My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 SR 04-18-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
04-18-2022
>
4.4 SR 04-18-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 8:56:15 AM
Creation date
4/15/2022 8:27:20 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Fire Station Cx <br />City of Elk River <br />Page 2 of 6 <br /> <br />1. Review project schedule and provide the construction team Cx milestones and task durations for inclusion <br />in the official project schedule. <br />2. Develop a Commissioning (Cx) Plan. Update the Cx Plan throughout the project. The Cx Plan will identify <br />members of the Cx team, roles and responsibilities of each team member, the Cx schedule, and provide a <br />narrative of Cx tasks. <br />3. Attend and lead Cx kickoff meeting to assist with Cx coordination. <br />4. Develop custom construction checklists after all submittals have been approved by the design team. KFI will <br /> <br /> Verification checks to observe if installation correlates with the details, specifications, and <br />manufacturer requirements. <br /> Contractors will complete any contract document required for pre-functional verifications that <br />verify equipment startups, BAS point-to-point verifications and preliminary sequence checks. <br />5. Perform one (1) construction site visits during the project; During the site visits we anticipate the following <br />tasks: <br /> Review contractor progress on the construction checklists. <br /> Review equipment and system installations for conformance to the construction documents, industry <br />standards, manufacturer recommendations, and KFI experience. Document deficiencies on <br />observation reports, and forward to the project team for review and action. <br /> Conduct commissioning meeting to review progress on Cx tasks (and provide agendas, minutes, etc.). <br />We will coordinate site visits to coincide with regular construction meetings whenever possible to <br />make best use of everyone's time. When we cannot attend construction meetings, we will review <br />meeting minutes and provide comments where necessary. <br />Site visit is anticipated to include: <br /> Cx kickoff with contractors <br /> Final installation review <br /> Witness TAB processes <br />6. After reviewing and accepting the controls contractor self-testing (pre-functional testing) documents, KFI <br />will execute functional performance testing at the sampling rates identified above. Testing includes the <br />following tasks: <br /> Point-to-point verification (including sensor calibrations, input/output verification). <br /> Review graphics for accuracy to systems, menu operability, links, and schematic accuracy. <br /> Perform sequence testing through a combination of setpoint adjustments, trend reviews, and <br />manual overrides. <br /> Perform integrated systems testing. <br />KFI anticipates approximately four (4) trips during this phase to perform functional testing and retesting. <br />7. Provide one seasonal testing trip of HVAC systems to review sequence testing of equipment under <br />appropriate loads in all seasons. <br />8. Document functional test deficiencies on the Master Issue Tracking List and assist with project team to verify <br />that corrective actions are performed. After written notification of correction, KFI will retest deficiencies. <br />KFI considers one retest part of the normal scope of work. Additional retests will be at the contractor's <br />expense. <br />9. Execute a TAB review. KFI's review includes the following tasks: <br /> Conduct a TAB coordination meeting to review the TAB Plan with the project team. <br /> Witness contractor procedures in the field. <br /> Confirm minimum OA flow rates. <br /> Randomly sample up to 10% of TAB values in the field at the conclusion of TAB work. <br /> Review the completed TAB report. <br />Scope and Fee KFI #P22-0559 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.