Laserfiche WebLink
<br />RESOLUTION 05- <br /> <br />A RESOLUTION FOR THE CITY OF ELK RIVER <br /> <br />A RESOLUTION ORDERING THE PREPARATION OF PLANS <br />AND SPECIFICATIONS IN THE MATTER OF THE SCHOOL STREET /HIGH SCHOOL <br />PARKING LOT SIGNALIZATION IMPROVEMENT OF 2005 <br /> <br />\VHEREAS it has been determined that signalizing the :High School parking lot intersection with School <br />Street is a priority; and <br /> <br />\VHEREAS signalization should provide for a safer transportation environment especially at periods of <br />peak traffic flow; <br /> <br />NOW, THEREFORE, BE IT RESOLVED by the Gty Council of the City of Elk River, Minnesota: <br /> <br />1. Terry Maurer, City Engineer is hereby designated as Project Engineer for this improvement. The <br />Project Engineer is directed to prepare plans and specifications for the making of the improvement <br />and the solicitation of competitive bids. <br /> <br />Passed and adopted this 19th day of September, 2005. <br /> <br />Stephanie A. Klinzing, Mayor <br /> <br />ATTEST: <br /> <br />J oan M~ Schmidt, City Clerk <br /> <br />S:\EngineerImprovProj\2005 Improvement Projects\Schoo1 St Signalization\Resolu prep plans&specs.doc <br />