Laserfiche WebLink
Expected <br />LT Goals (2032) <br />Date Started <br />Action(s) Taken <br />PCT Completed <br />Completion <br />Date <br />Initiated a study of new USA expansion for needed sewer <br />Urban Service Area expansion <br />Jan-22 <br />and water infrastrucutre needs <br />25% <br />Dec, 2022 <br />Cargill land swap secured 28 acres of prime industrial <br />property. Market and pursue development of existing EDA <br />July, 2022 (This <br />C/I develo )jnent <br />2021 <br />sites. <br />25% <br />phase) <br />Analysis of what to do with-arbage once closes in 2030. <br />Development of S echt property in eastern Elk River <br />Periodically speak with owner and developers <br />5% <br />Applied for Federal Grant to complete loop along CSAH 13, <br />Trail connections <br />Continuous <br />CSAH 12 and CR 40 <br />25% <br />2026 <br />Pedestrian Trail Connection downtown over the railroad and TH10. <br />Broadway on 10 (115 residential units), Business Center <br />Drive Extension, marketing EDA parcels. Pursuing specific <br />More retail development in western Elk River <br />2021 <br />sectors and businesses for location on west -side. <br />10% <br />What does redevelopment look like if H«-%7 10 becomes a freeway? <br />Riverwalk from Orono Park to City of Ramsey <br />Feasibility of moving train station to downtown <br />On hold <br />0% <br />Outdoor swimming )ool <br />Worked with legislators in 2022 to introduce bills for <br />funding of grade seperated interchanges on TH 10 between <br />Transportation development funding <br />Ongoing <br />Hyw 101 and Ramsey <br />15% <br />Unknown <br />