Laserfiche WebLink
Strucwral Fab <br />Strucwral Fab <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />Strucwral Fab <br />Structural Fab <br />Strucwral Fab <br />Strucwral Fab <br />Strucwral Fab <br />Strucwral Fab <br />Strucwral Fab <br />Strucwral Fab <br />Strucwral Fab <br />033300 <br />32D <br />CMFO Eeiminate sealer in 176 <br />$ - <br />$ - <br />$ (1495fi1 <br />$ (149.56) <br />$ (149.56) <br />$ (1-d <br />033300 <br />32D <br />-11 Add pour for PD card reader <br />$ - <br />$ - <br />$ 1,245.32 <br />$ 1,245.32 <br />$ 1,245.32 <br />$ 1,245.32 <br />033300 <br />32D <br />CM12 RF01116 Add Alt for Fence Pier <br />$ - <br />$ - <br />$ (2,816.fi5) <br />$ (2,816.65) <br />$ (2,816.65) <br />$ (2,816.65 <br />033400 <br />313 <br />Precast -Police Squad <br />$ 2W,826.W <br />$ - <br />$ - <br />$ 260,826.W <br />$ 2W,826.W <br />$ 260,826.W <br />033400 <br />3B <br />Precast -Fire Dept <br />$ 17,700.00 <br />$ - <br />$ - <br />$ 17,700.00 <br />$ 17,700.00 <br />$ 17,700.00 <br />- MO <br />3C <br />Polished Concrete <br />$ 12,360.00 <br />$ - <br />$ - <br />$ 12,360.00 <br />$ 12,360.00 <br />$ 11360.00 <br />033350 <br />3C <br />CD#1 Add to Polish Concretem Locker Rowe 120 <br />$ - <br />$ - <br />$ 676.00 <br />$ 676.00 <br />$ 67- <br />$ 676. <br />033350 <br />3C <br />- Credit W Eliminate Stained Concrete logo in Dayroom <br />$ - <br />$ - <br />$ (1,500.001 <br />$ (1,500.00) <br />$ (1,500.00) <br />$ (1,500.00 <br />-200 <br />4A <br />FD- Addition/Remode1034500 L <br />Labor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,.0.00 <br />$ 1,000.1 <br />$ 3,001.1 <br />04-02(10 <br />4A <br />FD- Addition/Remodel 034500 M <br />Material <br />$ 4,020.00 <br />$ - <br />$ - <br />$ 4,020.00 <br />$ 4,020.00 <br />$ 4,020.00 <br />04A2(10 <br />4A <br />FD-Addition/Remodel042000L <br />Labor <br />$ in,900.00 <br />$ - <br />$ - <br />$ 179,900.00 <br />$ iJ9,900.00 <br />$ iJ9,900.00 <br />04 0 <br />4A <br />FD-Addition/Remodel042000M <br />Material <br />$ 10J,800.00 <br />$ - <br />$ - <br />$ 107,'coo <br />$ 10J,800.00 <br />$ 10J,.- <br />04-0200 <br />4A <br />PD- Addition/Remodel 034500 L <br />Labor <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />F" 0 <br />4A <br />PD-Addition/Remodel D345MM <br />Material <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />_ 0 <br />4A <br />PD- Additinn/Remode1-_L <br />Labor <br />5 41,000.00 <br />5 - <br />5 - <br />$ 41,000.00 <br />$ 41,11.01 <br />$ 41,000.00 <br />P" 0 <br />4A <br />PD- Addition/Remodel 042000M <br />Material <br />$ 35,180.00 <br />$ - <br />$ - <br />$ 35,180.00 <br />$ 35,180.00 <br />$ 35,180.00 <br />F". <br />4A <br />CD#1 RFI#21 <br />$ - <br />$ - <br />$ 371.00 <br />$ 3J1.00 <br />$ 371.. <br />$ 3J1.00 <br />04-0200 <br />4A <br />CM2 RFI#41 <br />$ - <br />$ - <br />$ 2,320.00 <br />$ 2,320.CO <br />$ 2,320.W <br />$ 2,320.00 <br />F-O <br />4A <br />Ci- B. ckcharge Joist Pockets <br />$ - <br />$ - <br />$ (482.J6� <br />$ (482.J6) <br />$ (482.76) <br />$ (482.76 <br />o-'o <br />4A <br />CW3 PR#1R <br />$ - <br />$ - <br />$ 5,SJ6.00 <br />$ 5,8J6.00 <br />$ 5,S111 <br />$ 5,8J6.00 <br />P", <br />4A <br />CM5 RFI#36 <br />$ - <br />$ - <br />$ 1,J61.00 <br />$ 1,J61.CO <br />$ 1,76- <br />$ 1,J61.00 <br />F"' <br />4A <br />CD#6 RF0193 <br />$ - <br />$ - <br />$ (1,040.00( <br />$ (1,040.00( <br />$ (1,040.00( <br />$ (1,040.. <br />04Az00 <br />4A <br />CO#J RFI#JS Eliminate 4' Patch Work <br />$ - <br />$ - <br />$ (491.001 <br />$ (491.001 <br />$ (491.001 <br />$ (491.00 <br />04A200 <br />4A <br />Ci- Cut Bolts <br />$ - <br />$ - <br />$ fi91.00 <br />$ 691.00 <br />$ 691.00 <br />$ fi91.00 <br />F", <br />4A <br />-9 RFI#108 <br />$ - <br />$ - <br />$ J35.00 <br />$ J35.00 <br />$ J35.00 <br />$ J35.00 <br />04 n <br />4A <br />CM10 RF01130 <br />$ <br />$ J,186.00 <br />$ 7'.6.00 <br />$ J,186.00 <br />$ J,186.00 <br />F"" <br />4A <br />CO#11 Credit CMU above loi4 <br />$ - <br />$ - <br />$ (3,235.00( <br />$ (3,235.00) <br />$ (3,235.00( <br />$ (3,235.00 <br />o-'o <br />4A <br />-12 Add to Replace/Wash Brick at East Side of Fire <br />$ - <br />$ - <br />$ 1,J41.00 <br />$ 1,741.00 <br />$ - <br />$ 1,J41.00 <br />$ 1,J41.I <br />P-0 <br />4A <br />C-3 Back Charge fortrash enclosure gate modifications <br />$ - <br />$ - <br />$ (619.14) <br />$ (619.14) <br />$ - <br />$ (619.14) <br />$ (619.14 <br />04-0200 <br />4A <br />CW14T&M to patch Flre rated CMU WaIIs&Brick Washing <br />$ - <br />$ - <br />$ 3,010.00 <br />$ 3,010.00 <br />$ - <br />$ 3,010.00 <br />$ 3,010.00 <br />015120 <br />5A <br />Steel Supplier-StmcturaI Steel <br />$ 51,161.88 <br />$ - <br />$ - <br />$ 51,161.88 <br />$ 51,161.88 <br />$ 51,161.88 <br />0-120 <br />5A <br />Steel Supplier -Joist <br />$ 53,93J.50 <br />$ - <br />$ - <br />$ 53,93J.5' <br />$ 11 37.51 <br />$ 53,93J.50 <br />OS5120 <br />5A <br />Steel Supplier-0eck <br />$ 21732:50 <br />$ - <br />$ - <br />$ 23,J32.50 <br />$ 23,732.50 <br />$ 23,J32.50 <br />OS-5120 <br />5A <br />Ste el Supplier- Metal Fabrication <br />$ 26,118.12 <br />$ - <br />$ - <br />$ 26,118.12 <br />$ 26,118.12 <br />$ 26,118.12 <br />055120 <br />5A <br />C-RFI#21 <br />$ - <br />$ - <br />$ 1,034. J4 <br />$ 1,034.74 <br />$ 1,034.74 <br />$ 1,034.J4 <br />OS-5120 <br />5A <br />CD#2 PR#OB <br />$ - <br />$ - <br />$ (2,858.00( <br />$ (2,858.00( <br />$ (2,858.00( <br />$ (2,858.00 <br />_5120 <br />5A <br />CD#3 PR <br />$ - <br />$ - <br />$ 2,253.00 <br />$ 2,253.00 <br />$ 2,253.00 <br />$ 2,253.00 <br />O15120 <br />5A <br />C 4RFI#36 <br />$ - <br />$ - <br />$ 541.38 <br />$ 541.38 <br />$ 541.38 <br />$ 541.38 <br />-5120 <br />5A <br />-5-13 <br />$ - <br />$ - <br />$ 5J5.W <br />$ 5J5.00 <br />$ 5J5.00 <br />$ 5J5.00 <br />0-20 <br />5A <br />-6 RF019J <br />$ - <br />$ - <br />$ 1,JJ6.00 <br />$ 1,776.00 <br />$ 1,716.00 <br />$ 1,JJ6.00 <br />-5120 <br />5A <br />Ci-RFI#21 <br />$ - <br />$ - <br />$ .5.00 <br />$ .5.00 <br />$ 495.00 <br />$ 495.00 <br />0-120 <br />5A <br />Expedited Expedited Shipping <br />S - <br />$ - <br />$ J00.00 <br />$ J00.00 <br />S J00.00 <br />S MO.. <br />-5120 <br />5A <br />COp9 PR#1J <br />$ - <br />$ - <br />$ 2,898.00 <br />$ 2,898.00 <br />$ 2,898.00 <br />$ 2,891.1 <br />OS-5120 <br />5A <br />CD#lO Back Charge for Field Modify Trash Enclosure attachment methods <br />$ - <br />$ - <br />$ (635.40( <br />$ (635.40( <br />$ - <br />$ (635.40( <br />$ (635.40 <br />OS-5121 <br />5B <br />PD- Structura l St eel <br />Labor <br />$ 8,362.00 <br />$ - <br />$ - <br />$ 8,36Z00 <br />$ 8,362.00 <br />$ 8,361.00 <br />OS-5121 <br />SB <br />PD-Steelloist <br />labor <br />$ 6,SOO.W <br />$ - <br />$ - <br />$ 6,SOO.W <br />$ fi,500.W <br />$ 6,500.00 <br />OS-5121 <br />5B <br />PD-Steel Roof Deck <br />Labor <br />$ J,500.00 <br />$ - <br />$ - <br />$ J,500.00 <br />$ J,500.00 <br />$ J,500.00 <br />015121 <br />5B <br />PD-Metal Fab <br />Labor <br />$ 4,500.00 <br />$ - <br />$ - <br />$ 4,500.00 <br />$ 4,SM0.00 <br />$ 4,500.00 <br />OS-5121 <br />53 <br />PD-Metal Stairs <br />Labor <br />$ - <br />$ - <br />$ - <br />$ <br />$ - <br />OS5121 <br />5B <br />PD-Pipe&Tube Railings <br />labor <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />OS-5121 <br />5B <br />FD- Structural St eel <br />Labor <br />$ 2,J80.00 <br />$ - <br />$ - <br />$ 2,J80.00 <br />$ 2,J80.00 <br />$ 2,J80.00 <br />0-121 <br />5B <br />FD-Steelloist <br />labor <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />OS-5121 <br />5B <br />FD -St eel Roof Deck <br />Labor <br />$ 9,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ 4,000.W <br />$ 4,000.00 <br />OS-5121 <br />5B <br />FD - Metal Fab <br />labor <br />$ 1,J50.00 <br />$ - <br />$ - <br />$ 1,J50.00 <br />$ 1,J50.00 <br />$ 1,750.00 <br />05-5121 <br />5B <br />FD-Metal Stairs <br />Labor <br />$ 1,600.00 <br />$ <br />1,600.00 <br />$ 1,600.00 <br />$ i'doo.00 <br />OS5121 <br />5B <br />FD- Pipe&Tube Railings <br />Labor <br />$ 1,500.00 <br />$ - <br />$ - <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />o-121 <br />5B <br />Bond <br />$ 658.00 <br />$ - <br />$ - <br />$ 658.00 <br />$ 658.00 <br />$ 658.00 <br />- 121 <br />5B <br />CD#1 P-$ <br />- <br />$ - <br />$ 619.14 <br />$ 6." <br />$ 619.14 <br />$ 619.14 <br />OS-5121 <br />5B <br />CDIt3loist Pockets <br />$ - <br />$ - <br />$ "1.1 <br />$ 48236 <br />$ 482.J6 <br />$ 482.76 <br />o-121 <br />5B <br />CD#2 PR#1R <br />$ - <br />$ - <br />$ 1,721.04 <br />$ 1,721.04 <br />$ 1,721.04 <br />$ 1,721.04 <br />OS5121 <br />5B <br />_4 RFI#36 <br />$ - <br />$ - <br />$ 309.5J <br />$ 1157 <br />$ 309.5J <br />$ 309.5J <br />OS-5121 <br />5B <br />- RFI#JSAdded Crane Mob <br />$ - <br />$ - <br />$ dn.00 <br />$ 675.00 <br />$ 6J5.00 <br />$ fiJ5.00 <br />o-121 <br />5B <br />C.6 Plug Weld <br />1,355:1 <br />$ 1,355.80 <br />$ 1,355.80 <br />$ 1,.5.80 <br />OS5121 <br />5B <br />Ci- RFI#124 <br />$ - <br />$ - <br />$ (82552) <br />$ (825.52) <br />$ (825.52) <br />$ (825.52 <br />$ 62- <br />$ (140.83� <br />$ 13,041.30 <br />$ 885.00 <br />$ 11 1 <br />$ 33.80 <br />$ 75.a01 <br />$ 150.00 <br />$ 201.00 <br />$ 8,995.00 <br />$ 5, 90.00 <br />$ 2,050.DB <br />$ 9.00 <br />$ 11.55 <br />$ 116. <br />$ 124.141 <br />$ 293.80 <br />6 88.05 <br />5 34.55 <br />$ 36.J5 <br />$ 359.30 <br />$ (161.75) <br />$ 8J.05 <br />$ (30.96) <br />$ 150.50 <br />$ 2,558.09 <br />$ 2,fi9fi.88 <br />$ 1,186.63 <br />$ 1,305.91 <br />$ 5174 <br />$ (142.90) <br />$ 112.65 <br />$ 2.7 <br />$ 235 <br />$ 88.80 <br />$ 24.75 <br />$ 35.11 <br />$ 144.90 <br />$ (31.JJ) <br />$ 418.11 <br />$ in. <br />$ 3J5.00 <br />$ 225.00 <br />$ 139.00 <br />$ 100.00 <br />$ 200.00 <br />$ &J.50 <br />$ Sa.OB <br />$ 75.00 <br />$ 32.90 <br />$ 30.96 <br />$ 24.14 <br />$ 86.05 <br />$ 15.48 <br />$ 33.J5 <br />S 6J.J9 <br />