Terra ct Number 20.705 <br />i <br />Terra Ok RRiver Fre 3ation #3 <br />CONSTRUCTION Cit of Ok Rver <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 11 <br />Contractor's signed certification is attached. APPLICATION DATE: 12/31/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 12/31/22 <br />Use Column I on Contracts where variable retainage for line items may. a pply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D <br />E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />DOR E) <br />(D+E+F) <br />Distinctive Iron <br />05-5120 <br />5A <br />Steel Material-Misc <br />$ 67,006.25 <br />$ - <br />$ - <br />$ 67,006.25 <br />$ 64,506.25 <br />$ 64,506.25 <br />96.27% <br />$ 2,500.00 <br />$ 3,225.31 <br />Distinctive Iron <br />05-5120 <br />5A <br />00#1 Salvaged Steel Bollards <br />$ - <br />$ - <br />$ (1,232.00) <br />$ (1,232.00) <br />$ (1,232.00) <br />$ (1,232.00) <br />100.00% <br />$ - <br />$ (61.60) <br />Distinctive Iron <br />05-5120 <br />5A <br />00#2 Increased RTU Loads <br />$ - <br />$ - <br />$ 1,305.28 <br />$ 1,305.28 <br />$ 1,305.28 <br />$ 1,305.28 <br />100.00% <br />$ - <br />$ 65.26 <br />Distinctive Iron <br />05-5120 <br />5A <br />00#3 RFI#54 W8 Beam Connections <br />$ - <br />$ - <br />$ 1,406.22 <br />$ 1,406.22 <br />$ 1,406.22 <br />$ 1,406.22 <br />100.00% <br />$ - <br />$ 70.31 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO44 RFI#46 Trench Drain Grates <br />$ - <br />$ - <br />$ 415.34 <br />$ 415.34 <br />$ 415.34 <br />$ 415.34 <br />100.00% <br />$ - <br />$ 20.77 <br />Distinctive Iron <br />05-5120 <br />5A <br />00#5 Predrilling Sill Angles for Century to Install <br />$ - <br />$ - <br />$ 676.41 <br />$ 676.41 <br />$ 676.41 <br />$ 676.41 <br />100.00% <br />$ - <br />$ 33.82 <br />Distinctive Iron <br />05-5120 <br />5A <br />00#6 RFI#69 Removal of6x4x1/4" Angle At OH App Doors <br />$ - <br />$ - <br />$ (2,038.93) <br />$ (2,038.93) <br />$ (2,038.93) <br />$ (2,038.93) <br />100.00% <br />$ - <br />$ (101.95) <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#7 ASI#8R Roof Transitions <br />$ - <br />$ - <br />$ 6,193.52 <br />$ 6,193.52 <br />$ 6,193.52 <br />$ 6,193.52 <br />100.00% <br />$ - <br />$ 309.68 <br />Distinctive Iron <br />05-5120 <br />5A <br />00#8 DI Pre Drilling <br />$ - <br />$ - <br />$ 468.54 <br />$ 468.54 <br />$ 468.54 <br />$ 468.54 <br />100.00% <br />$ - <br />$ 23.43 <br />Distinctive Iron <br />05-5120 <br />5A <br />00#9 COR#37 Added 2 Loose Lintels <br />$ - <br />$ - <br />$ 512.65 <br />$ 512.65 <br />$ 512.65 <br />$ 512.65 <br />100.00% <br />$ - <br />$ 25.63 <br />Distinctive Iron <br />05-5120 <br />5A <br />00#10 COR#38R Added Steel <br />$ - <br />$ - <br />$ 3,702.44 <br />$ 3,702.44 <br />$ 3,702.44 <br />$ 3,702.44 <br />100.00% <br />$ - <br />$ 185.12 <br />Distinctive Iron <br />05-5120 <br />5A <br />00#11 RFI#103 Angles Above W1 Windows <br />$ - <br />$ - <br />$ 1,062.67 <br />$ 1,062.67 <br />$ 1,062.67 <br />$ 1,062.67 <br />100.00% <br />$ - <br />$ 53.13 <br />Distinctive Iron <br />05-5120 <br />5A <br />00#12 RFI#109 <br />$ - <br />$ - <br />$ (212.00) <br />$ (212.00) <br />$ (212.00) <br />$ (212.00) <br />100.00% <br />$ - <br />$ (10.60) <br />Distinctive Iron <br />05-5120 <br />5A <br />00#13 RFI#100 <br />$ - <br />$ - <br />$ 2,775.64 <br />$ 2,775.64 <br />$ - <br />$ - <br />0.00% <br />$ 2,775.64 <br />$ - <br />Distinctive Iron <br />05-5120 <br />5A <br />00#14 Replacement MC6x12 <br />$ - <br />$ - <br />$ 2,135.02 <br />$ 2,135.02 <br />$ 2,135.02 <br />$ 2,135.02 <br />100.00% <br />$ - <br />$ 106.75 <br />Patriot Erectors <br />05-5121 <br />5B <br />Structural Steel Erection <br />$ 58,000.00 <br />$ - <br />$ - <br />$ 58,000.00 <br />$ 53,000.00 <br />$ 5,000.00 <br />$ 58,000.00 <br />100.00% <br />$ - <br />$ 2,900.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />Joists & Decking <br />$ 29,575.00 <br />$ - <br />$ - <br />$ 29,575.00 <br />$ 29,575.00 <br />$ 29,575.00 <br />100.00% <br />$ - <br />$ 1,478.75 <br />Patriot Erectors <br />05-5121 <br />5B <br />Metal Fabrications <br />$ 26,175.00 <br />$ - <br />$ - <br />$ 26,175.00 <br />$ 15,000.00 <br />$ 6,000.00 <br />$ 21,000.00 <br />80.23% <br />$ 5,175.00 <br />$ 1,050.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />Bond <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />100.00% <br />$ - <br />$ 200.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />00#1 PR#2R Clerestory Head Detail <br />$ - <br />$ - <br />$ 6,784.00 <br />$ 6,784.00 <br />$ 6,784.00 <br />$ 6,784.00 <br />100.00% <br />$ - <br />$ 339.20 <br />Patriot Erectors <br />05-5121 <br />5B <br />00#2 LT GA 3x3 Cavity Closure Angle Install <br />$ - <br />$ - <br />$ 1,272.00 <br />$ 1,272.00 <br />$ 1,272.00 <br />$ 1,272.00 <br />100.00% <br />$ - <br />$ 63.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />00#3 RFI#69 Removal of angle at App Doors <br />$ - <br />$ - <br />$ (1,060.00) <br />$ (1,060.00) <br />$ (1,060.00) <br />$ (1,060.00) <br />100.00% <br />$ - <br />$ (53.00) <br />Patriot Erectors <br />05-5121 <br />5B <br />CO44 ASI#8R Roof Transition <br />$ - <br />$ - <br />$ 530.00 <br />$ 530.00 <br />$ 530.00 <br />$ 530.00 <br />100.00% <br />$ - <br />$ 26.50 <br />Patriot Erectors <br />05-5121 <br />5B <br />00#5 RFI#92 Slab Edge Detail at Mezzanine Opening <br />$ - <br />$ - <br />$ 230.00 <br />$ 230.00 <br />$ 230.00 <br />$ 230.00 <br />100.00% <br />$ - <br />$ 11.50 <br />Patriot Erectors <br />05-5121 <br />5B <br />00#6 PR#16 <br />$ - <br />$ - <br />$ 477.00 <br />$ 477.00 <br />$ 477.00 <br />$ 477.00 <br />100.00% <br />$ - <br />$ 23.85 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#7 RFI#103 Angles Above W1 Windows <br />$ - <br />$ - <br />$ 424.00 <br />$ 424.00 <br />$ - <br />$ - <br />0.00% <br />$ 424.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />00#8 RFI#109 <br />$ - <br />$ - <br />$ 212.00 <br />$ 212.00 <br />$ - <br />$ - <br />0.00% <br />$ 212.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />00#9 RFI#100 <br />$ - <br />$ - <br />$ 742.00 <br />$ 742.00 <br />$ - <br />$ - <br />0.00% <br />$ 742.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Performance & Payment Bond <br />$ 6,400.00 <br />$ - <br />$ - <br />$ 6,400.00 <br />$ 6,400.00 <br />$ 6,400.00 <br />100.00% <br />$ - <br />$ 320.00 <br />Century Construction <br />06-6100 <br />6A <br />Allowance <br />$ 10,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ 855.00 <br />$ 2,127.00 <br />$ 2,982.00 <br />29.82% <br />$ 7,018.00 <br />$ 149.10 <br />Century Construction <br />06-6100 <br />6A <br />Mobilization <br />$ 3,100.00 <br />$ - <br />$ - <br />$ 3,100.00 <br />$ 930.00 <br />$ 310.00 <br />$ 1,240.00 <br />40.00% <br />$ 1,860.00 <br />$ 62.00 <br />Century Construction <br />06-6100 <br />6A <br />Materials <br />$ 97,000.00 <br />$ - <br />$ - <br />$ 97,000.00 <br />$ - <br />$ 10,000.70 <br />$ 10,000.70 <br />10.31% <br />$ 86,999.30 <br />$ 500.04 <br />Century Construction <br />06-6100 <br />6A <br />Material Blocking <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,000.00 <br />$ 10,800.00 <br />$ 1,200.00 <br />$ 12,000.00 <br />100.00% <br />$ - <br />$ 600.00 <br />Century Construction <br />06-6100 <br />6A <br />Install Roof Blocking <br />$ 43,000.00 <br />$ - <br />$ - <br />$ 43,000.00 <br />$ 43,000.00 <br />$ 43,000.00 <br />100.00% <br />$ - <br />$ 2,150.00 <br />Century Construction <br />06-6100 <br />6A <br />Install In Wall Blocking <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ 7,200.00 <br />$ 800.00 <br />$ 8,000.00 <br />100.00% <br />$ - <br />$ 400.00 <br />Century Construction <br />06-6100 <br />6A <br />Cabinets and Millwork <br />$ 8,500.00 <br />$ - <br />$ - <br />$ 8,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 8,500.00 <br />$ - <br />Cantu ryConstruction <br />06-6100 <br />6A <br />Specialties <br />$ 32,000.00 <br />$ - <br />$ - <br />$ 32,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 32,000.00 <br />$ - <br />Cantu ryConstruction <br />06-6100 <br />6A <br />Temp Enclosures <br />$ 6,000.00 <br />$ - <br />$ - <br />$ 6,000.00 <br />$ 6,000.00 <br />$ 6,000.00 <br />100.00% <br />$ - <br />$ 300.00 <br />Century Construction <br />06-6100 <br />6A <br />Doors&Hardware <br />$ 17,000.00 <br />$ - <br />$ - <br />$ 17,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 17,000.00 <br />$ - <br />Cantu ryConstruction <br />06-6100 <br />6A <br />00#1 For Distinctive to Predrill Sill Angles <br />$ - <br />$ - <br />$ (676.41) <br />$ (676.41) <br />$ (676.41) <br />$ (676.41) <br />100.00% <br />$ - <br />$ (33.82) <br />Century Construction <br />06-6100 <br />6A <br />00#2 PR#15 Flagpoles <br />$ - <br />$ - <br />$ (277.00) <br />$ (277.00) <br />$ (277.00) <br />$ (277.00) <br />100.00% <br />$ - <br />$ (13.85) <br />Century Construction <br />06-6100 <br />6A <br />00#3 Disctinctive Predrill Holes for Operable Partition <br />$ - <br />$ - <br />$ (468.54) <br />$ (468.54) <br />$ (468.54) <br />$ (468.54) <br />100.00% <br />$ - <br />$ (23.43) <br />Century Construction <br />06-6100 <br />6A <br />CO44 Wood Blocking at Heads of W1 (Used $855 of Allowance) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />$ <br />Century Construction <br />06-6100 <br />6A <br />00#5 RFI#110 Wood Blocking <br />$ - <br />$ - <br />$ 534.35 <br />$ 534.35 <br />$ - <br />$ 534.35 <br />$ 534.35 <br />100.00% <br />$ - <br />$ 26.72 <br />Century Construction <br />06-6100 <br />6A <br />00#6 Allowance Usage (Remaining $8,290) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />CO#7 Allowance Usage (Remaining $7,018) <br />$ - <br />$ - <br />$ (1,272.00) <br />$ (1,272.00) <br />$ - <br />$ (1,272.00) <br />$ (1,272.00) <br />100.00% <br />$ - <br />$ (63.60) <br />Century Construction <br />06-6100 <br />6A <br />00#8PR#18 Added Paper Towel/Trash Units <br />$ - <br />$ - <br />$ 2,248.00 <br />$ 2,248.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,248.00 <br />$ - <br />Northern Woodwork <br />06-6400 <br />6B <br />Architectural Millwork <br />$ 45,900.00 <br />$ - <br />$ - <br />$ 45,900.00 <br />$ 211.76 <br />$ 211.76 <br />0.46% <br />$ 45,688.24 <br />$ 10.59 <br />Northern Woodwork <br />06-6400 <br />6B <br />00#1 PR#18 <br />$ - <br />$ - <br />$ 165.00 <br />$ 165.00 <br />$ - <br />$ - <br />0.00% <br />$ 165.00 <br />$ - <br />Page 2 / 8 <br />