Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Planning Commission Minutes <br />December 30, 1986 <br /> <br />Page 2 <br /> <br />Signage was the next item discussed. It was the consensus of the Planning <br />Commission that although this parcel is within a PUD that signage stay <br />consistent with similiar commercial zones within the City of Elk River. This <br />would mean two square feet of signage per lineal foot of frontage would be <br />allowed. There is 216 feet of frontage associated with Parcel VI, therefore, <br />432 square feet of total signage would be allowed for both buildings "A" and <br />"B" in that such signage would need to be reviewed and approved by the <br />Planning Commission at a later date. <br /> <br />Mr. Santwire indicated that Building "A" would be 18 feet high on the north <br />side of the steeple on the building, and 14 feet high on the south side of the <br />steeple, and the steeple would be somewhat higher. He further indicated that <br />the rest of the roof of the building, other than the steeple would be flat and <br />that the building would be painted blocks, similiar to the Elk River Mall. <br /> <br />Building & Zoning Administrator, Stephen Rohlf, indicated that if Parcel VI is <br />split into two lots, it would mean Building "A" would cover 27% of the one lot <br />and Building "B" would cover 32% of the other lot. Building "A" is <br />approximately 23,000 square feet and Building "B" is 3,300 square feet. The <br />Planning Commission indicated a concern with the lack of green space <br />associated with these buildings. It was agreed to by the Planning Commission <br />and the Developer to get more green space in front of Building "A". On the <br />north side of the steeple in Building "A", 17 feet of green space will be <br />provided and the sidewalks on the north side of the steeple will be <br />eliminated. On the south side of the steeple, of Building "A" there would be <br />6 feet of green space next to the building and a 4 foot sidwalk added. <br /> <br />The next item discussed by the Planning Commission was an approximately 20 <br />foot wide gap next to the handicap parking stalls in which a car could drive <br />in and out screwing up the traffic patterns. It was agreed to by the <br />developer that the gap between the parking and drive, in front of the handicap <br />parking stalls, would be reduced to 4 feet, to eliminate cars driving through <br />there. The uses associated with Building "A" and "B" it was agreed must stay <br />consistent with the uses allowed in the Barrington Place PUD Agreement. This <br />would be uses allowed in Cl, C2 and C3 zoned districts with some exceptions as <br />stated in the PUD agreement. Loading areas for Building "A" and "B" were the <br />next item of discussion. It was agreed to that the loading area for Building <br />"A" would be in the southeast notch of that building west of the future <br />expansion proposed for that building. This loading area would be striped and <br />marked as such. The only logical loading area for Building "B" would be the <br />drive in front of the parking lot for that building. The Planning Commission <br />agreed to allow it there. These loading areas are designated on the attached <br />site plan. <br />