Laserfiche WebLink
Tar <br />Elk River F re 3�ion #3 <br />EIk Rid Fire Station <br />Terra <br />Ci of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 111-121111 <br />AIA Dow ment G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION N0: 14 <br />Contactor', signed-ifiwtion is attached. APPLICATION DATE: 3/31/22 <br />In tabu htion, below, amount, are stated to the new rest doll.r. PERIODTO 3/31/22 <br />Use Column I on Cont,- where variable mtainage for line items may apply. <br />A <br />I A.1 <br />B <br />C <br />C1 <br />C2 <br />C3 <br />D <br />E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G=C) <br />TO FINISH <br />(IFVARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C-G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />DOR E) <br />(D+E+F) <br />Distinctive Iron <br />OS-5120 <br />SA <br />C0N1Salvaged Steel Bollards <br />$ - <br />$ - <br />$ (1,232.00) <br />$ (1,232.00) <br />$ (1,232.00) <br />$ (1,232.00) <br />100.00% <br />$ - <br />$ (61.60; <br />Distinctive Iron <br />0S-5120 <br />SA <br />CONIncreased RTU Loads <br />$ - <br />$ - <br />$ 1,305.28 <br />$ 1,305.28 <br />$ 1,305.28 <br />$ 1,305.28 <br />100.00% <br />$ - <br />$ 65.26 <br />Distinctive Iron <br />05-5120 <br />5A <br />CON3 RFIN54W8 Beam Connection, <br />$ - <br />$ - <br />$ 1,406.22 <br />$ 1,406.22 <br />$ 1,406.22 <br />$ 1,406.22 <br />100.00% <br />$ - <br />$ 70.31 <br />Distinctive Iron <br />05-5120 <br />5A <br />CON4 RFIN46Trench Dwin Gates <br />$ - <br />$ - <br />$ 415.34 <br />$ 415.34 <br />$ 415.34 <br />$ 415.34 <br />100.00% <br />$ - <br />$ 20.77 <br />Disci nctive Iron <br />05-5120 <br />5A <br />CON5 Pmdrilling Sill Angles for Century to Install <br />$ - <br />$ - <br />$ 676.41 <br />$ 676.41 <br />$ 676.41 <br />$ 676.41 <br />100.00% <br />$ - <br />$ 33.82 <br />Distinctive Iron <br />05-5120 <br />5A <br />CON6 RFIN69 Removal of6x4x1/4" Angle At OR ADD Doors <br />$ - <br />$ - <br />$ (2,038.93) <br />$ (2,038.93) <br />$ (2,038.93) <br />$ (2,038.93) <br />100.00% <br />$ - <br />$ (101.95) <br />Distinctive Iron <br />05-5120 <br />5A <br />CON7ASIN8R Roof ,-Rion, <br />$ - <br />$ - <br />$ 6,193.52 <br />$ 6,193.52 <br />$ 6,193.52 <br />$ 6,193.52 <br />100.00% <br />$ - <br />$ 309.68 <br />Distinctive Iron <br />05-5120 <br />5A <br />CON8 DI Pre Drilling <br />468.54 <br />$ 468.54 <br />$ 468.54 <br />$ 468.54 <br />100.00% <br />$ - <br />$ 23.43 <br />Distinctive Iron <br />05-5120 <br />5A <br />CON9 CORN37 Added 2 Loose Lintel, <br />$ - <br />$ - <br />$ 5 12 .65 <br />$ 512.65 <br />$ 512.65 <br />$ 512.65 <br />100.00% <br />$ - <br />$ 25.63 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#10 CORN3811Added Steel <br />3,702.44 <br />$ 3,702.44 <br />$ 3,702.44 <br />$ 3,702.44 <br />100.00% <br />$ - <br />$ 185.12 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#11 RFIN103Angle, Above W1 Windows <br />$ - <br />$ - <br />$ 1,061.67 <br />$ 1,062.67 <br />$ 1,062.67 <br />$ 1,062.67 <br />100.00% <br />$ - <br />$ 53.13 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#12 RFIN109 <br />$ - <br />$ - <br />$ (212.00) <br />$ (212.00) <br />$ (212.00) <br />$ (212.00) <br />100.00% <br />$ - <br />$ (10.60) <br />Distinctive Iron <br />05-5120 <br />5A <br />CON13 RFIN100 <br />$ - <br />$ - <br />$ 2,775.64 <br />$ 2,775.64 <br />$ - <br />$ - <br />0.00% <br />$ 2,775.64 <br />$ - <br />Distinctivelron <br />05-5120 <br />5A <br />CON14 Repl--nt MC6x12 <br />$ - <br />$ - <br />$ 2,135.02 <br />$ 2,135.02 <br />$ 2,135.02 <br />$ 2,135.02 <br />100.00% <br />$ - <br />$ 106.75 <br />Distinctive Iron <br />05-5120 <br />5A <br />CON15 Suppoafor P3 At ADD Bay <br />$ - <br />$ - <br />$ (212.00) <br />$ (212.00) <br />$ - <br />$ - <br />0.00% <br />$ (212.00) <br />$ - <br />Distinctive Iron <br />05-5120 <br />5A <br />CON16 RFIN156Angle Iron Material <br />$ - <br />$ - <br />$ 1,203.29 <br />$ 1,203.29 <br />$ - <br />$ - <br />0.00% <br />$ 1,203.29 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />Stmctual Steel Erection <br />$ 58,000.00 <br />$ - <br />$ - <br />$ 58,000.00 <br />$ 58,000.00 <br />$ 58,000.00 <br />100.00% <br />$ - <br />$ 2,900.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />1oi-&Decking <br />$ 29,575.00 <br />$ - <br />$ - <br />$ 29,575.00 <br />$ 29,575.00 <br />$ 29,575.00 <br />100.00% <br />$ - <br />$ 1,478.75 <br />Patriot Erectors <br />05-5121 <br />5B <br />Metal Fabrication, <br />$ 26,175.00 <br />$ - <br />$ - <br />$ 26,175.00 <br />$ 22,800.00 <br />$ 2,375.00 <br />$ 25,175.00 <br />96.18% <br />$ 1,000.00 <br />$ 1,258.75 <br />Patriot Erector, <br />05-5121 <br />5B <br />Bond <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />100.00% <br />$ - <br />$ 200.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#1 PRN2R Clerestory Head Detail <br />$ - <br />$ - <br />$ 6,784.00 <br />$ 6,784.00 <br />$ 6,784.00 <br />$ 6,784.00 <br />100.00% <br />$ - <br />$ 339.20 <br />Patriot Erectors <br />05-5121 <br />5B <br />CON2 LT GA 3.3 Cavity Closure Angle Install <br />$ - <br />$ - <br />$ 1,272.00 <br />$ 1,272.00 <br />$ 1,272.00 <br />$ 1,272.00 <br />100.00% <br />$ - <br />$ 63.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />CON3 RFIN69 Removal of a ngle at ADD Doors <br />$ - <br />$ - <br />$ (1,060.00) <br />$ (1,060.00) <br />$ (1,060.00) <br />$ (1,060.00) <br />100.00% <br />$ - <br />$ (53.00) <br />Patriot Erectors <br />05-5121 <br />5B <br />CON4ASIN8R Roof ,-Rion <br />$ - <br />$ - <br />$ 530.00 <br />$ 530.00 <br />$ 530.00 <br />$ 530.00 <br />100.00% <br />$ - <br />$ 26.50 <br />Patriot Erectors <br />05-5121 <br />5B <br />CON5 RFIN92 SIab Edge Detail at Mezzanine Opening <br />$ - <br />$ - <br />$ 230.00 <br />$ 230.00 <br />$ 230.00 <br />$ 230.00 <br />100.00% <br />$ - <br />$ 11.50 <br />Patriot Erectors <br />05-5121 <br />5B <br />CON6 PRN16 <br />$ - <br />$ - <br />$ 477.00 <br />$ 477.00 <br />$ 477.00 <br />$ 477.00 <br />100.00% <br />$ - <br />$ 23.85 <br />Patriot Erectors <br />05-5121 <br />5B <br />CON7 RFIN103 Angles Above W1 Windows <br />$ - <br />$ - <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />100.00% <br />$ - <br />$ 21.20 <br />Patriot Erectors <br />05-5121 <br />5B <br />CON8 RFIN109 <br />$ - <br />$ - <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />100.00% <br />$ - <br />$ 10.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />CON9 RFIN100 <br />$ - <br />$ - <br />$ 742.00 <br />$ 742.00 <br />$ 742.00 <br />$ 742.00 <br />100.00% <br />$ - <br />$ 37.10 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#10 ELI #101 <br />$ - <br />$ - <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />100.00% <br />$ - <br />$ 10.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#11 RFIN156 Additional Angle Iron for Fan <br />$ - <br />$ - <br />$ 1,612.00 <br />$ 1,612.00 <br />$ 1,612.00 <br />$ 1,612.00 <br />100.00% <br />$ - <br />$ 80.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#12 RFIN159 Twining Tower Welding <br />$ - <br />$ - <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />100.00% <br />$ - <br />$ 21.20 <br />Patriot Erectors <br />05-5121 <br />5B <br />CONI3 RFIN140 Rap0ing Anchors <br />$ - <br />$ - <br />$ 1,219.00 <br />$ 1,219.00 <br />$ - <br />$ 1,219.00 <br />$ 1,219.00 <br />100.00% <br />$ - <br />$ 60.95 <br />Century Con -action <br />06-6100 <br />6A <br />Performance&Payment Bond <br />$ 6,400.00 <br />$ - <br />$ - <br />$ 6,400.00 <br />$ 6,400.00 <br />$ 6,400.00 <br />100.00% <br />$ - <br />$ 320.00 <br />Centu ry Con -action <br />06-6100 <br />6A <br />Allowance <br />$ 10,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ 2,982.00 <br />$ 3,087.50 <br />$ 6,069.50 <br />60.70% <br />$ 3,930.50 <br />$ 303.48 <br />Century Con -action <br />06-6100 <br />6A <br />Mobilization <br />$ 3,100.00 <br />$ - <br />$ - <br />$ 3,100.00 <br />$ 1,395.00 <br />$ 775.00 <br />$ 2,170.00 <br />70.00% <br />$ 930.00 <br />$ 108.50 <br />Centu ry Con -action <br />06-6100 <br />6A <br />Ma mik <br />$ 97,000.00 <br />$ - <br />$ - <br />$ 97,000.00 <br />$ 41,048.00 <br />$ 17,460.00 <br />$ 58,508.00 <br />60.32% <br />$ 38,492.00 <br />$ 2,925.40 <br />Century Con -action <br />06-6100 <br />6A <br />Material Blocking <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,000.00 <br />$ 12,000.00 <br />$ 12,000.00 <br />100.00% <br />$ - <br />$ 600.00 <br />Centu ry Con -action <br />06-6100 <br />6A <br />Install Roof Blocking <br />$ 43,000.00 <br />$ - <br />$ - <br />$ 43,000.00 <br />$ 43,000.00 <br />$ 43,000.00 <br />100.00% <br />$ - <br />$ 2,150.00 <br />Century Con-uction <br />06-6100 <br />6A <br />In-11 In Wall Blocking <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />100.00% <br />$ - <br />$ 400.00 <br />Centu ry Con -action <br />06-6100 <br />6A <br />Cabin -and Millwork <br />$ 8,500.00 <br />$ - <br />$ - <br />$ 8,500.00 <br />$ - <br />$ 8,500.00 <br />$ 8,500.00 <br />100.00% <br />$ - <br />$ 425.00 <br />Century Con -action <br />06-6100 <br />6A <br />Spe Wtie, <br />$ 32,000.00 <br />$ - <br />$ - <br />$ 32,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 32,000.00 <br />$ - <br />CenturyCon-action <br />06-6100 <br />6A <br />Temp Enclosures <br />$ 6,000.00 <br />$ - <br />$ - <br />$ 6,000.00 <br />$ 6,000.00 <br />$ 6,000.00 <br />100.00% <br />$ - <br />$ 300.00 <br />Century Con -action <br />06-6100 <br />6A <br />Doors&Hardware <br />$ 17,000.00 <br />$ - <br />$ - <br />$ 17,000.00 <br />$ - <br />$ 17,000.00 <br />$ 17,000.00 <br />100.00% <br />$ - <br />$ 850.00 <br />Centu ry Con -action <br />06-6100 <br />6A <br />CON1 For Ditinctive to Predrill Sill Angles <br />$ - <br />$ - <br />$ (676.41) <br />$ (676.41) <br />$ (676.41) <br />$ (676.41) <br />100.00% <br />$ - <br />$ (33.82) <br />Century Con -action <br />06-6100 <br />6A <br />CON2 PRN15 Flagpoles <br />$ - <br />$ - <br />$ (277.00) <br />$ (277.00) <br />$ (277.00) <br />$ (277.00) <br />100.00% <br />$ - <br />$ (13.85) <br />Centu ry Con -action <br />06-6100 <br />6A <br />CON3Di,ainctive Predrill Holes for Opewble Partition <br />$ - <br />$ - <br />$ (468.54) <br />$ (468.54) <br />$ (468.54) <br />$ (468.54) <br />100.00% <br />$ - <br />$ (23.43) <br />Century Con -action <br />06-6100 <br />6A <br />CON4 Wood Blocking at Head, of W1(Uwd$855 of Allowance) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />NDIV/01- <br />CenturyCon-action <br />06-6100 <br />6A <br />CON5 RFIN110 Wood Blocking <br />$ - <br />$ - <br />$ 534.35 <br />$ 534.35 <br />$ 534.35 <br />$ 534.35 <br />100.00% <br />$ - <br />$ 26.72 <br />Century Con -action <br />06-6100 <br />6A <br />CON6 Allowance U,age(Remaining$8,290) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />NDIV/01- <br />CenturyCon-action <br />06-6100 <br />6A <br />CON7 Allowance U,age(Remaining$7,018) <br />$ - <br />$ - <br />$ (1,272.00) <br />$ (1,272.00) <br />$ (1,272.00) <br />$ (1,272.00) <br />100.00% <br />$ - <br />$ (63.60) <br />Century Con -action <br />06-6100 <br />6A <br />CON8 PRN18Added Paper Towel/T-h Unrt, <br />$ - <br />$ - <br />$ 2,248.00 <br />$ 2,248.00 <br />$ 2,248.00 <br />$ 2,248.00 <br />100.00% <br />$ - <br />$ 112.40 <br />Centu ry Con-uction <br />06-6100 <br />6A <br />00#9 CSI Div-IOAdditionel Charges <br />$ - <br />$ - <br />$ 2,335.50 <br />$ 2,335.50 <br />$ - <br />$ 87.50 <br />$ 87.50 <br />3.75% <br />$ 2,248.00 <br />$ 4.38 <br />Century Con -action <br />06-6100 <br />6A <br />CON101nterior Signage <br />$ - <br />$ - <br />$ (572.82) <br />$ (572.82) <br />$ - <br />$ (572.82) <br />$ (572.82) <br />100.00% <br />$ - <br />$ (28.64) <br />Centu ry Con-uction <br />06-6100 <br />6A <br />CO#11 Allowance U,gage(Remaining$3930.50) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />NDIV/01 <br />$ - <br />$ - <br />Northern Woodwork <br />06-6400 <br />6B <br />Architectural Millwork <br />$ 45,900.00 <br />$ - <br />$ - <br />$ 45,900.00 <br />$ 17,917.64 <br />$ 17,917.64 <br />39.04% <br />$ 27,982.36 <br />$ 895.88 <br />Page 2 / 8 <br />