My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.8. SR 09-19-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
09/19/2005
>
6.8. SR 09-19-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:31 AM
Creation date
9/16/2005 9:32:56 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/19/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />School StreetlHigh School Drive Signalization <br />September 13, 2005 <br /> <br />Page 2 <br /> <br />consideration and direction to staff, followed by the design of a signal system based on the <br />selected lane configuration. As with previous signal projects, this work could be completed <br />during the fall of the year with a contract being let and wire and concrete bases installed <br />prior to the onset of winter. Due to the delays typically experienced in receiving signal mast <br />arms and controller cabinets to the site, it would likely be later in the winter months that the <br />equipment would be available and could be installed and signal operations instituted. <br /> <br />It is my understanding that you have had preliminary discussions with the School District <br />about participating in the funding of a signal system at this intersection. Through the <br />preliminary discussions, I believe that they have been open to the idea of the School District <br />paying half of the cost with the City funding the remaining cost. Attached for the City <br />Council's consideration is a resolution which would order the preparation of plans and <br />specifications. It is implied that this would also include the traffic data collection and lane <br />configuration analysis prior to proceeding to final design of the signal layout. <br /> <br />If you have any questions regarding this project, please call. <br /> <br />Sincerely, <br /> <br />~pt~ <br /> <br />Terry J. Maurer, PE <br />City Engineer <br /> <br />Cc: Dr. Jenson, District #728 <br />Jeff Beahen, Police Chief <br /> <br />S:\EngineerImprovProj\200S Improvement Projecrs\School St Signalization\09 13 05 cc merno.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.