Laserfiche WebLink
05,5121 <br />5B <br />CDUS PRUIJ <br />$ - <br />$ - <br />$ 2,71256 <br />$ 2,712.56 <br />$ 2,712.56 <br />$ 2,712.56 <br />100.00% <br />$ - <br />$ 1-1 <br />05-5121 <br />5B <br />C089 RFIU101 <br />$ - <br />$ - <br />$ 412.76 <br />$ 412.76 <br />$ 412.76 <br />$ 412.J6 <br />100.00% <br />20.61 <br />OS-5121 <br />5B <br />COU10 Field Fab Shim Plates at GL P/1&P/3 <br />$ - <br />$ - <br />$ 309.5J <br />$ 309.5J <br />$ -5J <br />$ 309.5J <br />100.00" <br />15.48 <br />o-121 <br />5B <br />CM 1 Narrow Trash Enclosure Gate <br />$ - <br />$ - <br />$ fi19.14 <br />$ 0.14 <br />$ - <br />$ ON 14 <br />$ 6-1 <br />100.00% <br />$ - <br />$ 30.11 <br />0-21 <br />5B <br />'CO 2Addto Field Weld Rappelling Anchors RFIU201 <br />$ - <br />$ - <br />$ 855A0 <br />$ 855.40 <br />$ - <br />$ 855.40 <br />$ 855.40 <br />11.1 <br />$ - <br />$ 42.77 <br />o-121 <br />5B <br />-13T&Mrolnstall Sheet Metal at Trash Enclosure doe to galvanized nuts <br />$ - <br />$ - <br />$ :35.40 <br />$ fi35.40 <br />$ - <br />$ 635.40 <br />$ 635.40 <br />1...,% <br />$ - <br />$ 31.77 <br />0G6100 <br />6A <br />Area A FD Addition Envelop <br />$ 11,000.00 <br />$ - <br />$ - <br />$ 11,000.00 <br />$ 11,000.00 <br />$ 11,000.00 <br />100.00% <br />$ - <br />$ 51.1 <br />O16. <br />6A <br />Area A FD Additon Interior <br />$ 10,200.00 <br />$ - <br />$ - <br />$ 10,200.00 <br />$ 10,200.00 <br />$ 10,200.00 <br />100.00. <br />$ - <br />$ 510.00 <br />0-100 <br />6A <br />Area A FD R-c-bon <br />$ 1J,000.00 <br />$ - <br />$ - <br />$ 1J,000.OD <br />$ 1J,000.00 <br />$ 1J,000.00 <br />100.00% <br />$ - <br />$ 850.0E <br />06-6100 <br />6A <br />Area C PD Addition Envelope <br />$ 18,000.0E <br />$ - <br />$ - <br />$ 18,000.0E <br />$ 18,000.0E <br />$ 18,000.0E <br />1. 00% <br />$ - <br />$ 900.0E <br />-NO <br />6A <br />Area C PD Addition I-ior <br />$ 3,000.0E <br />$ - <br />$ - <br />$ 3,000.0E <br />$ 3,000.0E <br />$ 3,000.0E <br />100.00% <br />$ - <br />$ 150.0E <br />04610E <br />6A <br />Area CPD Renovation <br />$ 10,300.00 <br />$ - <br />$ - <br />$ 10,300.0E <br />$ 10,300.0E <br />$ 10,300.0E <br />100.00% <br />S15.E0 <br />o6-fiNO <br />6A <br />Area B PD Phasel <br />$ 15,000.0E <br />15,000.0E <br />$ 15,000.0E <br />$ 15,000.0E <br />100.00% <br />$ - <br />$ J50.E0 <br />06-fi100 <br />EA <br />Area B PD Phasel <br />$ 14,000.0E <br />$ - <br />$ - <br />$ 14,000.0E <br />$ 14,000.0E <br />$ 14,000.00 <br />100.00% <br />$ - <br />$ 700.00 <br />0& NO <br />6A <br />Alternate Ul-LL A-B <br />$ 2,000.0E <br />$ - <br />$ - <br />$ 1,OE000 <br />$ 2,000.0E <br />$ 2,000.0E <br />100.00% <br />100.0E <br />06-6100 <br />6A <br />Performance and Payment Bond <br />$ 4,500.0E <br />$ - <br />$ - <br />$ 4,500.0E <br />$ 4,500.0E <br />$ 4,500.00 <br />100.00% <br />$ - <br />$ 225.00 <br />P-100 <br />6A <br />Allowance <br />$ 10,000.0E <br />$ - <br />$ - <br />$ 10,000.0E <br />$ 10,00E.00 <br />$ 10,000.0E <br />No.. <br />$ - <br />$ 500.0E <br />0& NO <br />6A <br />Area A Materials <br />$ '15'00 <br />$ - <br />$ - <br />$ 12,500.0E <br />$ 12,500.0E <br />$ 12,500.00 <br />100.00% <br />$ - <br />$ 625.0E <br />06-6100 <br />6A <br />Area B Materials <br />$ 14,000.0E <br />$ - <br />$ - <br />$ 14,000.0E <br />$ 14,000.0E <br />$ 14,000.0E <br />100.00% <br />$ - <br />$ J00.E0 <br />04610E <br />6A <br />Area C Materials <br />$ 12,500.0E <br />$ - <br />$ - <br />$ 12,500.00 <br />$ 12,500.E0 <br />$ 12,500.00 <br />100.00% <br />$ - <br />$ fi25.1 <br />0& NO <br />6A <br />--PI Toilet Partifon <br />$ - <br />$ - <br />$ 1,81628 <br />$ 1,816.28 <br />$ 1,816.28 <br />$ 1,816.28 <br />100.00% <br />$ - <br />$ 90.81 <br />06-fi100 <br />EA <br />COU2 Used All-- <br />$ - <br />$ - <br />$ - <br />$ <br />- <br />UDIV/ol0& <br />No <br />6A <br />COU3 PDUpper Level Shades <br />$ - <br />$ - <br />$ 1Q9J0.30 <br />$ 10,970.30 <br />$ 10,9J0.30 <br />$ 1Q_30 <br />100.00% <br />$ - <br />$ 548.52 <br />O6-fi100 <br />6A <br />COp4 Eliminate WG-1 <br />$ - <br />$ - <br />$ (S,SOJ.11) <br />$ (8,50J.11) <br />$ �8,50J.11) <br />$ (B,SOJ.11) <br />100.ED <br />$ - <br />$ �425.3fi) <br />0-00 <br />6A <br />CD85A511 <br />$ - <br />$ - <br />$ 203.50 <br />$ 203.50 <br />$ 203.50 <br />$ 203.5E <br />100.00% <br />10.18 <br />06-6100 <br />6A <br />COU6-PRU14 <br />$ - <br />$ - <br />$ 898.04 <br />$ 898.04 <br />$ 898.04 <br />$ 898.04 <br />100.00%44.9E <br />0fi-6100 <br />6A <br />COUJ Allowance Usage <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />UDIV/0! <br />$ - <br />$ - <br />0G6100 <br />6A <br />COUS Added Cabinets on PD 1-12 <br />$ - <br />$ - <br />$ 2-1 <br />$ 248.42 <br />$ 248.42 <br />$ 248.42 <br />100.00% <br />$ - <br />$ 1-2 <br />06-6100 <br />6A <br />C089 Allowance Us- (- 1-8596.35) <br />$ - <br />$ - <br />$ - <br />$ <br />$ - <br />UDIV/0!- <br />06-fi100 <br />EA <br />COUlO Nlowance Usage Total-J958.35) <br />$ - <br />$ - <br />$ - <br />$ -$ <br />- <br />$ - <br />UDIV/0! <br />$ - <br />$ - <br />06-6100 <br />6A <br />COU11 Nlowance Redoaion(Toro16,602.55) <br />$ - <br />$ - <br />$ (1,355.80) <br />$ (1,355.80) <br />$ (1,355.80) <br />$ (1,355.80) <br />100.00% <br />$ - <br />$ (67.J9) <br />06-fi100 <br />6A <br />COU12 RHO120 <br />$ - <br />$ - <br />$ 1,125.95 <br />$ 1,121% <br />$ 1,82-5 <br />$ 1,825.95 <br />10O= <br />$ - <br />$ 91.3E <br />O6E100 <br />6A <br />CD813 Al..nte Usage( t-ming$58J9.33) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />UDIV/01 <br />$ - <br />$ - <br />06-6100 <br />6A <br />C-Allowancered-ion <br />$ - <br />$ - <br />$ (84fi.J6) <br />S (84fi.J6) <br />$ (846.J6) <br />$ (846.Jfi) <br />100.00% <br />$ - <br />$ (42.34) <br />0fi-6100 <br />6A <br />COU15 Delinearor Bollards at High Speed Daor <br />$ - <br />$ - <br />$ J18.43 <br />$ J18.43 <br />$ J18.43 <br />$ J18.43 <br />100.00% <br />$ - <br />$ 35.92 <br />06-6100 <br />6A <br />COp16 Rdin6h City of Elk River Sign <br />$ - <br />$ - <br />$ 1,3J8.00 <br />$ 1,3J8.00 <br />$ 1,3J8.00 <br />$ 1,3J8.00 <br />NO.00% <br />$ - <br />$ fi8.90 <br />00fi100 <br />6A <br />COU17 In Wall Backing/Cabinets PR30 <br />$ - <br />$ - <br />$ 3,500.0E <br />$ 3,500.0E <br />$ 3,500.0E <br />$ 3,500.00 <br />100.00% <br />$ - <br />$ 1J5.00 <br />06-fi100 <br />6A <br />COUSS Install Misc Trimin PDLeve11 <br />$ - <br />$ - <br />$ 183.22 <br />$ 183.22 <br />$ 183.22 <br />$ 183.22 <br />100.00% <br />$ - <br />$ 9.16 <br />04610E <br />6A <br />COUI9 PRU19 Added Scope <br />$ - <br />$ - <br />$ 2,666.0E <br />$ 2,6fifi.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,fi6fi.00 <br />$ - <br />o16100 <br />6A <br />COUZO Addto ReplaceE istinglnterior Signageat PD <br />$ - <br />$ - <br />$ 6,491.1E <br />$ 6,491.10 <br />$ 6,401.10 <br />$ 6,491.1E <br />1 co. <br />$ - <br />$ 324.56 <br />P-0 <br />6A <br />CDO21 Nlowance Ws (11-ining$2,671.57) <br />$ <br />$ - <br />$ - <br />UDIV/0! <br />$ - <br />$ - <br />06-6100 <br />6A <br />CM22 Nlowance ReallowGon <br />$ - <br />$ - <br />$ (2,171.51) <br />$ (2,6J1.5J) <br />$ (2,671.5J) <br />$ (2,-5J) <br />1.-% <br />$ - <br />$ (13).58) <br />0fi-6100 <br />6A <br />C0U23 Add to 1&111 Framed Mirrors at Shower Room(RFIU200) <br />$ - <br />$ - <br />$ 764.57 <br />$ 764.57 <br />$ J64.5J <br />$ Jfi4.5J <br />100.00% <br />$ - <br />$ 38.23 <br />06-6100 <br />6A <br />COp24 F&13 Additional l n[ Sgns <br />$ - <br />$ - <br />$ 40J.00 <br />$ 407.00 <br />$ - <br />407.00 <br />$ 40J.00 <br />100.00% <br />$ - <br />$ 20.35 <br />00fi100 <br />6A <br />CO025 F&I Replacement Industrial Curtain <br />$ - <br />$ - <br />$ 1,44J.53 <br />$ 1,44J.53 <br />$ - <br />1,44J.53 <br />$ 1,44J.53 <br />NO 00% <br />$ - <br />$ J2.38 <br />06-6200 <br />6B <br />Casework <br />$ 83,J50.00 <br />$ - <br />$ (1Q041.00) <br />$ 69,6709.0E <br />$ 69,J09.00 <br />$ 61 1.01 <br />100.00% <br />$ - <br />$ 3,485.45 <br />06-6200 <br />6B <br />COU1 MI 2R <br />$ - <br />$ - <br />$ (609.&fi) <br />$ (fiE9..6 <br />S (fi09.86) <br />S (609.86) <br />1D0.00% <br />$ - <br />$ (30.49) <br />O6E200 <br />6B <br />CG02 CORU3J Forn&Instal Window Sill PD L2 <br />$ - <br />$ - <br />$ 455.0E <br />$ 455.0E <br />$ 455.0E <br />$ 455.00 <br />100.00%$ <br />- <br />$ 22.J5 <br />06-6200 <br />6B <br />CC03 Added Cabinets on PD 1-12 <br />$ - <br />$ - <br />$ 3,521.0E <br />$ 3,521.0E <br />$ 3,521.0E <br />$ 3,521.00 <br />100.00% <br />$ - <br />$ 1Jfi.05 <br />Ofi-6200 <br />6B <br />C 4PRU16 <br />$ - <br />$ - <br />$ (J5.01) <br />$ (J5.DO) <br />$ (15.00) <br />$ (J5.00) <br />100.00% <br />$ - <br />$ (3.J5) <br />O6-fi2(10 <br />6B <br />COpS Coat hanger rod/shelf <br />$ - <br />$ - <br />$ 434.0E <br />$ 434.0E <br />$ 434.0E <br />$ 434.0E <br />100.00% <br />$ - <br />$ 21.67E <br />00fi200 <br />6B <br />COU6 PRAM Furnish Upper Cabinets <br />$ - <br />$ - <br />$ 1:2.00 <br />$ 1:200 <br />$ 4,01-0 <br />$ 4,03200 <br />100..'% <br />$ - <br />$ 201.fi0 <br />0& NO <br />fiB <br />COUJ Add ro Relaminate Wes[ Wall Coonter <br />$ - <br />$ - <br />$ 1,360.0E <br />$ 1,3fi0.DO <br />$ 1,360.0E <br />$ 1,360.00 <br />100.00% <br />$ - <br />$ 68.0E <br />0G6200 <br />6B <br />COU8Add TrimatP-Floor <br />$ - <br />$ - <br />$ 4672.0E <br />$ 4672.0E <br />$ 46720E <br />$ 4720E <br />100.00% <br />$ - <br />$ 23.6E <br />O6-fi200 <br />fiB <br />COU9 Furnish & In4all Bloe Cork Board in PD 165 <br />$ - <br />$ - <br />$ 1,3673.0E <br />$ 1,3673.0E <br />$ 1,373.00 <br />$ 1,3673.0E <br />100.00% <br />$ - <br />$ fi8.65 <br />O6E200 <br />6B <br />C-0 PRU19 Added Trim for Display Case&Patch work <br />$ - <br />$ - <br />$ 504.00 <br />$ 504.00 <br />$ 504.0E <br />$ 504.0E <br />100.00% <br />$ - <br />$ 252E <br />017211 <br />IC <br />Floid Applied Air Barriers-Polit- <br />$ 300.00 <br />$ - <br />$ - <br />$ 300.00 <br />$ 300.0E <br />$ 300.0E <br />100.00% <br />$ - <br />$ 15.0E <br />OJ- D <br />JC <br />Floid Applied Air Barriers-Poli- <br />S 450.00 <br />S - <br />$- <br />$450.0E <br />S 450.00 <br />S 450.0E <br />100.00% <br />S - <br />$ 22.5E <br />0J-J210 <br />JC <br />Floid Applied Air Barriers-H,M <br />$ 5,65J.00 <br />$ - <br />$ - <br />$ 5,65J.00 <br />$ 5,651.00 <br />$ 5,65J.00 <br />100.00% <br />$ - <br />$ 212.15 <br />OJ-J210 <br />JC <br />Flu id Applied Air Barriers-H,L <br />$ 8,289.0E <br />$ - <br />$ - <br />$ 8,289.0E <br />$ 8,289.00 <br />$ 8,289.0E <br />1 O"' <br />$ - <br />$ 414.45 <br />OJ-J210 <br />JC <br />C. Remove Air Barrierat ElFSfrom Scope <br />$ <br />$ (2,533.30) <br />$ (2,533.30) <br />$ (2,533.30) <br />$ (2,533.30) <br />100.00% <br />$ - <br />$ (1117 <br />0J-J210 <br />JC <br />CD02 RFIU59 <br />$ - <br />$ - <br />$ (889.J4) <br />$ (889.J4) <br />$ (889.J4) <br />$ (889.J4) <br />100.00% <br />$ - <br />$ <br />OJ-J510 <br />JA <br />Roofng-RoofngM <br />$ 128,9671.0E <br />$ - <br />$ - <br />$ 128,971.0E <br />$ 128,971.0E <br />$ 128,91.00 <br />100.00% <br />$ - <br />$ 6,448.55 <br />OJ-J530 <br />JA <br />Roofng-RoofngL <br />$ 86,804.0E <br />$ - <br />$ - <br />$ 86,804.00 <br />$ 86,804.00 <br />$ 86,801.0E <br />100.00% <br />$ - <br />$ 4,340.2E <br />O-J510 <br />JA <br />Roofng-Sieet Metal M <br />$ 3,983.00 <br />$ - <br />$ - <br />$ 3,983.0E <br />$ 3,-00 <br />$ 3,883.0E <br />1W== <br />$ - <br />$ 199.15 <br />