Laserfiche WebLink
Terra i ct Number 20.705 <br />Terra Ok RRiver Fre 3ation #3 <br />CONSTRUCTION Cit of Ok Rver <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 11 <br />Contractor's signed certification is attached. APPLICATION DATE: 12/31/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 12/31/22 <br />Use Column I on Contracts where variable retainage for line items may. a pply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D <br />E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />DOR E) <br />(D+E+F) <br />Quality Coatings <br />07-7210 <br />7C <br />Fluid Applied Air Barrier <br />$ 38,600.00 <br />$ - <br />$ - <br />$ 38,600.00 <br />$ 38,600.00 <br />$ 38,600.00 <br />100.00% <br />$ - <br />$ 1,930.00 <br />Quality Coatings <br />07-7210 <br />7C <br />00#1 ASI#8R Removal of Tranisition Membrane <br />$ - <br />$ - <br />$ (800.00) <br />$ (800.00) <br />$ (800.00) <br />$ (800.00) <br />100.00% <br />$ - <br />$ (40.00) <br />Quality Coatings <br />07-7210 <br />7C <br />Remove and Reinstall AB at W1 <br />$ - <br />$ - <br />$ 1,590.00 <br />$ 1,590.00 <br />$ 1,590.00 <br />$ 1,590.00 <br />100.00% <br />$ - <br />$ 79.50 <br />Horizon Roofing <br />07-7520 <br />7A & 7B <br />Roofing & Metal Wall Panels <br />$ 385,124.00 <br />$ - <br />$ - <br />$ 385,124.00 <br />$ 214,463.60 <br />$ 214,463.60 <br />55.69% <br />$ 170,660.40 <br />$ 10,723.18 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />00#1 ASI#5 LTAngles <br />$ - <br />$ - <br />$ 5,750.00 <br />$ 5,750.00 <br />$ 5,750.00 <br />$ 5,750.00 <br />100.00% <br />$ - <br />$ 287.50 <br />Horizon Roofing <br />07-7520 <br />7A & 7B <br />00#2 ASI#8R Reduction of Roof Membrane <br />$ - <br />$ - <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />100.00% <br />$ - <br />$ 130.00 <br />Horizon Roofing <br />07-7520 <br />7A & 7B <br />00#3 PR#14 Parapet Roofing Membrane <br />$ - <br />$ - <br />$ (1,650.00) <br />$ (1,650.00) <br />$ (1,650.00) <br />$ (1,650.00) <br />100.00% <br />$ - <br />$ (82.50) <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />CO44 Overtime Work on 11/6 <br />$ - <br />$ - <br />$ 2,682.00 <br />$ 2,682.00 <br />$ 2,682.00 <br />$ 2,682.00 <br />100.00% <br />$ - <br />$ 134.10 <br />Horizon Roofing <br />07-7520 <br />7A & 7B <br />00#5 RFI#100 <br />$ - <br />$ - <br />$ 1,350.00 <br />$ 1,350.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,350.00 <br />$ - <br />Sunrise Speciality <br />07-7900 <br />7D <br />Joint Sealants <br />$ 45,470.00 <br />$ - <br />$ - <br />$ 45,470.00 <br />$ - <br />$ - <br />0.00% <br />$ 45,470.00 <br />$ - <br />Sun riseSpeciality <br />07-7900 <br />7D <br />00#1 PR#2R Clerestory Head Detail <br />$ - <br />$ - <br />$ 35.00 <br />$ 35.00 <br />$ - <br />$ - <br />0.00% <br />$ 35.00 <br />$ - <br />Mid -Central Door <br />08-8200 <br />8A <br />Hardware <br />$ 41,653.67 <br />$ - <br />$ - <br />$ 41,653.67 <br />$ 24,041.51 <br />$ 24,041.51 <br />57.72% <br />$ 17,612.16 <br />$ 1,202.08 <br />Mid -Central Door <br />08-8200 <br />8A <br />HM Door <br />$ 22,208.67 <br />$ - <br />$ - <br />$ 22,208.67 <br />$ 8,923.70 <br />$ 13,284.97 <br />$ 22,208.67 <br />100.00% <br />$ - <br />$ 1,110.43 <br />Mid -Central Door <br />08-8200 <br />8A <br />HM Frame <br />$ 19,666.66 <br />$ - <br />$ - <br />$ 19,666.66 <br />$ 19,666.66 <br />$ 19,666.66 <br />100.00% <br />$ - <br />$ 983.33 <br />Mid -Central Door <br />08-8200 <br />8A <br />Specialty <br />$ 3,133.00 <br />$ - <br />$ - <br />$ 3,133.00 <br />$ 3,133.00 <br />$ 3,133.00 <br />100.00% <br />$ - <br />$ 156.65 <br />Mid -Central Door <br />08-8200 <br />8A <br />WD Door <br />$ 7,727.00 <br />$ - <br />$ - <br />$ 7,727.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,727.00 <br />$ - <br />Mid -Central Door <br />08-8200 <br />8A <br />00#1 Door Hardware Revisions(5/5/21) <br />$ - <br />$ - <br />$ 2,152.97 <br />$ 2,152.97 <br />$ - <br />$ 2,152.97 <br />$ 2,152.97 <br />100.00% <br />$ - <br />$ 107.65 <br />American Door Works <br />08-8361 <br />8B <br />Sectional Overhead Doors <br />$ 170,570.00 <br />$ - <br />$ - <br />$ 170,570.00 <br />$ - <br />$ - <br />0.00% <br />$ 170,570.00 <br />$ - <br />American Door Works <br />08-8361 <br />8B <br />00#1 PR#2 Overhead Doors & Circuiting <br />$ - <br />$ - <br />$ (37,217.00) <br />$ (37,217.00) <br />$ - <br />$ - <br />0.00% <br />$ (37,217.00) <br />$ - <br />American Door Works <br />08-8361 <br />8B <br />00#2 PR#12 Revised the 3 OH Doors <br />$ - <br />$ - <br />$ (36,410.00) <br />$ (36,410.00) <br />$ - <br />$ - <br />0.00% <br />$ (36,410.00) <br />$ - <br />Hallmark Glass <br />08-8800 <br />8C <br />Shop Drawings <br />$ 3,500.00 <br />$ - <br />$ - <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />100.00% <br />$ - <br />$ 175.00 <br />Hallmark Glass <br />08-8800 <br />8C <br />Bond <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />100.00% <br />$ - <br />$ 250.00 <br />Hallmark Glass <br />08-8800 <br />8C <br />Aluminum Labor <br />$ 32,630.00 <br />$ - <br />$ - <br />$ 32,630.00 <br />$ - <br />$ 25,000.00 <br />$ 25,000.00 <br />76.62% <br />$ 7,630.00 <br />$ 1,250.00 <br />Hallmark Glass <br />08-8800 <br />8C <br />Aluminum Material <br />$ 48,750.00 <br />$ - <br />$ - <br />$ 48,750.00 <br />$ 30,000.00 <br />$ 30,000.00 <br />61.54% <br />$ 18,750.00 <br />$ 1,500.00 <br />Hallmark Glass <br />08-8800 <br />8C <br />Door Hardware Labor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,000.00 <br />$ - <br />HallmarkGlass <br />08-8800 <br />8C <br />Door Hardware material <br />$ 26,000.00 <br />$ - <br />$ - <br />$ 26,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />7.69% <br />$ 24,000.00 <br />$ 100.00 <br />Hallmark Glass <br />08-8800 <br />8C <br />Glass & Glazing Labor <br />$ 10,200.00 <br />$ - <br />$ - <br />$ 10,200.00 <br />$ - <br />$ - <br />0.00% <br />$ 10,200.00 <br />$ - <br />HallmarkGlass <br />08-8800 <br />8C <br />Glass& Glazing Material <br />$ 29,000.00 <br />$ - <br />$ - <br />$ 29,000.00 <br />$ 12,000.00 <br />$ 12,000.00 <br />41.38% <br />$ 17,000.00 <br />$ 600.00 <br />Hallmark Glass <br />08-8800 <br />8C <br />Arch Louvers Labor <br />$ 1,620.00 <br />$ - <br />$ - <br />$ 1,620.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,620.00 <br />$ - <br />HallmarkGlass <br />08-8800 <br />8C <br />Arch Louvers Material <br />$ 3,800.00 <br />$ - <br />$ - <br />$ 3,800.00 <br />$ 3,800.00 <br />$ 3,800.00 <br />100.00% <br />$ - <br />$ 190.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Framing- Material <br />$ 19,873.00 <br />$ - <br />$ - <br />$ 19,873.00 <br />$ 19,873.00 <br />$ 19,873.00 <br />100.00% <br />$ - <br />$ 993.65 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Insulation - Material <br />$ 5,063.00 <br />$ - <br />$ - <br />$ 5,063.00 <br />$ 4,500.00 <br />$ 4,500.00 <br />88.88% <br />$ 563.00 <br />$ 225.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Drywall- Material <br />$ 20,024.00 <br />$ - <br />$ - <br />$ 20,024.00 <br />$ 18,000.00 <br />$ 18,000.00 <br />89.89% <br />$ 2,024.00 <br />$ 900.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Taping/Finishing- Material <br />$ 2,930.00 <br />$ - <br />$ - <br />$ 2,930.00 <br />$ - <br />$ 2,680.00 <br />$ 2,680.00 <br />91.47% <br />$ 250.00 <br />$ 134.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Sealants/Acoustical - Material <br />$ 2,500.00 <br />$ - <br />$ - <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />100.00% <br />$ - <br />$ 125.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />FRP- Material <br />$ 806.00 <br />$ - <br />$ - <br />$ 806.00 <br />$ - <br />$ - <br />0.00% <br />$ 806.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Framing- Labor <br />$ 33,795.00 <br />$ - <br />$ - <br />$ 33,795.00 <br />$ 30,255.00 <br />$ 30,255.00 <br />89.53% <br />$ 3,540.00 <br />$ 1,512.75 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Insulation - Labor <br />$ 6,500.00 <br />$ - <br />$ - <br />$ 6,500.00 <br />$ 2,500.00 <br />$ 3,500.00 <br />$ 6,000.00 <br />92.31% <br />$ 500.00 <br />$ 300.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Drywall- Labor <br />$ 22,810.00 <br />$ - <br />$ - <br />$ 22,810.00 <br />$ 9,000.00 <br />$ 11,529.00 <br />$ 20,529.00 <br />90.00% <br />$ 2,281.00 <br />$ 1,026.45 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Taping/Finishing - Labor <br />$ 23,301.00 <br />$ - <br />$ - <br />$ 23,301.00 <br />$ - <br />$ 20,970.00 <br />$ 20,970.00 <br />90.00% <br />$ 2,331.00 <br />$ 1,048.50 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Sealants/Acoustical - Labor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ - <br />$ 2,500.00 <br />$ 2,500.00 <br />83.33% <br />$ 500.00 <br />$ 125.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />FRP- Labor <br />$ 630.00 <br />$ - <br />$ - <br />$ 630.00 <br />$ - <br />$ - <br />0.00% <br />$ 630.00 <br />$ - <br />N iemela Design and Construction <br />09-9250 <br />9A <br />Equipment - Lift <br />$ 7,500.00 <br />$ - <br />$ - <br />$ 7,500.00 <br />$ 5,000.00 <br />$ 1,500.00 <br />$ 6,500.00 <br />86.67% <br />$ 1,000.00 <br />$ 325.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Mobilization <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />100.00% <br />$ - <br />$ 250.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Bonding <br />$ 2,915.00 <br />$ - <br />$ - <br />$ 2,915.00 <br />$ 2,915.00 <br />$ 2,915.00 <br />100.00% <br />$ - <br />$ 145.75 <br />Page 3 / 8 <br />