My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4. EDSR 05-16-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2021-2029
>
2022
>
05-16-2022
>
7.4. EDSR 05-16-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 10:21:35 AM
Creation date
5/13/2022 10:21:03 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
5/16/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 9 of 22 EDA & City Council Approved August 21, 2017 <br /> <br /> <br /> <br /> <br />Equity: Must have a minimum of 10% equity provided by the borrower. <br /> <br />Rate: Fixed at 3% <br /> <br />Term: The maximum maturity date of the loan will be determined by the <br />useful life of the improvement and the energy payback achieved as <br />determined by ERMU. <br /> <br />For projects that have a shorter length of payback (2-5) years as <br />calculated according to energy savings, the loans will have an initial <br />maturity of up to 5 years from the date of closing. <br /> <br />Longer life improvements (6-15 years) may apply for a longer <br />maturity of up to 10 years. <br /> <br />Criteria: Microloan funds shall be spent on energy efficiency improvements <br />outlined below or related building improvement costs <br /> <br />Applicant must agree to energy audits conducted under the utility <br />company’s Conservation Improvement Program (CIP). If warranted, <br />engineering studies then are performed on facilities with conservation <br />opportunities under the utility company’s CIP Program. <br /> <br />Energy efficiency is defined as improvements that are rebatable by <br />the Elk River Municipal Utilities (ERMU) or the utility provider for <br />the property if not ERMU. Proposed energy efficiency improvements <br />that do not qualify for the utility’s prescriptive rebate program will be <br />reviewed and approved by the utility company servicing the upgrade <br />measures (e.g. Elk River Municipal Utilities, Connexus, CenterPoint) <br />along with a letter indicating eligible utility rebates. <br /> <br />Utility rebates as applicable will be assigned to the Elk River EDA <br />and applied toward principal repayment of the loan. <br /> <br />An Elk River Energy City Commission member will be asked to <br />participate in the EDA Finance Committee review. <br /> <br />The loans will be secured by personal and corporate guarantees, and <br />if applicable a lien on equipment financed and subordinate mortgage <br />on the property. <br /> <br />Installation must be certified through a licensed contractor and <br />electrician. New construction is eligible when participating with a <br />utility company rebate program. Eligible costs shall include only <br />incremental costs over industry design standards. <br /> <br />Permitted Fund Uses:
The URL can be used to link to this page
Your browser does not support the video tag.