Laserfiche WebLink
Tar <br />Elk River F re 3�ion #3 <br />EIk Rid Fire Station <br />Terra <br />Ci of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 111-121111 <br />AIA Dow sent G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION N0: 14 <br />Contactor', signed-ifiwtion is attached. APPLICATION DATE: 3/31/22 <br />In tabu htion, below, annou- are stated to the new rest doll.r. PERIODTO 3/31/22 <br />Use Column I on Contact, where variable retainage for line items may apply. <br />A <br />I A.1 <br />B <br />C <br />C1 <br />C2 <br />C3 <br />D <br />E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G=C) <br />TO FINISH <br />(IFVARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />DOR E) <br />(D+E+F) <br />Northern Woodwork <br />06-6400 <br />6B <br />CO#1 PRfi18 <br />$ - <br />$ - <br />$ 165.00 <br />$ 165.00 <br />$ 165.00 <br />$ 165.00 <br />100.00% <br />$ - <br />$ 8.25 <br />Quality Coating, <br />07-7210 <br />7C <br />Fluid Applied Air Barrier <br />$ 38,600.00 <br />$ - <br />$ - <br />$ 38,600.00 <br />$ 38,600.00 <br />$ 38,600.00 <br />100.00% <br />$ - <br />$ 1,930.00 <br />Quality Coating, <br />07-7210 <br />7C <br />CO#1ASlff8R Removal of Tani,ition Meabwne <br />$ - <br />$ - <br />$ (800.00) <br />$ (800.00) <br />$ (800.00) <br />$ (800.00) <br />100.00% <br />$ - <br />$ (40.00) <br />Quality Coating, <br />07-7210 <br />7C <br />Reaovea nd Reinstall AB at Wl <br />$ - <br />$ - <br />$ 1,590.00 <br />$ 1,590.00 <br />$ 1,590.00 <br />$ 1,590.00 <br />100.00% <br />$ - <br />$ 79.50 <br />Quality Coating, <br />07-7210 <br />7C <br />COff3 PRN20 <br />$ - <br />$ - <br />$ (200.00) <br />$ (200.00) <br />$ - <br />$ - <br />0.00% <br />$ (200.00) <br />$ - <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />Roofing& Metal Wall Panel, <br />$ 385,124.00 <br />$ - <br />$ - <br />$ 385,124.00 <br />$ 280,179.20 <br />$ 52,168.60 <br />$ 332,347.80 <br />86.30% <br />$ 52,776.20 <br />$ 16,617.39 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />CONIASIN5 LTAngles <br />$ - <br />$ - <br />$ 5,750.00 <br />$ 5,750.00 <br />$ 5,750.00 <br />$ 5,750.00 <br />100.00% <br />$ - <br />$ 287.50 <br />Horizon Roofing <br />07-7520 <br />7A &7B <br />CON2ASIN8R Reduction of Roof Membane <br />$ - <br />$ - <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />100.00% <br />$ - <br />$ 130.00 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />COff3 PRfi14 Pawpet Roofing Membane <br />$ - <br />$ - <br />$ (1,650.00) <br />$ (1,650.00) <br />$ (1,650.00) <br />$ (1,650.00) <br />100.00% <br />$ - <br />$ (82.50) <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />COff40vertiae Work on 11/6 <br />$ - <br />$ - <br />$ 2,682.00 <br />$ 2,682.00 <br />$ 2,682.00 <br />$ 2,682.00 <br />100.00% <br />$ - <br />$ 134.10 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />COff5 RFIfi100 <br />$ - <br />$ - <br />$ 1,350.00 <br />$ 1,350.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,350.00 <br />$ - <br />Hori-Roofing <br />07-7520 <br />7A&7B <br />COff64th Floor Twining Tower Roofing Membane <br />$ - <br />$ - <br />$ (935.00) <br />$ (935.00) <br />$ - <br />$ - <br />0.00% <br />$ (935.00) <br />$ <br />Spec7 <br />07-7520 <br />RFIfi163 Twining Tower Roofing Meabwne <br />$ - <br />$ 5,513.00 <br />$ 5,513.00 <br />$ 5,513.00 <br />$ 5,513.00 <br />100.00% <br />$ - <br />$ 275.65 <br />Su nri,e Speciality <br />07-7900 <br />7D <br />Joint Sealant, <br />$ 45,470.00 <br />$ - <br />$ - <br />$ 45,470.00 <br />$ 22,735.00 <br />$ 22,735.00 <br />50.00% <br />$ 22,735.00 <br />$ 1,136.75 <br />Sunrise Speciality <br />07-7900 <br />7D <br />CONIPRN2RCI-.ory Head Detail <br />$ - <br />$ - <br />$ 35.00 <br />$ 35.00 <br />$ - <br />$ - <br />0.00% <br />$ 35.00 <br />$ - <br />Mid{entwl Door <br />08-8200 <br />8A <br />Hardware <br />$ 41,653.67 <br />$ - <br />$ - <br />$ 41,653.67 <br />$ 24,041.51 <br />$ 24,041.51 <br />57.72% <br />$ 17,612.16 <br />$ 1,202.08 <br />Mid{entwl Door <br />08-8200 <br />8A <br />HIM Door <br />$ 22,208.67 <br />$ - <br />$ - <br />$ 22,208.67 <br />$ 22,208.67 <br />$ 22,208.67 <br />100.00% <br />$ - <br />$ 1,110.43 <br />Mid{entwl Door <br />08-8200 <br />8A <br />HIM Fwae <br />$ 19,666.66 <br />$ - <br />$ - <br />$ 19,666.66 <br />$ 19,666.66 <br />$ 19,666.66 <br />100.00% <br />$ - <br />$ 983.33 <br />Mid{entwl Door <br />08-8200 <br />8A <br />Specialty <br />$ 3,133.00 <br />$ - <br />$ - <br />$ 3,133.00 <br />$ 3,133.00 <br />$ 3,133.00 <br />100.00% <br />$ - <br />$ 156.65 <br />Mid -Central Door <br />08-8200 <br />8A <br />WD Door <br />$ 7,727.00 <br />$ - <br />$ - <br />$ 7,727.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,727.00 <br />$ - <br />Mid{entwl Door <br />08-8200 <br />8A <br />CO#1 Door Hardware Revi,ion,(5/5/21) <br />$ - <br />$ - <br />$ 2,152.97 <br />$ 2,152.97 <br />$ 2,152.97 <br />$ 2,152.97 <br />100.00% <br />$ - <br />$ 107.65 <br />Aaeriwn Door Work, <br />08-8361 <br />8B <br />Sectional Overhead Doors <br />$ 170,570.00 <br />$ - <br />$ - <br />$ 170,570.00 <br />$ - <br />$ - <br />0.00% <br />$ 170,570.00 <br />$ - <br />AunoianDoorWork, <br />08-8361 <br />8B <br />CO#1 PRN20verhead Doors&Cirwrting <br />$ - <br />$ - <br />$ (37,217.00) <br />$ (37,217.00) <br />$ - <br />$ - <br />0.00% <br />$ (37,217.00) <br />$ - <br />AaeriwnDoorWork, <br />08-8361 <br />8B <br />CON2 PRfi12 Revised the 3 OR Doors <br />$ - <br />$ - <br />$ (36,410.00) <br />$ (36,410.00) <br />$ - <br />$ - <br />0.00% <br />$ (36,410.00) <br />$ - <br />Hallmark Glass <br />08-8800 <br />8C <br />Shop Dwwings <br />$ 3,500.00 <br />$ - <br />$ - <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />100.00% <br />$ - <br />$ 175.00 <br />Hallmark Glass <br />088800 <br />8C <br />Bond <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />100.00% <br />$ - <br />$ 250.00 <br />Ha llmark Glass <br />08-8800 <br />8C <br />Aluminum Labor <br />$ 32,630.00 <br />$ - <br />$ - <br />$ 32,630.00 <br />$ 31,600.00 <br />$ 1,030.00 <br />$ 32,630.00 <br />100.00% <br />$ - <br />$ 1,631.50 <br />Hallmark Glass <br />088800 <br />8C <br />Aluminum Material <br />$ 48,750.00 <br />$ - <br />$ - <br />$ 48,750.00 <br />$ 48,750.00 <br />$ 48,750.00 <br />100.00% <br />$ - <br />$ 2,437.50 <br />Hallmark Glass <br />08-8800 <br />8C <br />Door Hardware tabor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ - <br />$ 3,000.00 <br />$ 3,000.00 <br />100.00% <br />$ - <br />$ 150.00 <br />Ha llmark Glass <br />088800 <br />8C <br />Door Hardware nn.- l <br />$ 26,000.00 <br />$ - <br />$ - <br />$ 26,000.00 <br />$ 26,000.00 <br />$ 26,000.00 <br />100.00% <br />$ - <br />$ 1,300.00 <br />Ha llmark Glass <br />088800 <br />8C <br />Glass&Glazing La bor <br />$ 10,200.00 <br />$ - <br />$ - <br />$ 10,200.00 <br />$ 9,200.00 <br />$ 9:200.00 <br />90.20% <br />$ 1,000.00 <br />$ 460.00 <br />Ha llmark Glass <br />088800 <br />8C <br />Glass& Glazing Material <br />$ 29,000.00 <br />$ - <br />$ - <br />$ 29,000.00 <br />$ 29,000.00 <br />$ 29,000.00 <br />100.00% <br />$ - <br />$ 1,450.00 <br />Ha llmark Glass <br />088800 <br />8C <br />Arch Louvers Labor <br />$ 1,620.00 <br />$ - <br />$ - <br />$ 1,620.00 <br />$ - <br />$ 1,620.00 <br />$ 1,620.00 <br />100.00% <br />$ - <br />$ 81.00 <br />Ha llmark Glass <br />088800 <br />8C <br />Arch Louvers Material <br />$ 3,800.00 <br />$ - <br />$ - <br />$ 3,800.00 <br />$ 3,800.00 <br />$ 3,100.00 <br />100.00% <br />$ - <br />$ 190.00 <br />Ha llmark Glass <br />08-8800 <br />8C <br />CO#1 RFlfi181 SF 140X SF Head Detail <br />$ - <br />$ - <br />$ 362.00 <br />$ 362.00 <br />$ - <br />$ 362.00 <br />$ 36.00 <br />100.00% <br />$ - <br />$ 18.10 <br />Niemela Design a nd Consftuction <br />09-9250 <br />9A <br />Fwming- Material <br />$ 19,873.00 <br />$ - <br />$ - <br />$ 19,873.00 <br />$ 19,873.00 <br />$ 19,873.00 <br />100.00% <br />$ - <br />$ 993.65 <br />Niemela Design and Consftuction <br />09-9250 <br />9A <br />Insulation - Materal <br />$ 5,063.00 <br />$ - <br />$ - <br />$ 5,063.00 <br />$ 5,063.00 <br />$ 5,063.00 <br />100.00% <br />$ - <br />$ 253.15 <br />Niemela Design a nd Consftuction <br />09-9250 <br />9A <br />Drywall - Material <br />$ 20,024.00 <br />$ - <br />$ - <br />$ 20,024.00 <br />$ 20,024.00 <br />$ 20,024.00 <br />100.00% <br />$ - <br />$ 1,OOL20 <br />Niemela Design and Consftuction <br />09-9250 <br />9A <br />Taping/Finki-ing- Materal <br />$ 2,930.00 <br />$ - <br />$ - <br />$ 2,930.00 <br />$ 2,930.00 <br />$ 2,930.00 <br />100.00% <br />$ - <br />$ 146.50 <br />Niemela Design a nd Consftuction <br />09-9250 <br />9A <br />Sealants/Acoustical-Materal <br />$ 2,500.00 <br />$ - <br />$ - <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />100.00% <br />$ - <br />$ 125.00 <br />Niemela Design and Consftuction <br />09-9250 <br />9A <br />FRP- Material <br />$ 806.00 <br />$ - <br />$ - <br />$ 806.00 <br />$ 806.00 <br />$ 806.00 <br />100.00% <br />$ - <br />$ 40.30 <br />Niemela Design a nd Consftuction <br />09-9250 <br />9A <br />Fwming-tabor <br />$ 33,795.00 <br />$ - <br />$ - <br />$ 33,795.00 <br />$ 33,795.00 <br />$ 33,795.00 <br />100.00% <br />$ - <br />$ 1,689.75 <br />Niemela Design and Consftuction <br />09-9250 <br />9A <br />Insulation -Labor <br />$ 6,500.00 <br />$ - <br />$ - <br />$ 6,500.00 <br />$ 6,500.00 <br />$ 6,500.00 <br />100.00% <br />$ - <br />$ 325.00 <br />Niemela Design a nd Consftuction <br />09-9250 <br />9A <br />Drywall -Labor <br />$ 22,810.00 <br />$ - <br />$ - <br />$ 22,810.00 <br />$ 22,710.00 <br />$ 22,710.00 <br />99.56% <br />$ 100.00 <br />$ 1,135.50 <br />Niemela Design a nd Consftuction <br />09-9250 <br />9A <br />Taping/Finki-ing-Labor <br />$ 23,301.00 <br />$ - <br />$ - <br />$ 23,301.00 <br />$ 23,151.00 <br />$ 23,151.00 <br />99.36% <br />$ 150.00 <br />$ 1,157.55 <br />Niemela Design a nd Consftuction <br />09-9250 <br />9A <br />Sealants/Acoustical-tabor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />100.00% <br />$ - <br />$ 150.00 <br />Niemela Design a nd Con --ion <br />09-9250 <br />9A <br />FRP-Labor <br />$ 630.00 <br />$ - <br />$ - <br />$ 630.00 <br />$ 630.00 <br />$ 630.00 <br />100.00% <br />$ - <br />$ 31.50 <br />Niemela Design a nd Constructio n <br />09-9250 <br />9A <br />Equipment - Lift <br />$ 7,500.00 <br />$ - <br />$ - <br />$ 7,500.00 <br />$ 7,500.00 <br />$ 7,500.00 <br />100.00% <br />$ - <br />$ 375.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Mobilization <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />100.00% <br />$ - <br />$ 250.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Bonding <br />$ 2,915.00 <br />$ - <br />$ - <br />$ 2,915.00 <br />$ 2,915.00 <br />$ 2,915.00 <br />100.00% <br />$ - <br />$ 145.75 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Allowance (Terra Directed) <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 5,000.00 <br />$ - <br />NieaelaDesignandConstruction <br />09-9250 <br />9A <br />Allowance -Access Panels <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,000.00 <br />$ - <br />Page 3 / 8 <br />