Laserfiche WebLink
SERVICE GROUP: <br />Water/Wastewater <br />REGISTRATION: <br />Professional Engineer <br />011RX341.106191 <br />EDUCATION: <br />MS Civil Engineering <br />(Environmental Focus) <br />North Dakota State <br />University 2017 <br />BS Civil Engineering <br />(Environmental Focus) <br />North Dakota State <br />University 2015 <br />MEMBERSHIPS: <br />WEF <br />AWWA - MN Chapter <br />Annual Conference <br />Research Committee <br />Member <br />CSWEA - MN Chapter <br />Resource Recovery and <br />Energy Committee Member <br />Ursinio Puga, PL <br />PROJECT ENGINEER <br />Ursinio is a registered Professional Engineer with experience providing water/wastewater <br />infrastructure planning, computer modeling, design, bidding, and construction <br />administration services to both industrial and municipal clients across the Midwest. <br />His extensive experience in water and wastewater pilot studies has allowed him to <br />participate in both regional and national professional conferences. Additionally, Ursinio <br />is also actively involved with professional organizations and participates in various local <br />committees. <br />More Development Sanitary Sewer Expansion Study I Rosemount, MN <br />CLIENT: CITY OF ROSEMOUNT <br />PROJECT DURATION: MAY 2019 - JUN 2019 <br />Ursinio served as a project engineer to conduct a full analysis of the serviceability of <br />approximately 3,100 acres located southeast of the City of Rosemount. Ursinio's analysis <br />included a study of the sanitary sewer infrastructure needed to provide municipal sewer <br />service to the Wore site, including the development of a computerized sewer model <br />highlighting the locations and size of the trunk sewers and lift stations. Ursinio also <br />analyzed the existing municipal sewer infrastructure downstream of the development to <br />ensure it had sufficient residual capacity to convey the projected wastewater flows. <br />Wastewater Treatment Plant PER I City of Mazeppa, MN <br />C;LILN L CITY OF MAZEPPA <br />PROJECT DURATION: NOV 2019 - DEC 2020 <br />Ursinio served as a project engineer to provide design and planning services for the <br />City of Mazeppa as part of the city's Preliminary Engineering Report preparation. This <br />project included a review of the existing wastewater system and a recommendation of <br />the improvements needed at the wastewater treatment facility. <br />2040 Comprehensive Plan I Andover, MN <br />CLIENT: CITY OF ANDOVER <br />P—r— '--- MAY 2018 - JUL 2018 <br />Ursinio provided infrastructure planning services to the City of Andover as part of <br />the city's 2040 Comprehensive Plan. This project included a hydraulic analysis of the <br />existing water distribution system, a demand and population projection through the <br />planning period, and the development of the city's ultimate water model with the goal <br />of identifying deficiencies throughout the water system and develop a timeline for the <br />future upgrades. <br />Proposal for Urban Expansion Services Expansion Study for Elk River Key Personnel Resumes 11 <br />