My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 SR 04-18-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
04-18-2022
>
4.4 SR 04-18-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 8:56:15 AM
Creation date
4/15/2022 8:27:20 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />4.12.22 <br />Brandon Wisner via email: bwisner@elkrivermn.gov <br />Engineering Project Manager <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />RE: Proposal for Commissioning Services <br /> Elk River Fire Station 3 Cx <br />st <br /> 9921 191 Ave, Elk River, MN 55330 <br /> KFI Proposal # P22-0559 <br />Dear Mr. Wisner, <br />KFI Engineers (KFI) is pleased to provide this proposal for Commissioning services on the above referenced project. <br />This proposal outlines our scope of work and associated compensation. This proposal is valid for 45 days from the <br />proposal date. <br /> <br />PROJECT UNDERSTANDING <br />This project consists of a new 17,489 square foot Fire Station which includes vehicle bays, offices, training rooms <br />and a training tower for the City of Elk River. The city is looking for commissioning services from the equipment <br />startup phase through the one-year warranty period. Equipment startups will begin in May of 2022. <br /> <br />BASIC SERVICES SCOPE OF WORK <br />KFI will commission the following systems: <br /> <br />1. HVAC Systems and Associated Controls <br /> RTU <br /> MAU <br /> VAVs (10) <br /> Boilers (2) and Pumps <br /> In-Floor Heat <br /> Split System <br /> Furnace <br /> Unit Heaters (14) <br /> Fans (11) <br /> Radiant Panels & FTRs <br /> Test & Balance Review <br />2. Lighting & Lighting Controls <br /> <br />The commissioning tasks to be performed are: <br /> <br />Construction & Acceptance Phases <br />1-866-534-3647 KFI-ENG.COM <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.