My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. PCSR 03-22-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2022
>
03-22-2022
>
8.2. PCSR 03-22-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 11:27:44 AM
Creation date
3/18/2022 11:24:59 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />13065 Orono Parkway <br />Elk River, MN 55330 <br />763.635.1000 <br /> ElkRiverMN.gov <br /> <br />March 18, 2022 <br /> <br />US Home, LLC <br />Paul Tabone <br />16305 36th Ave N, Suite 600 <br />Plymouth, MN 55446 <br /> <br />Dear Mr. Tabone: <br /> <br />Thank you for your applications for concept review. City staff along with outside agencies have <br />completed a review of the initial submittal and have the following comments. Please incorporate these <br />comments, along with those received during work session discussions, into future submittals. <br /> <br />General Comments <br />1. The property will need to be developed as a Planned Unit Development to support the housing mix and <br />types proposed in the concept plan. This includes a zone change, conditional use permit, and preliminary <br />plat application. <br />2. Consider reducing the number of cul-de-sacs constructed as part of this project. <br />3. The “knuckle” or “eyebrow” cul-de-sac in the southwest corner must be modified as a standard cul-de- <br />sac or a removed entirely. <br />4. The extension of Ivanhoe should loop back to CR 40 instead of turning into a cul-de-sac. That street has <br />always been considered the main loop through Miske Meadows and even has the dual sidewalk. It makes <br />sense for this to connect directly to CR 40 to finish the main loop. <br />5. A trail will be required along the west side of Cleveland/CR 40. <br />6. The park and recreation commission will discuss trails and park dedication in more detail during a work <br />session on April 13, 2022. <br />7. The wetland delineation was approved for this site in 2021 however no wetland impacts have been <br />applied for at this time. The proposal shows significant fill. I strongly encourage the applicant to schedule <br />a pre-application meeting to discuss proposed wetland impacts for the entire site with the Wetland <br />Conservation Act (WCA) Technical Evaluation Panel (TEP). This would include staff from BWSR, the <br />DNR, Sherburne SWCD and could also include US Army Corps of Engineers (USACE). The proposal <br />shows significant wetland impacts and their application will need to illustrate a strong need for those <br />impacts, sequencing and mitigation plans. I would be willing to organize this meeting as well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.