™ <br />Document G701 – 2017 <br />Change Order <br />PROJECT:(Name and address)CONTRACT INFORMATION:CHANGE ORDER INFORMATION: <br />108820 Elk River Municipal Utilities - Contract For: Construction Manager at Change Order Number: 004 <br />Field Services BuildingRisk <br />Elk RiverDate: January 12, 2021Date: February 28, 2022 <br />OWNER:(Name and address)ARCHITECT:(Name and address)CONTRACTOR:(Name and address) <br />Elk River Municipal UtilitiesKodet Architectural Group LtdRJM Construction <br />1705 Main St.15 Groveland Terrace830 Boone Avenue North <br />Minneapolis, MN 55403Golden Valley, MN 55427 <br />Elk River, MN 55330 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives.) <br />PCO Owner-12 (PR-008) Add garbage disposal in lunchroom = $2,449.62. <br />PCO Owner-17 (PR-009) Added sleeves for irrigation system = $7,324.33. <br />PCO Owner-18 (PR-010) Added sleeves for future electrical needs = $4,703.05. <br />PCO Owner-19 (PR011) Light pole changes = $4,881.29. <br />PCO Owner-20 (PR012) Reduction in bollards credit = ($9,930.58). <br />PCO Owner-30 Reduction in scope of the motorized blinds credit = ($1,401.54). <br />PCO Owner-32 Cable railing credit = ($15,515.13). <br />Total = credit ($7,488.96) <br />The original Guaranteed Maximum Price was $12,180,926.00 <br />The net change by previously authorized Change Orders$24,724.74 <br />The Guaranteed Maximum Price prior to this Change Order was$12,205,650.74 <br />The Guaranteed Maximum Price will be decreased by this Change Order in the amount of$7,488.96 <br />The new Guaranteed Maximum Priceincluding this Change Order will be$12,198,161.78 <br />The Contract Time will be unchanged by Zero (0) days. <br />The new date of Substantial Completion will be 8/12/22 <br />NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Kodet Architectural Group LtdRJM ConstructionElk River Municipal Utilities <br />ARCHITECTARCHHHHHHHHHHHHHHHHHHHHHHHHHHHITTTECEEEEEEEEEEEEEEEEET(Firm name)(Firmname)CONTRACTOR(Firm name)OWNER(Firm name) <br />SIGNATURESIGNATURESIGNATURE <br />Edward Daniel Kodet III, AIA Theresa Slominski <br />PRINTED NAME AND TITLEPRINTED NAME AND TITLEPRINTED NAME AND TITLE <br />03/01/2022 <br />DATEDATEDATE <br />™ <br />AIA Document G701 – 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The “American <br />Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document <br />1 <br />was produced by AIA software at 14:31:08 ET on 02/28/2022 under Order No.6631446434 which expires on 08/13/2022, is not for resale, is licensed for one-time <br />® <br />use only, and may only be used in accordance with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes:(3B9ADA48) <br />207 <br />