interest. <br /> <br />Criteria: At a minimum, 50% of Microloan dollars must be used for the <br />purchase of equipment. <br /> <br />Loans must be supported by sufficient collateral, which will include <br />personal guarantees. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.